Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 5 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 66 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 3 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED | Apartment | 280–635 sqft carpet (as filed) | Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Tata Carnatica - Varnam in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 37/1, 37/2, 37/4, 37/7 and 1 more
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 1 (part), 2/2, 7 (part)
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 1 (part), 2/2, 7 (part)
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 1 (part), 2/2, 7 (part)
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 1 (part)
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 2/2, 7 (part), 37/1, 37/2 and 3 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 2/2, 7 (part), 37/1, 37/2 and 3 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 2/2, 7 (part), 37/1, 37/2 and 3 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/CC/331/2024-25/25-26/888
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Panchayath Raj · Survey 1 (part), 7 (part), 37/1, 37/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayath Raj · Survey 1 (part), 7 (part), 37/1, 37/2 and 2 more
K-RERA filing, land schedule
Covers 37/1, 37/2, 37/7, 37/10 only
Approval or registration
Khata issued
E Khatha · Panchayath Raj · Survey 1 (part), 7 (part), 37/1, 37/2 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayatha Raj · Survey 2/2, 37/4
K-RERA filing, land schedule
Covers 37/4 only
Approval or registration
Khata issued
E Khatha · Panchayatha Raj · Survey 2/2, 37/4
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/110825/007988
K-RERA registration
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 3 Jul 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Private lender (individual) · ₹110.00 Cr disbursed | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 1/P, 2/2, 7/P, 37/1, 37/2, 37/4 and 2 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 12,125 sq m | |
| Khata | E Khatha · Panchayath Raj · 1 Jul 2025; E Khatha · Panchayatha Raj · 1 Jul 2025 | |
| Sale deed | Dated 11 Nov 2005, 18 Nov 2005 | |
Valid as of this reportValidity ended
| Building plan (BIAPPA) | Sanctioned 25 Jun 2025 · No. BIAAPA/TP/CC/331/2024-25/25-26/888 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/238/2024 · issued 29 Aug 2024 | Clear |
| Environmental clearance | EC identification no. EC23B3812KA5965276N · issued 18 Jan 2024 | Clear |
| Airport height NOC (1 of 2) | issued 5 Jul 2021 · valid until 4 Jul 2029 | Clear |
| Airport height NOC (2 of 2) | issued 10 Nov 2021 · valid until 9 Nov 2029 | |
| Pollution board (CFE) | consent order CTE-346816 · issued 3 Jan 2025 · valid until 17 Jan 2034 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Aug 2030 |
| Land conversion | 8 of 8 parcels converted | |
|---|---|---|
| Sy 1/P, 2/2, 7/P | Converted 19 Jul 2004 · DC Office, Bangalore Rural | |
| Sy 37/1, 37/2, 37/4, 37/7, 37/10 | Converted 15 May 2004 · DC Office, Bangalore Rural | |
| Survey numbers | 1/P · 2/2 · 7/P · 37/1 · 37/2 · 37/4 · 37/7 · 37/10 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3b + 3t · avg 169 m² 50%4B + Study · avg 225 m² 50%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3b + 3t | 24 | 1,820 |
| 4B + Study | 24 | 2,416 |
| Sold, Q2 2026-27 | 48 / 48 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
| Birla Trimaya Phase-3 | about 0.5 km | Locked | |
|---|---|---|---|
| Varnam Phase 1c | about 0.5 km | Locked | |
| Ekta Elements | about 0.5 km | Locked | |
| Birla Trimaya Phase-2 | about 0.5 km | Locked | |
| Birla Trimaya | about 0.5 km | Locked |
| Tata Carnatica - Varnam This project | This project is the point the others are measured from | 31 Aug 2030 | 100% (48 of 48) | Not verified yet |
|---|---|---|---|---|
| Birla Trimaya Phase-3 | about 0.5 km | 31 Aug 2030 | 95% (439 of 463) | Locked |
| Varnam Phase 1c | about 0.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
| Ekta Elements |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 12 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2 km to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (48 covered spaces for 48 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Anneshwara Grama Panchayath) | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | Not started · planned by 2 Oct 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 5 May 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 13% | |
| Completion, accountant | 21.1% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 20 Jul 2030 | |
| RERA completion date | 31 Aug 2030 | |
| Work began, as filed | 15 Aug 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: RH 9.75 m, TH1 12.65 m, TH2 12.65 m, TH3 12.65 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 343.78 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/238/2024 · issued 29 Aug 2024 | |
| Environmental clearance | EC identification no. EC23B3812KA5965276N · issued 18 Jan 2024 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 25 Jul 2025 | |
| Engineer's certificate, registration | Dated 25 Jul 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹12.46 Cr 12.4%Development · ₹87.98 Cr 87.6%
| Estimated cost | ₹100.44 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹74.36 Cr | |
| Cost incurred | ₹21.21 Cr (21.1% of the estimate) | |
| Cost left | ₹79.23 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹132.40 Cr | |
| Land cost revision | Not verified yet | |
Sold (48) 100%
| Sold, Q3 2025-26 | 46 / 48 · 2 available | |
|---|---|---|
| Sold, Q4 2025-26 | 48 / 48 · 0 available | |
| Sold, Q1 2026-27 | 48 / 48 · 0 available | |
| Sold, Q2 2026-27 | 48 / 48 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| 4B + Study, sold | 24 / 24 | |
| 3B + 3T, sold | 24 / 24 |
| Escrow bank | ICICI Bank · Residency Road | |
|---|---|---|
| Designated account, collected | ₹15.08 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹75.43 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 2 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | Private lender (individual) · ₹110.00 Cr disbursed | |
|---|---|---|
| Records searched to | 3 Jul 2025 | |
| Building plan (BIAPPA) | Sanctioned 25 Jun 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Residency Road | |

| Barca II At Godrej Msr City | about 1 km | Locked |
|---|
| Godrej MSR City | about 1.5 km | Locked |
|---|
| Sattva Vasanta Cove | about 2 km | Locked |
|---|
| Sattva Vasanta Skye | about 2 km | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 2 km | Locked |
|---|
| Sattva City | about 2.5 km | Locked |
|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 4.5 km | Locked |
|---|
| about 0.5 km |
| 31 Dec 2027 |
| Not filed |
| Locked |
| Birla Trimaya Phase-2 | about 0.5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Birla Trimaya | about 0.5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Barca II At Godrej Msr City | about 1 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Projects within 4 km, counted | 26 (26 with an approximate location) | |
|---|---|---|
| Flats in them | 14,798 | |
| Booked | 9,362 of 14,798 (63%) | |
| Unsold | 5,436 | |
| Booked a month, pooled | 176 flats | |
| Months to sell, pooled | 31 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2 km to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2.5 km, Airport City | |
| Kempegowda Airport | 8 | 4.5 |
| MG Road (CBD) | 31 | 25 |
| Manyata Tech Park | 27 | 17 |
| ITPL, Whitefield | 37 | 24 |
| Ecospace, Bellandur ORR | 45 | 29.5 |
| Electronic City Ph 1 | 51 | 39.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 3 km to the north-west, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named BIAL Begur Substation on OpenStreetMap |