Overview
Sobha Sentosa Phase 4 Wing 1 And 2
Part ofSobha Sentosa4 phases, 533 flats
Overview
Part ofSobha Sentosa4 phases, 533 flats
Overview
Part ofSobha Sentosa4 phases, 533 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| 38 & BanyanCompleted · OC 30-03-2022 | ASSETZ BUILDWELL LLP | Apartment | 1,833 sqft carpet (as filed) | Completed |
| Ambaram HomesCompleted (regulator flag) | ARR DEVELOPERS | Apartment | 879 sqft carpet (as filed) | Completed |
| Amber MeadowsCompleted · OC 31-05-2024 | Excel Stone Developers | Apartment | – | Completed |
| Anuraag AmoghLapsed · completion date passed | ANURAAG CONSTRUCTIONS | Apartment | 736–949 sqft carpet (as filed) | Dec 2024 |
| Ashish A N Reddy ApartmentLapsed · completion date passed | AASHISH DEVELOPER AND BUILDERS | Apartment | 817 sqft carpet (as filed) | Sep 2023 |
| Atz ArevaLapsed · completion date passed | ATZ PROPERTIES | Apartment | 804–1,042 sqft carpet (as filed) | Jun 2026 |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 370 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| AuraActive · 9% built | BLUE SKY PROPERTIES | Apartment | 1,089 sqft carpet (as filed) | Apr 2030 |
| Blue Meadows Phase 2Active · 75% built | Yuva Infinity Developers | Apartment | 757–956 sqft carpet (as filed) | Dec 2027 |
8 of 61 other projects in Balagere, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sobha Sentosa Phase 4 Wing 1 And 2 in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 4 Mar 2022 · No. BBMP/Addl.Dir/JDNORTH/0047/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/200/2021 · issued 18 Oct 2021 | Clear |
| Environmental clearance | SEIAA 59 CON 2021 · issued 30 Sep 2021 | Clear |
| Airport height NOC | permissible top elevation 958.39 m above mean sea level | |
| Pollution board (CFE) | consent order W-350034 · issued 6 Aug 2025 · valid until 30 Jun 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 7 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | 8 of 8 parcels converted | |
|---|---|---|
| Sy 49/4, 50/2, 50/4 | Converted 4 Feb 2009 · Special Deputy Commissioner, Bangalore District | |
| Sy 49/7, 50/3 | Converted 14 Oct 2008 · Special Deputy Commissioner, Bangalore District | |
| Sy 51/1 | Converted 10 Feb 2009 · Special Deputy Commissioner, Bangalore District | |
| Sy 51/2B1, 51/2B2 | Converted 3 Oct 2008 · Special Deputy Commissioner, Bangalore District | |
| Survey numbers | 49/4 · 49/7 · 50/2 · 50/3 · 50/4 · 51/1 · 51/2B1 · 51/2B2 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Balagere | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Indoor Sports facility · Gym | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 20% | |
| Swimming Pool, built | 40% | |
| Parks, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.49 (70 covered spaces for 142 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 25 Jun 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 21 Apr 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 2 Oct 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Jan 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 54.63 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/200/2021 · issued 18 Oct 2021 | |
| Environmental clearance | SEIAA 59 CON 2021 · issued 30 Sep 2021 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 4 Mar 2022 | |
| Engineer's certificate, registration | Dated 3 Mar 2022 | |
| Chartered accountant's certificate, registration | Dated 3 Mar 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹46.22 Cr 28.4%Development · ₹116.28 Cr 71.6%
| Estimated cost | ₹162.50 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹162.50 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹4.44 Cr | |
| Land cost revision | Not verified yet | |
Sold (142) 100%
| Sold, Q3 2025-26 | 142 / 142 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 142 / 142 · 0 available | |
| Sold, Q1 2026-27 | 141 / 142 · 1 available | |
| Sold, Q2 2026-27 | 142 / 142 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 1 booking cancelled or corrected (142 → 141 sold) | |
| Sold in Q2 2026-27 | 1 | |
| 3 BHK, sold | 142 / 142 |
| Escrow bank | RATNAKAR BANK | |
|---|---|---|
| Designated account, collected | ₹74.5 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹74.5 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Escrow account, Q4 2025-26 | ₹32.26 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 7 | |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Complaints filed against the promoter | 226 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 4 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | RATNAKAR BANK | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3 km, Kodibeesanahalli | |
| Kempegowda Airport | 29.5 |
| MG Road (CBD) | 14 |
| Manyata Tech Park | 16.5 |
| ITPL, Whitefield | 6 |
| Ecospace, Bellandur ORR | 5 |
| Electronic City Ph 1 | 12 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Sobha Dream Acres Substation on OpenStreetMap |