Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | 1 | 1 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 2 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the Rain |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 51 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Total Environment |
| Villa |
| 3,184–5,182 sqft |
| Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Legacy Salvador in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 13,152 sq m | |
| Joint development agreement number | 5949 of Book 1, 2015-16 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| BESCOM | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 195 CON 2015 · issued 17 Mar 2016 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | Granted · Approved 25 May 2023 | |
|---|---|---|
| RERA complaints | 2 | |
| RERA completion date | 31 Dec 2026 |
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Kogilu cross behind Udupi Grand hotel | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Electricity, built | 0% | |
|---|---|---|
| Community Hall, built | 0% | |
| Swimming Pool, built | 30% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 18 May 2019 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 17 Mar 2020 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 6 Apr 2020 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 14 Sep 2016 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 195 CON 2015 · issued 17 Mar 2016 | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Land · ₹4.42 Cr 7.7%Development · ₹52.71 Cr 92.3%
| Estimated cost | ₹57.13 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹15.14 Cr | |
| Land cost revision | Not verified yet | |
Sold (119) 71.3%Unsold (48) 28.7%
| Sold, Q3 2025-26 | 117 / 167 · 50 available | |
|---|---|---|
| Sold, Q4 2025-26 | 119 / 167 · 48 available | |
| Sold, Q1 2026-27 | 119 / 167 · 48 available | |
| Sold, Q2 2026-27 | 119 / 167 · 48 available | |
| Unsold, Q2 2026-27 | 48 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · Miller road | |
|---|---|---|
| Designated account, collected | ₹27.6 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹27.6 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹61,56,00,000 | |
| Net amount withdrawable, Form 4 | ₹32,34,26,588 | |
| Escrow account, Q4 2025-26 | ₹1.47 Cr withdrawn | |
| Escrow account, Q3 2025-26 | Opened at ₹56.2 L, ₹2.07 Cr deposited from sales | |
| Escrow account to date, Q1 2026-27 | ₹29.22 Cr deposited from sales, ₹29.22 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹29,21,73,412 | |
| Share of collections deposited in escrow | 79.79% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 2 | |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 7 | Review |
| Complaints filed against the promoter | 18 | |
| Other phases under this promoter name | 10 | |
| With a filed extension or completion | 5 (1 completed, 4 extended) | |
| Average schedule slip | 37 months |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | HDFC · Miller road |
|---|

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 0.5 km, Yelahanka | |
| Kempegowda Airport | 16 |
| MG Road (CBD) | 14 |
| Manyata Tech Park | 6.5 |
| ITPL, Whitefield | 19.5 |
| Ecospace, Bellandur ORR | 21 |
| Electronic City Ph 1 | 30 |
| Landfill or waste transfer station | about 3 km to the south | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 3 km to the east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |