Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 11 Campbell KrishviRegistered · no quarterly update yet | KRISHVI PROJECTS PRIVATE LIMITED | Apartment | 1,888 sqft carpet (as filed) | Dec 2026 |
| Aashrithaa Divine Phase - 2Completed (regulator flag) | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | – | Completed |
| CelestiaLapsed · completion date passed | PYRAMID PROPERTIES | Apartment | – | May 2022 |
| Chartered 1956Active · 95% built | CHARTERED HOUSING PRIVATE LIMITED | Apartment | 2,988 sqft carpet (as filed) | Jun 2028 |
| Comfort VimalaprabhaLapsed · completion date passed | COMFORT BUILDERS & DEVELOPERS | Apartment | – | Sep 2024 |
| Df Silverline Queens TerracesCompleted · OC 18-07-2018 | DF SILVERLINE CONSTRUCTIONS | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 10 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 1,380 sqft carpet (as filed) |
| Completed |
| Embassy Habitat | Embassy Group | Apartment | 1,100–3,427 sqft | – |
| Emmanuel Ashley ParkLapsed · completion date passed | EMMANUEL ESTATES | Apartment | 831 sqft carpet (as filed) | Dec 2024 |
8 of 32 other projects in Vasanth Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Eternity Bs49 in the interactive atlas
Approval or registration
Land use converted
ALN(NY)SR129/13-14 · Survey 356/49/1/49/8
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 356/49/1/49/8
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 356/49/1/49/8
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/JDNORTH/0096/21/22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/250825/008026
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 356/49/1/49/8 | |
|---|---|---|
| Land extent, Sy 356/49/1/49/8 | 4,248 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,248 sq m | |
| Khata | A Khatha · BBMP · 7 Sep 2020 | |
| Sale deed | Dated 12 Mar 2014 | |
| Building plan (BBMP) | Sanctioned 22 Aug 2023 · No. BBMP/JDNORTH/0096/21/22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 11 Apr 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Apr 2028 |
| Land conversion | Converted 5 Feb 2014 · ALN(NY)SR129/13-14 | |
|---|---|---|
| Survey numbers | 356/49/1/49/8 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · 88 m² 66.7%3BHK · 90 m² 33.3%
| Type | Flats | Carpet per flat (sq ft) |
|---|---|---|
| 2BHK | 76 | 947 |
| 3BHK | 38 | 969 |
| Vista Svara | about 2 km | Locked | |
|---|---|---|---|
| Vista Padmalaya | about 3 km | Locked | |
| Renaissance Srichakra | about 4 km | Locked | |
| Birla Tisya | about 4.5 km | Locked | |
| Magnolia Delight | about 6 km | Locked |
| Eternity Bs49 This project | This project is the point the others are measured from | 30 Apr 2028 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vista Svara | about 2 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Vista Padmalaya | about 3 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Renaissance Srichakra |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Binny Mill Tank Area | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1.5 km, K100 | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (126 covered spaces for 114 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Apr 2028 | |
| RERA completion date | 30 Apr 2028 | |
| Work began, as filed | 30 Apr 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.99 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Site inspected 6 Mar 2025 | |
| Engineer's certificate, registration | Dated 31 Mar 2025 | |
| Chartered accountant's certificate, registration | Dated 18 Apr 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹14.02 Cr 28%Development · ₹36.00 Cr 72%
| Estimated cost | ₹50.02 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹36.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Bank of Baroda · Gandhi Bazar | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 22 Aug 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Bank of Baroda · Gandhi Bazar | |
| Ranka Iris | about 6 km | Locked |
|---|
| Adarsh Premia | about 6.5 km | Locked |
|---|
| Century Regalia (Project 2) | about 7.5 km | Locked |
|---|
| Sobha Royal Crest | about 7.5 km | Locked |
|---|
| Song Of Wind | about 8 km | Locked |
|---|
| Aydin Infra Signature 3 | about 8.5 km | Locked |
|---|
| Royal Enclave | about 8.5 km | Locked |
|---|
| about 4 km |
| 11 Aug 2027 |
| 63% (5 of 8) |
| Locked |
| Birla Tisya | about 4.5 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Magnolia Delight | about 6 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
|---|
| Ranka Iris | about 6 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
|---|
| Projects within 4 km, counted | 21 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 1,274 | |
| Booked | 1,007 of 1,274 (79%) | |
| Unsold | 267 | |
| Booked a month, pooled | 10 flats | |
| Months to sell, pooled | 25 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Sir M. Visvesvaraya Stn., Central College | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35.5 | 28.5 |
| MG Road (CBD) | 4.5 | 2.5 |
| Manyata Tech Park | 12 | 9 |
| ITPL, Whitefield | 22 | 17 |
| Ecospace, Bellandur ORR | 17 | 12 |
| Electronic City Ph 1 | 21 | 18.5 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Cubbon Park 4MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |