Possession, agreement31 Dec 2024Agreement for sale, p. 62
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldCompleted
Sold in the latest quarterCompleted
Funding
Estimated cost
Loan & collateral
Can it be financed?
Review1 to review
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed96On K-RERA
Available7679% of filed
K-RERA only20
Approvals with a validity date1Valid today
Approvals & NOCs
What we read
Fire NOCKSFES/NOC/667/2018Filed as Fire NOC, p. 1
Airport height NOCNOC ID JAKK/SOUTH/B/011217/190903Filed as Airport Authority of India, p. 1
Environmental clearanceIssued 26 Apr 2017Filed as SEIAA, p. 1
Pollution board consentValid until 30 Jun 2030Issued 19 Sep 2025
5 pagesAvailable
52 pages1 factAvailable
K-RERA only
6 pagesAvailable
2 pages1 factAvailable
2 pagesAvailable
1 pageAvailable
8 pagesAvailable
9 pages2 factsAvailable
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
2 pagesAvailable
3 pagesAvailable
5 pages3 factsAvailable
2 pagesAvailable
3 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ajmera Florenza in the interactive atlas
Title report
Title opinion
Not verified yet
Records searched to
29 Jan 2020
Court-case search
Not verified yet
High Court order
Not verified yet
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
The matched land is part of a survey number. KGIS holds only the whole number, so its neighbours are not this land's.
Encumbrance certificate filed with K-RERA
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 4 pages, English.
No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map
Filed survey numbers matched to the KGIS map
2 of 2
Matched part of the survey number
21,169 sq m
The whole survey number on the KGIS map
53,408 sq m
Land area filed with K-RERA
12,773 sq m
Village, hobli and taluk on the KGIS map
Kempanahalli, Yalahanka-3 hobli, Yelahanka taluk
Sketch dimensions
Not verified yet
Sanctioned plan area
Not verified yet
Mutation entry
Not verified yet
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Drains, lakes and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
Water at a glance
Groundwater
Yelahanka taluk average, July 2023: 11.4 m below ground
What it means
Not verified yet
Water below ground
11.4 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Straight-line distance from the site
Nuisances
Distance from the filed pin
Completed
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 26 Sep 2025
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
31 Dec 2024
Schedule end
26 Jan 2023
RERA completion date
30 Sep 2025
Completion date, agreement
31 Dec 2024
Work began, as filed
1 Feb 2020
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot