| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 77 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Amrutha Lake Vista in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru · Survey 36/1, 36/2
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru · Survey 36/1, 36/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Amrutha Shelters Pvt Ltd Rep. By Burra Madhusudhan Rao · Survey 36/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Amrutha Shelters Pvt Ltd Rep. By. Burra Lakshmi Narayana · Survey 36/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bangalore · Survey 36/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/EM/EO-1/TA-4/East/68/2024-2025
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Deputy Commissioner, Bengaluru · Survey 36/2
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹3.16 Cr · Sy 36/1, Bidarahalli hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 8, 11 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/210625/007861
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 16 Apr 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 37, 38 (J.I.Bidare Agrahara) |
| East | EC schedule not read yet | Survey 3 (Doddabanahalli); Survey 35 (J.I.Bidare Agrahara) |
| South | EC schedule not read yet | Nothing mapped touching it |
| West | EC schedule not read yet | Survey 49 (J.I.Bidare Agrahara); stream, tank |
Page 1
Page 1 of 7 of the survey sketch. Filed with K-RERA: TCP SUrvey Sketch, 7 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 18,849 sq m | |
| Extent the filed land schedule names for these survey numbers | 19,020 sq m | |
| Plot area against the filed extent | 1.01 times | |
| Land area filed with K-RERA | 18,818 sq m | |
| Filed area as a share of the KGIS plots' area | 100% | |
| Village, hobli and taluk on the KGIS map | J.I.Bidare Agrahara, Bidarahalli-1 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 36/1, 36/2 | |
|---|---|---|
| Land extent, Sy 36/1 | 2 Acre 10 Guntas | |
| Land extent, Sy 36/2 | 2 Acre 18 Guntas | |
| Area on the KGIS map | 18,849 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 18,818 sq m | |
| Khata | A Khatha · Bangalore · 4 Mar 2025; E Khatha · Deputy Commissioner, Bengaluru · 22 Apr 2025 | |
| Sale deed | Dated 21 Nov 2014, 20 Jun 2015 | |
| Sale deed in favour of | Amrutha Shelters Pvt Ltd Rep. By. Burra Lakshmi Narayana, Amrutha Shelters Pvt Ltd Rep. By Burra Madhusudhan Rao |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 36/1 | 1 | 2 acres 10 guntas | 0 | |||
| Sy. No. 36/2 | 1 | 2 acres 18 guntas | 0 |
| Building plan (BDA) | Sanctioned 25 Mar 2025 · No. BDA/EM/EO-1/TA-4/East/68/2024-2025 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/257/2024 · issued 15 Jul 2024 | Clear |
| Environmental clearance | SEIAA 203 CON 2024 · EC identification no. EC24C3801KA5550855N · issued 3 Feb 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Apr 2031 |
| Land conversion | Converted 1 Aug 2013 · Deputy Commissioner, Bengaluru | |
|---|---|---|
| Survey numbers | 36/1 · 36/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK 100%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 524 | 65,12,919 |
| Sold, Q2 2026-27 | 49 / 523 | |
|---|---|---|
| Unsold, Q2 2026-27 | 474 | |
| Months to sell, derived from filed bookings | 87 months |
| Assetz Bloom & Dell - Phase 2 | 770 m | Locked | |
|---|---|---|---|
| Godrej Woodscapes | about 2 km | Locked | |
| Sattva Songbird | 2.0 km | Locked | |
| Godrej Splendour Phase II | about 2 km | Locked |
| Amrutha Lake Vista This project | This project is the point the others are measured from | 30 Apr 2031 | 9% (49 of 523) | Not verified yet |
|---|---|---|---|---|
| Assetz Bloom & Dell - Phase 2 | 770 m | 31 Oct 2027 | 100% (238 of 238) | Locked |
| Godrej Woodscapes | about 2 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business), at the filed pin | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 3.2 km, TRIVENI NAGAR NEAR KR PURAM | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.7 km to the south, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 40 m to the west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (523 covered spaces for 523 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 15% · planned by 30 Oct 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jan 2031 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 25% | |
| Completion, accountant | Not verified yet | |
Builder's schedule runs about 52 months past the promised possession date.
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | 30 Apr 2031 | |
| RERA completion date | 30 Apr 2031 | |
| Work began, as filed | 1 May 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 76.7 m filed, 5 towers | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 50 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/257/2024 · issued 15 Jul 2024 | |
| Environmental clearance | SEIAA 203 CON 2024 · EC identification no. EC24C3801KA5550855N · issued 3 Feb 2025 | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 10 Apr 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹26.91 Cr 4.3%Development · ₹592.47 Cr 95.7%
| Estimated cost | ₹619.38 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹435.27 Cr | |
| Estimated cost, engineer's certificate | ₹622.38 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (49) 9.4%Unsold (474) 90.6%
| Sold, Q3 2025-26 | 0 / 523 · 523 available | |
|---|---|---|
| Sold, Q4 2025-26 | 7 / 523 · 516 available | |
| Sold, Q1 2026-27 | 27 / 523 · 496 available | |
| Sold, Q2 2026-27 | 49 / 523 · 474 available | |
| Unsold, Q2 2026-27 | 474 | |
| Sold in Q4 2025-26 | 7 | |
| Sold in Q1 2026-27 | 20 | |
| Sold in Q2 2026-27 | 22 | |
| Flats booked, Form 4 Q1 2026-27 | 27 |
| Escrow bank | HDFC · WHITEFIELD BENGALURU | |
|---|---|---|
| Designated account, collected | ₹16.03 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹16.03 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 16 Apr 2025 | |
| Building plan (BDA) | Sanctioned 25 Mar 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · WHITEFIELD BENGALURU | |

Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Bloom & Dell - Phase 2, price locked; Sattva Songbird, price locked; Godrej Splendour, price locked.
| Godrej Splendour | 2.6 km | Locked |
|---|
| Nirmaanika Aria | about 3 km | Locked |
|---|
| Sowparnika Euphoria in the East | 4.1 km | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 4 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 4 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 4 km | Locked |
|---|
| Chaithanya Sankhya | about 4.5 km | Locked |
|---|
| Garuda Grand | 4.4 km | Locked |
|---|
| Sattva Songbird |
|---|
| 2.0 km |
| 6 May 2029 |
| 51% (704 of 1,379) |
| Locked |
| Godrej Splendour Phase II | about 2 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
|---|
| Godrej Splendour | 2.6 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
|---|
| Nirmaanika Aria | about 3 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹50,000 /mo · 24 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹34,988 /mo · 37 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 10 listings | |
| Rent per sq ft, 3 km | ₹30.0 /mo, as listed · 51 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 58 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 22,626 | |
| Booked | 14,768 of 22,626 (65%) | |
| Unsold | 7,858 | |
| Booked a month, pooled | 189 flats | |
| Months to sell, pooled | 42 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 2.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.7 km to the south, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 4.2 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 19.2 |
| MG Road (CBD) | 17.1 |
| Manyata Tech Park | 14.0 |
| ITPL, Whitefield | 5.2 |
| Ecospace, Bellandur ORR | 13.9 |
| Electronic City Ph 1 | 22.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 890 m to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the north-east, named Kondaspura on OpenStreetMap |