Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
| Apartment |
| 1,066 sqft carpet (as filed) |
| Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jahnavi Brindavan in the interactive atlas
Approval or registration
Land use converted
Bangalore District · Survey 57
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹3.24 Cr
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.com/YLK/0607/22-23
K-RERA filing, approvals
Transfer of the land
Sale deed
Survey 57
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 57
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/160124/006539
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 57 | |
|---|---|---|
| Land extent, Sy 57 | 1,672 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,672 sq m | |
| Khata | A Khatha · BBMP · 2 Jan 2023 | |
| Sale deed | Dated 1 Jan 2023 | |
| Building plan (BBMP) | Sanctioned 7 Oct 2022 · No. BBMP/Ad.com/YLK/0607/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 15 Oct 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Nov 2026 |
| Land conversion | Converted 25 Jul 1991 · Bangalore District | |
|---|---|---|
| Survey numbers | 57 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Runs to floor 3 · filing: 4 floors | |
| Late-payment interest | Not verified yet | |
| Interest the builder pays on late possession | SBI MCLR + 2% | |
| Transfer fee | 10% of the price | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
3BHK 16.7%3BHK 16.7%3BHK 16.7%3BHK 16.7%2 other types 33.3%
| 3BHK | 4 | 1,453 |
| 3BHK | 4 | 1,453 |
| 3BHK | 4 | 1,485 |
| 3BHK | 4 | 1,195 |
| 3BHK | 4 | 1,216 |
| 3BHK | 4 | 1,485 |
| Sold, Q3 2025-26 | 12 / 24 | |
|---|---|---|
| Unsold, Q3 2025-26 | 12 |
| Century Kindle Phase 1 | about 1 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 2 km | Locked | |
| Legacy Salvador | about 3.5 km | Locked | |
| Godrej Aveline | about 3.5 km | Locked | |
| 4square Park Sierra | about 3.5 km | Locked |
| Jahnavi Brindavan This project | This project is the point the others are measured from | 30 Nov 2026 | 50% (12 of 24) | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 1 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 2 km | 15 May 2026 | 100% (269 of 269) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Tuteenahalli Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Gym | |
|---|---|---|
| Electricity, built | 100% | |
| Gym, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.13 (27 covered spaces for 24 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |

| Main structure | 100% · planned by 29 Aug 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Jan 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | 100% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Jan 2025 | |
| RERA completion date | 30 Nov 2026 | |
| Work began, as filed | 1 Jul 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026 | |
| Architect's certificate, registration | Dated 4 Feb 2023 | |
| Engineer's certificate, registration | Dated 4 Feb 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.15 Cr 31%Development · ₹13.72 Cr 69%
| Estimated cost | ₹19.87 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹12.25 Cr | |
| Cost incurred | ₹19.87 Cr (100% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹3.53 Cr | |
| Land cost revision | Not verified yet | |
Sold (12) 50%Unsold (12) 50%
| Sold, Q3 2025-26 | 12 / 24 · 12 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 12 | |
| 3 BHK, sold | 12 / 24 |
| Escrow bank | INDUSIND BANK · MG Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹0 in Q3 2025-26 | |
| Designated account, withdrawn | ₹0 in Q3 2025-26 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 2 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 7 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | INDUSIND BANK · MG Road, Bangalore | |

| Rubby Castle 1 | about 4.5 km | Locked |
|---|
| Assetz Miru & Miyo | about 5 km | Locked |
|---|
| Tnm Lakeview | about 5 km | Locked |
|---|
| Sri Rama Enclave | about 5 km | Locked |
|---|
| Riviera Glade | about 6 km | Locked |
|---|
| Assetz Soho & Sky | about 6 km | Locked |
|---|
| Cumins Sanctum | about 6 km | Locked |
|---|
| about 3.5 km |
| 31 Dec 2026 |
| 71% (119 of 167) |
| Locked |
| Godrej Aveline | about 3.5 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| 4square Park Sierra | about 3.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Rubby Castle 1 | about 4.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
|---|
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 9,222 | |
| Booked | 5,798 of 9,222 (63%) | |
| Unsold | 3,424 | |
| Booked a month, pooled | 186 flats | |
| Months to sell, pooled | 18 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3 km, Yelahanka | |
| Kempegowda Airport | 17 |
| MG Road (CBD) | 15.5 |
| Manyata Tech Park | 9 |
| ITPL, Whitefield | 22.5 |
| Ecospace, Bellandur ORR | 24 |
| Electronic City Ph 1 | 32.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named KHB Yelahanka on OpenStreetMap |