Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aadya SereneExtended to 24-03-2028 | M/s. JUST NATURAL | Apartment | – | Mar 2028 |
| Akasha By Essem18Active · 32% built | Essem18 Developers Private Limited |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 592–1,229 sqft carpet (as filed) |
| May 2029 |
| Amigo AmparoExtended to 30-12-2026 | AMIGO PROPERTIES INDIA LLP | Apartment | 906–1,062 sqft carpet (as filed) | Dec 2026 |
| Antaliea HomesLapsed · completion date passed | VNG Developers | Apartment | 2,217 sqft carpet (as filed) | Jul 2019 |
| Aparna MapleCompleted · OC 21-04-2022 | Aparna Constructions And Estates Pvt Ltd | Apartment | 721 sqft carpet (as filed) | Completed |
| Assetz Zen & SatoActive · 60% built | APG TOWNSHIPS PRIVATE LIMITED | Apartment | 267–1,962 sqft carpet (as filed) | May 2030 |
| Baldota SummitActive · 18% built | BALDOTA BUILDERS AND DEVELOPERS | Apartment | 976–986 sqft carpet (as filed) | Mar 2030 |
| Bhartiya City Nikoo Homes 1Completed (regulator flag) | Bhartiya City | Apartment | 620–2,800 sqft | Completed |
8 of 72 other projects in Thanisandra, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lodha Mirabelle in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 11 May 2023 · No. BDA/TPM/TPM/DLP-65/10-11/331/2023-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/045/2023 · issued 11 Apr 2023 | Clear |
| Environmental clearance | SEIAA 136 CON 2020 · issued 1 Oct 2021 | Clear |
| Airport height NOC | permissible top elevation 1032.75 m above mean sea level | |
| Pollution board (CFE) | consent order CTE-337999 · issued 6 Jun 2023 · valid until 30 Sep 2031 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2028 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 54/1 | Converted 3 Jun 2004 · Special Deputy Commissioner, Bangalore District | |
| Sy 56/1, 56/2 | Converted 4 Jan 2003 · Special Deputy Commissioner, Bangalore District | |
| Sy 56/3 | Converted 28 Nov 2002 · Special Deputy Commissioner, Bangalore District | |
| Sy 56/4 | Converted 2 Jun 2004 · Special Deputy Commissioner, Bangalore District | |
| Survey numbers | 54/1 · 56/1 · 56/2 · 56/3 · 56/4 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 78% Residential (main), 12% Parks & open space, 10% Valley / drain buffer | Review |
|---|---|---|
| Nearest high-tension line | A 220 kV line crosses the site, its corridor taking about 3% (about 3,090 m²), with 2 transmission towers standing inside the outline | Review |
| Nearest government-flagged flood location | 390 m, Manyata tech park, MS Ramaiah north city To element mall | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 110 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the south-east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.22 (96 covered spaces for 437 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 15 Mar 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 18% · planned by 4 Mar 2028 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 88% | |
| Completion, accountant | 90.8% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Apr 2028 | |
| RERA completion date | 30 Jun 2028 | |
| Work began, as filed | 1 Nov 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 89.2 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 150 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/045/2023 · issued 11 Apr 2023 | |
| Environmental clearance | SEIAA 136 CON 2020 · issued 1 Oct 2021 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Engineer's certificate, registration | Dated 6 Oct 2023 | |
| Chartered accountant's certificate, registration | Dated 6 Oct 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹74.85 Cr 19.1%Development · ₹317.91 Cr 80.9%
| Estimated cost | ₹392.76 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹248.42 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹564.72 Cr | |
| Cost incurred | ₹512.76 Cr (90.8% of the estimate) | |
| Cost left | ₹51.96 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹90.86 Cr | |
| Land cost revision | Not verified yet | |
Sold (418) 95.7%Unsold (19) 4.3%
| Sold, Q3 2025-26 | 418 / 437 · 19 available | |
|---|---|---|
| Sold, Q4 2025-26 | 418 / 437 · 19 available | |
| Sold, Q1 2026-27 | 418 / 437 · 19 available | |
| Sold, Q2 2026-27 | 418 / 437 · 19 available | |
| Unsold, Q2 2026-27 | 19 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | ICICI Bank | |
|---|---|---|
| Designated account, collected | ₹514.13 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹378.76 Cr in Q2 2026-27 (74% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹1,31,97,02,406 | |
| Withdrawn from the escrow account to date | ₹3,80,78,86,190 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 0 | |
| Revoked or withdrawn | 1 | |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 11 May 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank | |

Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 520 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 110 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 1.0 km, Nagawara | |
| Kempegowda Airport | 18.7 |
| MG Road (CBD) | 8.7 |
| Manyata Tech Park | 0.8 |
| ITPL, Whitefield | 14.0 |
| Ecospace, Bellandur ORR | 15.1 |
| Electronic City Ph 1 | 24.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.1 km to the west, named Hebbal 60MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 460 m to the north |