Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 71 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | 2 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed | Aswani Properties India Pvt Ltd | Apartment | 377 sqft carpet (as filed) | Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 64 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
All 70 projects in Hosur Road → · Mahindra Lifespaces's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahindra Zen in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 29 Feb 2024 · No. BBMP/Addl.Dir/JDSOUTH/0026/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/212/2023 · issued 11 Aug 2023 · building height 80.1 m | Clear |
| Environmental clearance | SEIAA 102 CON 2023 · EC identification no. EC23B038KA129477 · issued 7 Jul 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-339472 · issued 5 Sep 2023 · valid until 6 Jul 2033 | Clear |
| Water and sewerage NOC (BWSSB) | issued 26 May 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 5 Nov 2022 · DC, Bangalore | |
|---|---|---|
| Survey numbers | 406/391/379/65/116 · 406/391/379/65/116 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 160 m from the filed location | Clear |
| Nearest government-flagged flood location | 610 m, SUBASH NAGARA | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 180 m to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 310 m to the south, Beguru Chikka Kere Basapura Kere | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (229 covered spaces for 228 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 61% · planned by 1 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 2 Sep 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 61% | |
| Completion, accountant | 51.1% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Dec 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 80.1 m on the fire NOC · 80.1 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 117.73 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/212/2023 · issued 11 Aug 2023 · building height 80.1 m | |
| Environmental clearance | SEIAA 102 CON 2023 · EC identification no. EC23B038KA129477 · issued 7 Jul 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 3 Oct 2023 | |
| Engineer's certificate, registration | Dated 4 Oct 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹73.32 Cr 26.3%Development · ₹205.66 Cr 73.7%
| Estimated cost | ₹278.98 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹176.46 Cr | |
| Cost incurred | ₹142.45 Cr (51.1% of the estimate) | |
| Cost left | ₹136.53 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹187.46 Cr | |
| Land cost revision | Not verified yet | |
Sold (227) 99.6%Unsold (1) 0.4%
| Sold, Q3 2025-26 | 227 / 228 · 1 available | |
|---|---|---|
| Sold, Q4 2025-26 | 227 / 228 · 1 available | |
| Sold, Q1 2026-27 | 227 / 228 · 1 available | |
| Sold, Q2 2026-27 | 227 / 228 · 1 available | |
| Unsold, Q2 2026-27 | 1 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · Ground Floor, JR Plaza, No. 6, Kanakapura Road, Raghuvanahalli | |
|---|---|---|
| Designated account, collected | ₹39.46 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹28.33 Cr in Q2 2026-27 (72% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 29 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Ground Floor, JR Plaza, No. 6, Kanakapura Road, Raghuvanahalli | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 190 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 180 m to the north, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 850 m, Hosa Road | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 36.9 |
| MG Road (CBD) | 12.4 |
| Manyata Tech Park | 19.4 |
| ITPL, Whitefield | 16.1 |
| Ecospace, Bellandur ORR | 7.1 |
| Electronic City Ph 1 | 5.1 |
| Landfill or waste transfer station | 2.0 km to the south | |
|---|---|---|
| Sewage treatment plant | 1.5 km to the north-west, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 2.2 km to the south-west | |
| Crematorium | 2.4 km to the north, named Kudlu Crematorium on OpenStreetMap | |
| Prison | 2.0 km to the east, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 1.4 km to the east, named Naganathapura Substation on OpenStreetMap |