In That Quiet Earth full report, Hennur Road | DOSL
49 50 64 86 6 5 32 33 31 44 56 88 53 59 61 25 76 31 45 46 38 69 85 9 52 8 43 87 39 48 65 54 37 30 41 29 63 30 40 27 60 47 70 51 68 100 m Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Survey plots, KGIS cadastral Road, stream, tank or settlement (not a plot) Filed site pinAdarsh Pinecourt Lapsed · completion date passed Varin Infra Projects Private Limited Apartment 382–1,141 sqft carpet (as filed) Mar 2026
Adarsh Tranqville Lapsed · completion date passed Varin Infra Projects Private Limited Apartment – Mar 2026
Alanoville Completed (regulator flag) Goyal Hariyana Realty Apartment 2,251 sqft carpet (as filed) Completed
Amigo Palacio Active · 40% built AMIGO SHELTERS PVT LTD Apartment 1,044–1,480 sqft carpet (as filed) Mar 2028
Amigo Regency Completed · OC 24-08-2021 AMIGO SHELTERS PVT LTD Apartment – Completed
Other projects in Hennur Road, A to Z
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Boundaries Schedule in the EC vs KGIS neighbours Survey sketch Survey sketch filed with K-RERA No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map Land record The RTC of each filed survey Ownership Joint development agreement 2016 2019 2022 2025 Airport height (1 of 3) valid until 27 May 2027 Airport height (1 of 3): valid until 27 May 2027 Airport height (2 of 3) valid until 3 Jun 2027 Airport height (2 of 3): valid until 3 Jun 2027 Airport height (3 of 3) validity ended 3 Jul 2021 Airport height (3 of 3): validity ended 3 Jul 2021 As of 28 Oct 2026
2016 2018 2020 2022 2024 2026 Airport height (1 of 3) valid until 27 May 2027 Airport height (1 of 3): valid until 27 May 2027 Airport height (2 of 3) valid until 3 Jun 2027 Airport height (2 of 3): valid until 3 Jun 2027 Airport height (3 of 3) validity ended 3 Jul 2021 Airport height (3 of 3): validity ended 3 Jul 2021 As of 28 Oct 2026
2016 2018 2020 2022 2024 2026 Airport height (1 of 3) valid until 27 May 2027 Airport height (1 of 3): valid until 27 May 2027 Airport height (2 of 3) valid until 3 Jun 2027 Airport height (2 of 3): valid until 3 Jun 2027 Airport height (3 of 3) validity ended 3 Jul 2021 Airport height (3 of 3): validity ended 3 Jul 2021 As of 28 Oct 2026
2016 2018 2020 2022 2024 2026 Airport height (1 of 3) valid until 27 May 2027 Airport height (1 of 3): valid until 27 May 2027 Airport height (2 of 3) valid until 3 Jun 2027 Airport height (2 of 3): valid until 3 Jun 2027 Airport height (3 of 3) validity ended 3 Jul 2021 Airport height (3 of 3): validity ended 3 Jul 2021 As of 28 Oct 2026
Valid as of this report Validity ended
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/180519/001745 ₹99 for this report opens Disputes & cases for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what In That Quiet Earth's developer filed before you say yes.
