Overview
Assetz Sora & Saki Phase 2
Part ofAssetz Sora & Saki2 phases, 1,626 flats
Overview
Part ofAssetz Sora & Saki2 phases, 1,626 flats
Overview
Part ofAssetz Sora & Saki2 phases, 1,626 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
Part of the full report. Unlock all 3 sections
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 68 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| – |
| Locked |
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Sora & Saki Phase 2 in the interactive atlas
Approval or registration
Land use converted
KIADB · Survey 176, 177, 470, 471 and 1 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Netra Software Technologies (P) Ltd · Survey 176, 177, 470, 471 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Gram Panchayath Bagalur · Survey 176, 177, 470, 471 and 1 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan DO3-KIADB-00018/23-24/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/210524/006929
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 19 Mar 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 176, 177, 470, 471, 82 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,917 sq m | |
| Khata | A Khatha · Gram Panchayath Bagalur · 16 Oct 2023 | |
| Sale deed | Dated 8 Jun 2022 | |
| Sale deed in favour of | Netra Software Technologies (P) Ltd | |
| Building plan (KIADB) | Sanctioned 15 Feb 2024 · No. DO3-KIADB-00018/23-24/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/199/2023 · issued 11 Sep 2023 · building height 57.84 m | Clear |
| Environmental clearance | SEIAA 121 CON 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Jul 2029 |
| Land conversion | Converted 9 Apr 2008 · KIADB | |
|---|---|---|
| Survey numbers | 176 · 177 · 470 · 471 · 82 |
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 170 m from the filed location | Clear |
| Nearest government-flagged flood location | 8.7 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 590 m to the south, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the south-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.68 (433 covered spaces for 634 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 20% · planned by 30 Sep 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 May 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 29% | |
| Completion, accountant | 24.4% of the estimated cost spent | |
| Possession, agreement | 31 Jul 2029 | |
|---|---|---|
| Schedule end | 31 Jul 2029 | |
| RERA completion date | 31 Jul 2029 | |
| Completion date, agreement | 31 Jul 2029 | |
| Work began, as filed | 1 May 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 57.84 m on the fire NOC · 57.84 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Wooden flooring | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | 100% power backup for lifts, common area lighting | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/199/2023 · issued 11 Sep 2023 · building height 57.84 m | |
| Environmental clearance | SEIAA 121 CON 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 30 Apr 2024 · site inspected 1 Feb 2024 | |
| Engineer's certificate, registration | Dated 2 May 2024 | |
| Chartered accountant's certificate, registration | Dated 2 May 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹15.87 Cr 5.2%Development · ₹292.09 Cr 94.8%
| Estimated cost | ₹307.95 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹307.95 Cr, same as the filing | |
| Cost incurred | ₹75.01 Cr (24.4% of the estimate) | |
| Cost left | ₹232.94 Cr | |
| Collected from buyers | ₹133.19 Cr | |
| Receivable, sold flats | ₹150.18 Cr | |
| Land cost revision | Not verified yet | |
Sold (242) 38.2%Unsold (392) 61.8%
| Sold, Q3 2025-26 | 184 / 634 · 450 available | |
|---|---|---|
| Sold, Q4 2025-26 | 208 / 634 · 426 available | |
| Sold, Q1 2026-27 | 224 / 634 · 410 available | |
| Sold, Q2 2026-27 | 242 / 634 · 392 available | |
| Unsold, Q2 2026-27 | 392 | |
| Sold in Q4 2025-26 | 24 | |
| Sold in Q1 2026-27 | 16 | |
| Sold in Q2 2026-27 | 18 |
| Escrow bank | FEDERAL BANK OF INDIA · Koramangala | |
|---|---|---|
| Designated account, collected | ₹18.45 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹12.91 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 19 Mar 2024 | Review |
| Building plan (KIADB) | Sanctioned 15 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · Koramangala | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Gram Panchayat) | |
| Nearest city water main | 5.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 590 m to the south, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 6.0 km, Bettahalasuru | |
| Kempegowda Airport | 7.2 |
| MG Road (CBD) | 20.1 |
| Manyata Tech Park | 12.3 |
| ITPL, Whitefield | 18.6 |
| Ecospace, Bellandur ORR | 24.0 |
| Electronic City Ph 1 | 33.6 |
| Landfill or waste transfer station | 1.4 km to the north-west, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.3 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 230 m to the north, named Bagalur Substation on OpenStreetMap |