Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 1 Lakh Multi Storied Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Jul 2023 |
| 7hills CourtyardApplied for completion 22/05/2024 | 7HILLS PROPERTIES | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| 96 Brick Wood AvenueActive · 9% built | Cinoti ventures LLP | Apartment | 851–1,084 sqft carpet (as filed) | May 2031 |
| Aratt-Escapes Phase 2Active · 67% built | ARATT CITY TOWERS LLP | Plot | ~1,670–2,120 sqft (estimate: filed carpet plus 25%) | Apr 2028 |
| Bellevue NestApplied for completion 03/03/2026 | AFFAIRAL GLOBAL FASHION PRIVATE LIMITED | Plot | – | Mar 2026 |
| Canterbury LakesideLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Vyasti Project |
| Plot |
| – |
| Nov 2025 |
| Canterbury Meadows Phase 2Applied for completion 30/10/2024 | Arunapanchami Estates Private Limited | Plot | ~1,160–1,500 sqft (estimate: filed carpet plus 25%) | Nov 2023 |
| Canterbury Orchards IILapsed · completion date passed | SLNS AVYUKTHA HOMES | Plot | – | Mar 2023 |
8 of 43 other projects in North Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open G K Green Valley in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 11 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 11 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 11 km | Locked | |
| Sattva Vasanta Skye | about 11.5 km | Locked |
| G K Green Valley This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 11 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 11 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 20.5 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 3 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 3 km to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 12.5 km, Doddajala | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sattva Vasanta Cove | about 11.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 11 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Sattva Vasanta Skye | about 11.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Sattva Vasanta Cove | about 11.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Kempegowda Airport | 26.5 | 15.5 |
| MG Road (CBD) | 44.5 | 35.5 |
| Manyata Tech Park | 37.5 | 28 |
| ITPL, Whitefield | 58 | 37.5 |
| Ecospace, Bellandur ORR | 68.5 | 42 |
| Electronic City Ph 1 | 64 | 51.5 |
| Sewage treatment plant |
|---|
| about 2.5 km to the north-east |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|