× In That Quiet Earth
Total Environment · Hennur Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Agreement for sale
Price per sq ft, super built-up Registered deeds Transactions in this project The area Price trend North Bengaluru, past year Not verified yet
Bengaluru, past year Not verified yet
North since 2022 Not verified yet
This project vs North Bengaluru Not verified yet
Price per sq ft, super built-up Registered sales around Registered sale price per sq ft, by year Transactions around this project Comparable projects Carpet price, projects within 4 km Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 6 listings 1BHK: median ₹11,275 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹11,275 /mo 2BHK · 32 listings 2BHK: median ₹25,000 /mo over 32 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹25,000 /mo 3BHK · 9 listings 3BHK: median ₹35,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹35,000 /mo
1BHK · 6 listings 1BHK: median ₹11,275 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹11,275 /mo 2BHK · 32 listings 2BHK: median ₹25,000 /mo over 32 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹25,000 /mo 3BHK · 9 listings 3BHK: median ₹35,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 3,876 unsold flats ÷ 93 booked a month across 40 projects 42 months In That Quiet Earth Phase 2c In That Quiet Earth Phase 2c, about 0.5 km: 49 unsold ÷ 24 booked in 9 months 18 months Solcrest Solcrest, about 0.5 km: 456 unsold ÷ 196 booked in 9 months 21 months Nagama Serenity Nagama Serenity, about 1 km: 57 unsold ÷ 6 booked in 9 months 86 months Nava Vruksha Nava Vruksha, 1.5 km: 488 unsold ÷ 28 booked in 3 months 52 months Disha Harmony Gardens Disha Harmony Gardens, 2.0 km: 68 unsold ÷ 82 booked in 9 months 8 months Disha Symphony Heights
Around it Water Groundwater, Bengaluru East taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
0% 50% 100% Q3 2025-26: 96% 96% Q3 2025-26 Q4 2025-26: 59% 59% Q4 2025-26 Q1 2026-27: 60% 60% Q1 2026-27 Q2 2026-27: 61% 61% Q2 2026-27 0% 50% 100% Q3 2025-26: 96% 96% Q3 2025-26 Q4 2025-26: 59% 59% Q4 2025-26 Q1 2026-27: 60% 60% Q1 2026-27 Q2 2026-27: 61% 61% Q2 2026-27 0% 50% 100% Q3 2025-26: 96% 96% Q3 2025-26 Q4 2025-26: 59% 59% Q4 2025-26 Q1 2026-27: 60% 60% Q1 2026-27 Q2 2026-27: 61% 61% Q2 2026-27 0% 50% 100% Q3 2025-26: 96% 96% Q3 2025-26 Q4 2025-26: 59% 59% Q4 2025-26 Q1 2026-27: 60% 60% Q1 2026-27 Q2 2026-27: 61% 61% Q2 2026-27 As the promoter reported it
Work left By component, Q2 2026-27 Tower-1 (wing-1) Tower-1 (wing-1): 83% 83% Tower-2 (wing-2) Tower-2 (wing-2): 78% 78% Tower-3 (wing-3) Tower-3 (wing-3): 70% 70% Tower-4 (wing-4) Tower-4 (wing-4): 70% 70% Earth work and other leveling pr… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 99% 99% Basic work of Water supply, San… Basic work of Water supply, Sanitary and Electrification: 74% 74% Railing and Grill fixing Railing and Grill fixing: 46% 46% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 12% 12% Painting Painting: 12% 12% Club House Not started Electricity Not started Gas Not started Outdoor Sports facility Not started
Tower-1 (wing-1) Tower-1 (wing-1): 83% 83% Tower-2 (wing-2) Tower-2 (wing-2): 78% 78% Tower-3 (wing-3) Tower-3 (wing-3): 70% 70% Tower-4 (wing-4) Tower-4 (wing-4): 70% 70% Earth work and other leveling pre… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 99% 99% Basic work of Water supply, Sanit… Basic work of Water supply, Sanitary and Electrification: 74% 74% Railing and Grill fixing Railing and Grill fixing: 46% 46% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 12%
Tower-1 (wing-1) Tower-1 (wing-1): 83% 83% Tower-2 (wing-2) Tower-2 (wing-2): 78% 78% Tower-3 (wing-3) Tower-3 (wing-3): 70% 70% Tower-4 (wing-4) Tower-4 (wing-4): 70% 70% Earth work and other leveling pre… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 99% 99% Basic work of Water supply, Sanit… Basic work of Water supply, Sanitary and Electrification: 74% 74% Railing and Grill fixing Railing and Grill fixing: 46% 46% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 12%
Tower-1 (wing-1) Tower-1 (wing-1): 83% 83% Tower-2 (wing-2) Tower-2 (wing-2): 78% 78% Tower-3 (wing-3) Tower-3 (wing-3): 70% 70% Tower-4 (wing-4) Tower-4 (wing-4): 70% 70% Earth work and other leveling pre… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 99% 99% Basic work of Water supply, Sanit… Basic work of Water supply, Sanitary and Electrification: 74% 74% Railing and Grill fixing Railing and Grill fixing: 46% 46% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 12%
Quarterly return, Q2 2026-27 Dates Dates 2018 2021 2024 2027 Work began 15 Nov 2017 RERA deadline 30 Sep 2026 Builder's schedule ends 30 Sep 2026 As of 28 Oct 2026 Work began: 15 Nov 2017 RERA deadline: 30 Sep 2026 Builder's schedule ends: 30 Sep 2026 As of 28 Oct 2026
2018 2020 2022 2024 2026 Work began 15 Nov 2017 RERA deadline 30 Sep 2026 Builder's schedule ends 30 Sep 2026 As of 28 Oct 2026 Work began: 15 Nov 2017 RERA deadline: 30 Sep 2026 Builder's schedule ends: 30 Sep 2026 As of 28 Oct 2026
2018 2020 2022 2024 2026 Work began 15 Nov 2017 RERA deadline 30 Sep 2026 Builder's schedule ends 30 Sep 2026 As of 28 Oct 2026 Work began: 15 Nov 2017 RERA deadline: 30 Sep 2026 Builder's schedule ends: 30 Sep 2026 As of 28 Oct 2026
2018 2020 2022 2024 2026 Work began 15 Nov 2017 RERA deadline 30 Sep 2026 Builder's schedule ends 30 Sep 2026 As of 28 Oct 2026 Work began: 15 Nov 2017 RERA deadline: 30 Sep 2026 Builder's schedule ends: 30 Sep 2026 As of 28 Oct 2026
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Structural safety certificate Land · ₹59.93 Cr: 7% Development · ₹792.47 Cr: 93% ₹852 Cr estimated cost Land · ₹59.93 Cr 7% Development · ₹792.47 Cr 93%
Sales Sold vs unsold, Q2 2026-27 Sold (736): 100% 100% 736 flats Sold (736) 100%
Flats sold per quarter Q4 2025-26 0 flats Q1 2026-27 Q1 2026-27: booked flats went from 433 to 736 303 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 Q1 2026-27: booked flats went from 433 to 736 303 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 Q1 2026-27: booked flats went from 433 to 736 303 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 Q1 2026-27: booked flats went from 433 to 736 303 flats Q2 2026-27 0 flats
Compliance Escrow, Q2 2026-27 Paid in Paid into the designated account in Q2 2026-27 ₹2.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹2.71 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹2.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹2.71 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹2.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹2.71 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹2.71 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹2.71 Cr
Records searched to Not verified yet
Building plan Not verified yet
Unregistered agreements, over 10% paid Not verified yet
Sale deed in favour of Not verified yet
Escrow bank Standard Chartered Bank · CUNNINGHAM ROAD
Stage Progress as reported, by quarter Q3 2025-26 Q3 2025-26: 96% built, as the promoter reported it 96% Q4 2025-26 Q4 2025-26: 59% built, as the promoter reported it 59% Q1 2026-27 Q1 2026-27: 60% built, as the promoter reported it 60% Q2 2026-27 Q2 2026-27: 61% built, as the promoter reported it 61%
Q3 2025-26 Q3 2025-26: 96% built, as the promoter reported it 96% Q4 2025-26 Q4 2025-26: 59% built, as the promoter reported it 59% Q1 2026-27 Q1 2026-27: 60% built, as the promoter reported it 60% Q2 2026-27 Q2 2026-27: 61% built, as the promoter reported it 61%
Q3 2025-26 Q3 2025-26: 96% built, as the promoter reported it 96% Q4 2025-26 Q4 2025-26: 59% built, as the promoter reported it 59% Q1 2026-27 Q1 2026-27: 60% built, as the promoter reported it 60% Q2 2026-27 Q2 2026-27: 61% built, as the promoter reported it 61%
Q3 2025-26 Q3 2025-26: 96% built, as the promoter reported it 96% Q4 2025-26 Q4 2025-26: 59% built, as the promoter reported it 59% Q1 2026-27 Q1 2026-27: 60% built, as the promoter reported it 60% Q2 2026-27 Q2 2026-27: 61% built, as the promoter reported it 61%
Richi's Garden HBR Layout Vaddera Palya (Railway track) Nanda gokula Manyata tech park, MS Ramaiah north city To element mall Telecom layout, Ashwathnagar Vaddara palya, Near Hennur Bande 1 km 3 km 2 km 49 50 64 86 6 5 32 33 31 44 56 88 53 59 61 25 76 31 45 46 38 69 85 9 52 8 43 87 39 48 65 54 37 30 41 29 63 30 40 27 60 47 70 51 68 100 m 1 km 3 km 2 km The Pearl Paradise: the price is part of that project's own report Vkk Grand: the price is part of that project's own report Adarsh Pinecourt: the price is part of that project's own report Basemap: Esri, OpenStreetMap contributors
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: The Pearl Paradise, price locked; Vkk Grand, price locked; Adarsh Pinecourt, price locked.
This project Padlock: that project's price is part of its own report₹35,000 /mo 1BHK · 6 listings 1BHK: median ₹11,275 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹11,275 /mo 2BHK · 32 listings 2BHK: median ₹25,000 /mo over 32 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹25,000 /mo 3BHK · 9 listings 3BHK: median ₹35,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹35,000 /mo
1BHK · 6 listings 1BHK: median ₹11,275 /mo over 6 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹11,275 /mo 2BHK · 32 listings 2BHK: median ₹25,000 /mo over 32 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹25,000 /mo 3BHK · 9 listings 3BHK: median ₹35,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹35,000 /mo
Disha Symphony Heights, 2.0 km: 101 unsold ÷ 23 booked in 9 months 40 months Within 4 km, pooled 3,876 unsold flats ÷ 93 booked a month across 40 projects 42 months In That Quiet Earth Phase 2c In That Quiet Earth Phase 2c, about 0.5 km: 49 unsold ÷ 24 booked in 9 months 18 months Solcrest Solcrest, about 0.5 km: 456 unsold ÷ 196 booked in 9 months 21 months Nagama Serenity Nagama Serenity, about 1 km: 57 unsold ÷ 6 booked in 9 months 86 months Nava Vruksha Nava Vruksha, 1.5 km: 488 unsold ÷ 28 booked in 3 months 52 months Disha Harmony Gardens Disha Harmony Gardens, 2.0 km: 68 unsold ÷ 82 booked in 9 months 8 months Disha Symphony Heights Disha Symphony Heights, 2.0 km: 101 unsold ÷ 23 booked in 9 months 40 months
Within 4 km, pooled 3,876 unsold flats ÷ 93 booked a month across 40 projects 42 months In That Quiet Earth Phase 2c In That Quiet Earth Phase 2c, about 0.5 km: 49 unsold ÷ 24 booked in 9 months 18 months Solcrest Solcrest, about 0.5 km: 456 unsold ÷ 196 booked in 9 months 21 months Nagama Serenity Nagama Serenity, about 1 km: 57 unsold ÷ 6 booked in 9 months 86 months Nava Vruksha Nava Vruksha, 1.5 km: 488 unsold ÷ 28 booked in 3 months 52 months Disha Harmony Gardens Disha Harmony Gardens, 2.0 km: 68 unsold ÷ 82 booked in 9 months 8 months Disha Symphony Heights Disha Symphony Heights, 2.0 km: 101 unsold ÷ 23 booked in 9 months 40 months
Within 4 km, pooled 3,876 unsold flats ÷ 93 booked a month across 40 projects 42 months In That Quiet Earth Phase 2c In That Quiet Earth Phase 2c, about 0.5 km: 49 unsold ÷ 24 booked in 9 months 18 months Solcrest Solcrest, about 0.5 km: 456 unsold ÷ 196 booked in 9 months 21 months Nagama Serenity Nagama Serenity, about 1 km: 57 unsold ÷ 6 booked in 9 months 86 months Nava Vruksha Nava Vruksha, 1.5 km: 488 unsold ÷ 28 booked in 3 months 52 months Disha Harmony Gardens Disha Harmony Gardens, 2.0 km: 68 unsold ÷ 82 booked in 9 months 8 months Disha Symphony Heights Disha Symphony Heights, 2.0 km: 101 unsold ÷ 23 booked in 9 months 40 months
Richi's Garden 1 km Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Lake or tank Storm drain, primary Storm drain, smaller Government-flagged flood location The site20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 24.9 km by road 24.9 km MG Road (CBD) MG Road (CBD): 15.3 km by road 15.3 km Manyata Tech Park Manyata Tech Park: 9.6 km by road 9.6 km ITPL, Whitefield ITPL, Whitefield: 16.6 km by road 16.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.0 km by road 23.0 km Electronic City Ph 1 Electronic City Ph 1: 34.3 km by road 34.3 km
Kempegowda Airport Kempegowda Airport: 24.9 km by road 24.9 km MG Road (CBD) MG Road (CBD): 15.3 km by road 15.3 km Manyata Tech Park Manyata Tech Park: 9.6 km by road 9.6 km ITPL, Whitefield ITPL, Whitefield: 16.6 km by road 16.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.0 km by road 23.0 km Electronic City Ph 1 Electronic City Ph 1: 34.3 km by road 34.3 km
Kempegowda Airport Kempegowda Airport: 24.9 km by road 24.9 km MG Road (CBD) MG Road (CBD): 15.3 km by road 15.3 km Manyata Tech Park Manyata Tech Park: 9.6 km by road 9.6 km ITPL, Whitefield ITPL, Whitefield: 16.6 km by road 16.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.0 km by road 23.0 km Electronic City Ph 1 Electronic City Ph 1: 34.3 km by road 34.3 km
Kempegowda Airport Kempegowda Airport: 24.9 km by road 24.9 km MG Road (CBD) MG Road (CBD): 15.3 km by road 15.3 km Manyata Tech Park Manyata Tech Park: 9.6 km by road 9.6 km ITPL, Whitefield ITPL, Whitefield: 16.6 km by road 16.6 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.0 km by road 23.0 km Electronic City Ph 1 Electronic City Ph 1: 34.3 km by road 34.3 km
Six city anchors · OSRM, no traffic Nuisances Distance from the site Sewage treatment plant Sewage treatment plant: 690 m, Sewage Treatment Plant 690 m Electrical substation Electrical substation: 1.7 km 1.7 km Quarry Quarry: 2.7 km 2.7 km
Sewage treatment plant Sewage treatment plant: 690 m, Sewage Treatment Plant 690 m Electrical substation Electrical substation: 1.7 km 1.7 km Quarry Quarry: 2.7 km 2.7 km
Sewage treatment plant Sewage treatment plant: 690 m, Sewage Treatment Plant 690 m Electrical substation Electrical substation: 1.7 km 1.7 km Quarry Quarry: 2.7 km 2.7 km
Sewage treatment plant Sewage treatment plant: 690 m, Sewage Treatment Plant 690 m Electrical substation Electrical substation: 1.7 km 1.7 km Quarry Quarry: 2.7 km 2.7 km
12% Painting Painting: 12% 12% Club House Not started Electricity Not started Gas Not started Outdoor Sports facility Not started 12% Painting Painting: 12% 12% Club House Not started Electricity Not started Gas Not started Outdoor Sports facility Not started 12% Painting Painting: 12% 12% Club House Not started Electricity Not started Gas Not started Outdoor Sports facility Not started Richi's Garden HBR Layout Vaddera Palya (Railway track) Nanda gokula Manyata tech park, MS Ramaiah north city To element mall Telecom layout, Ashwathnagar Vaddara palya, Near Hennur Bande 1 km 3 km 2 km