Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| 1 Lakh Multi Storied Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Jul 2023 |
| 7hills CourtyardApplied for completion 22/05/2024 | 7HILLS PROPERTIES | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| 96 Brick Wood AvenueActive · 9% built | Cinoti ventures LLP | Apartment | 851–1,084 sqft carpet (as filed) | May 2031 |
| Aratt-Escapes Phase 2Active · 67% built | ARATT CITY TOWERS LLP | Plot | ~1,670–2,120 sqft (estimate: filed carpet plus 25%) | Apr 2028 |
| Bellevue NestApplied for completion 03/03/2026 | AFFAIRAL GLOBAL FASHION PRIVATE LIMITED | Plot | – | Mar 2026 |
| Canterbury LakesideLapsed · completion date passed |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 25 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The outline is the whole property the filing names, not survey by survey.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Vyasti Project |
| Plot |
| – |
| Nov 2025 |
| Canterbury Meadows Phase 2Applied for completion 30/10/2024 | Arunapanchami Estates Private Limited | Plot | ~1,160–1,500 sqft (estimate: filed carpet plus 25%) | Nov 2023 |
| Canterbury Orchards IILapsed · completion date passed | SLNS AVYUKTHA HOMES | Plot | – | Mar 2023 |
8 of 42 other projects in North Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Windsor Hillside in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 7 Feb 2025 · No. STRRPA/TP/LAO/18/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 24 Jul 2024 · DC Office, Bangalore Rural | |
|---|---|---|
| Survey numbers | 31/2 · 34/2 · 34/3 · 34/7 · 34/8 · 34/9 · 43/1 (p) · 43/3 · 44/2 · 44/3 · 44/4 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 22.9 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 770 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the north-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Oct 2025 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Engineer's certificate, registration | Dated 17 Mar 2026 | |
Land · ₹16.88 Cr 74.7%Development · ₹5.70 Cr 25.3%
| Estimated cost | ₹22.58 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.76 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | SVC CO-OPERATIVE BANK LTD. · Yeshwanthpur | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 7 Feb 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | SVC CO-OPERATIVE BANK LTD. · Yeshwanthpur | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 31.2 m
Across Doddaballapura, the water table sat 20 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 31.2 m, and it recovered 4.7 m over the year.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 20 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Konaghatta Grama panchayath) | |
| Nearest city water main | 19.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 770 m to the east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 14.7 km, Doddajala | |
| Kempegowda Airport | 17.0 |
| MG Road (CBD) | 38.0 |
| Manyata Tech Park | 30.3 |
| ITPL, Whitefield | 39.4 |
| Ecospace, Bellandur ORR | 44.3 |
| Electronic City Ph 1 | 53.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.6 km to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |