Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 3 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh Pinecourt |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 87 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Varin Infra Projects Private Limited |
| Apartment |
| 382–1,141 sqft carpet (as filed) |
| Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva La Vita in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 2 Nov 2023 · No. BBMP/Addl.Dir/JDNORTH/0015/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 96 CON 2022 · EC identification no. EC22B038KA163483 · issued 29 Aug 2022 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-333743 · issued 10 Oct 2022 · valid until 9 Oct 2027 | Clear |
| Water and sewerage NOC (BWSSB) | issued 20 Feb 2023 |
| RERA extensions | Applied for · Applied 12 May 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 12 Jul 2026 |
| Land conversion | Converted 10 Jan 2022 · Deputy commissioner Bangalore Urban District | |
|---|---|---|
| Survey numbers | 143 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 1.3 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 2.5 km, Telecom layout, Ashwathnagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 260 m to the west, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the south-west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 50% | |
| Electricity, built | 0% | |
| Swimming Pool, built | 45% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.30 (145 covered spaces for 63 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 76% · planned by 1 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 19 Apr 2026 | |
| Internal roads | Not verified yet | |
| Club house | 50% | |
| Completion | 66% | |
| Completion, accountant | 70.9% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 12 Jul 2026 | |
| RERA completion date | 12 Jul 2026 | Review |
| Work began, as filed | 2 Jan 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 10.3 m filed, 8 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 1 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 96 CON 2022 · EC identification no. EC22B038KA163483 · issued 29 Aug 2022 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹38.68 Cr 25.1%Development · ₹115.14 Cr 74.9%
| Estimated cost | ₹153.82 Cr | |
|---|---|---|
| Cost incurred | ₹109.07 Cr (70.9% of the estimate) | |
| Cost left | ₹44.75 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹34.11 Cr | |
| Land cost revision | Not verified yet | |
Sold (20) 31.7%Unsold (43) 68.3%
| Sold, Q3 2025-26 | 16 / 63 · 47 available | |
|---|---|---|
| Sold, Q4 2025-26 | 17 / 63 · 46 available | |
| Sold, Q1 2026-27 | 17 / 63 · 46 available | |
| Sold, Q2 2026-27 | 20 / 63 · 43 available | |
| Unsold, Q2 2026-27 | 43 | |
| Sold in Q4 2025-26 | 1 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 3 |
| Escrow bank | FEDERAL BANK OF INDIA · St Marks Road | |
|---|---|---|
| Designated account, collected | ₹8.17 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.04 Cr in Q2 2026-27 (74% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 26 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 10 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 2 Nov 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · St Marks Road | |

Map of storm drains, lakes and government-flagged flood locations within about 1.3 km of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 820 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 260 m to the west, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.5 km, Nagawara | |
| Kempegowda Airport | 21.0 | 22 | 15.2 |
| MG Road (CBD) | 14.5 | 18 | 12.2 |
| Manyata Tech Park | 6.3 | 9 | 4.4 |
| ITPL, Whitefield | 21.4 | 26 | 14.2 |
| Ecospace, Bellandur ORR | 27.2 | 36 | 17.2 |
| Electronic City Ph 1 | 34.7 | 43 | 26.6 |
| Landfill or waste transfer station | 2.8 km to the north | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.2 km to the east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the west |