RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints0✓ClearClear
Land conversionNot verified yet
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the landNot checked
Cases on the builderNot checked
RERA complaintsNo cases
Builder's other projects4 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Forfeiture, agreementNot verified yet
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Not verified yet
Payments
Payment plan
Not verified yet
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Not verified yet
Form 4 certified totals
Location & risks
What is the location like?
Height above nearest drainNot verified yet
Groundwater, taluk average22.7 m below groundBengaluru North taluk, July 2023
Water supply, as filedLocal authorityDeclared by the promoter
Metro, operationalabout 8.5 kmMadavara
The site
Zoning & hazards
Construction & progress
How is it being built, and when will it be ready?
Red flag1 red flag
CompletionLapsed
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Lapsed
Work left
By component
Lapsed
Developer
Can the developer deliver?
Review1 to review
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldLapsed
Sold in the latest quarterLapsed
Funding
Estimated cost
Not verified yet
Cost left vs buyer dues
Not verified yet
Form 4
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed67On K-RERA
Available3958% of filed
K-RERA only28
Approvals with a validity dateNone read
Approvals & NOCs
3 pagesAvailable
K-RERA only
K-RERA only
2 pagesAvailable
K-RERA only
1 pageAvailable
K-RERA only
K-RERA only
1 pageAvailable
K-RERA only
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
Source: K-RERA project page and the documents filed there, as read by us. 4 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 220 kV
Its corridor, to scale
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
Water at a glance
Groundwater
Bengaluru North taluk average, July 2023: 22.7 m below ground
What it means
Not verified yet
Water below ground
22.7 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Straight-line distance from the site
Nuisances
Distance from the filed pin
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km
Quarterly return
Lapsed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
Not verified yet
RERA completion date
7 Mar 2024
×Red flag
Work began, as filed
7 Mar 2019
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot