Sold133 / 163At the completion filing, 10 Jan 2025
Sold in the latest quarterCompleted
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed118On K-RERA
Available11497% of filed
K-RERA only4
Approvals with a validity dateNone read
Approvals & NOCs
What we read
Environmental clearanceIssued 4 May 2015Filed as Final Moef 24062015, p. 3
5 pagesAvailable
5 pagesAvailable
2 pagesAvailable
10 pages2 factsAvailable
4 pagesAvailable
1 pageAvailable
1 pageAvailable
Available
4 pagesAvailable
10 pagesAvailable
2 pagesAvailable
10 pagesAvailable
4 pagesAvailable
5 pagesAvailable
9 pagesAvailable
9 pagesAvailable
9 pagesAvailable
9 pagesAvailable
9 pagesAvailable
2 pagesAvailable
4 pagesAvailable
2 pagesAvailable
1 pageAvailable
2 pagesAvailable
58 pagesAvailable
58 pagesAvailable
48 pagesAvailable
40 pagesAvailable
30 pagesAvailable
34 pagesAvailable
47 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 12 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Chaithanya Samarth is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
Not verified yet
Environmental clearance (1 of 2)
SEIAA 226 CON 2014 · issued 4 May 2015
✓Clear
Environmental clearance (2 of 2)
SEIAA 226 CON 2014 · issued 21 Apr 2017
✓Clear
Airport height NOC
Not verified yet
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
Granted · Approved 19 Apr 2023
RERA complaints
1
RERA completion date
21 Mar 2024
Registration certificates
PRM/KA/RERA/1251/446/PR/180119/000936
EX/PRM/KA/RERA/1251/446/PR/230419/000936
Land use
Conversion order
Not verified yet
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Agreement for sale
Due on signing
Not verified yet
Due within 15 days
Not verified yet
Each construction stage
Not verified yet
Floors in payment plan
Not verified yet
Late-payment interest
SBI MCLR + 2%
Interest the builder pays on late possession
SBI MCLR + 2%
Fees
Agreement for sale
Not verified yet
Not verified yet
Unit sizes
3BHK A: carpet vs rest
Not verified yet
Unit mix filed
Not verified yet
Unit types
Not verified yet
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Completed
Registered deeds
Transactions in this project
Not verified yet
The area
Price trend
North Bengaluru, past yearNot verified yet
Bengaluru, past yearNot verified yet
North since 2022Not verified yet
This project vs North BengaluruNot verified yet
Price per sq ft, super built-up
Not verified yet
By quarter
Not verified yet
Registered sales around
Registered sale price per sq ft, by year
Not verified yet
Transactions around this project
Not verified yet
Comparable projects
Carpet price, projects within 4 km
Not verified yet
Nearest 12 with filed prices
Not verified yet
Flooding
Site vs nearest drain
Nearest storm drain
about 1 km from the locality centre, tertiary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, an unnamed pond
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Bengaluru East taluk average
Completed
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 15 Sep 2023
Completion, accountant
Not verified yet
Dates
Dates
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
about 1 km from the locality centre, tertiary drain
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
about 0.5 km from the locality centre, named Mandur Landfill on OpenStreetMap
Sewage treatment plant
None within 3 km of the locality centre
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 0.5 km from the locality centre, named Manduru on OpenStreetMap