Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| – |
| Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| Artemis Address Phase 2Active · 95% built | Address Maker | Plot | 1,200–1,500 sqft | Dec 2027 |
8 of 72 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Construction Of Villa And 1bhk Bda Hunnigere in the interactive atlas
Transfer of the land
Sale deed
Survey 35
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Thasildar · Survey 35
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan NPA:LAO34:218-19
K-RERA filing, approvals
Approval or registration
Land use converted
Thasildar · Survey 35
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/307/PR/311222/005589
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 35 | |
|---|---|---|
| Land extent, Sy 35 | 1,01,845 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,01,845 sq m | |
| Khata | A Khatha · Thasildar · 30 Apr 2019 | |
| Sale deed | Dated 21 Jun 2007 | |
| Building plan (Local Planning Authority) | Sanctioned 17 Oct 2019 · No. NPA:LAO34:218-19 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | SEIAA 46 CON 2019 | Clear |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2025 |
| Land conversion | Converted 30 Apr 2020 · Thasildar | |
|---|---|---|
| Survey numbers | 35 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
1 BHK,3BHK Villa ,4BHK Villa Housing · avg… 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1 BHK,3BHK Villa ,4BHK Villa Housing | 642 | 676 |
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 110 | |
| Booked | 66 of 110 (60%) | |
| Unsold | 44 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 8 km, Shambhavinagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2.5 km to the east, Arkavati, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.86 (278 covered spaces for 322 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 24 Mar 2025 | |
| RERA completion date | 31 Mar 2025 | Red flag |
| Work began, as filed | 4 Nov 2019 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: EWS-1 12 m, EWS-2 12 m, EWS-3 12 m, EWS-4 12 m, EWS-5 12 m, EWS-6 12 m, EWS-7 12 m, EWS-8 12 m, EWS-9 12 m, EWS-10 12 m, EWS-11 12 m, EWS-12 12 m, EWS-13 12 m, EWS-14 12 m, EWS-15 12 m, EWS-16 12 m, EWS-17 12 m, EWS-18 12 m, EWS-19 12 m, EWS-20 12 m, 4 BHK 001 6 m, 4 BHK 002 6 m, 4 BHK 003 6 m, 4 BHK 004 6 m, 4 BHK 005 6 m, 4 BHK 006 6 m, 4 BHK 007 6 m, 4 BHK 008 6 m, 4 BHK 009 6 m, 4 BHK 010 6 m, 4 BHK 011 6 m, 4 BHK 012 6 m, 4 BHK 013 6 m, 4 BHK 014 6 m, 4 BHK 015 6 m, 4 BHK 016 6 m, 4 BHK 017 6 m, 4 BHK 018 6 m, 4 BHK 019 6 m, 4 BHK 020 6 m, 4 BHK 021 6 m, 4 BHK 022 6 m, 4 BHK 023 6 m, 4 BHK 024 6 m, 4 BHK 025 6 m, 4 BHK 026 6 m, 4 BHK 027 6 m, 4 BHK 028 6 m, 4 BHK 029 6 m, 4 BHK 030 6 m, 4 BHK 031 6 m, 4 BHK 032 6 m, 4 BHK 033 6 m, 4 BHK 034 6 m, 4 BHK 035 6 m, 4 BHK 036 6 m, 4 BHK 037 6 m, 4 BHK 038 6 m, 4 BHK 039 6 m, 4 BHK 040 6 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 46 CON 2019 | |
Land · ₹114.39 Cr 29.7%Development · ₹271.00 Cr 70.3%
| Estimated cost | ₹385.39 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Union Bank of India · KUMARAPARK WEST | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 15 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 9 | Review |
| Revoked or withdrawn | 2 | |
| Complaints filed against the promoter | 45 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 17 Oct 2019 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · KUMARAPARK WEST | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2.5 km to the east, Arkavati, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 8 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 38 |
| MG Road (CBD) | 21.5 |
| Manyata Tech Park | 23 |
| ITPL, Whitefield | 36 |
| Ecospace, Bellandur ORR | 31.5 |
| Electronic City Ph 1 | 35.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2 km to the south | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-west |