Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 32 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Leafy Avenue in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner Bangalore District · Survey 141/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO Mugaluru Gram Panchayat · Survey 141/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan APA/ CC/1109 2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/210526/008671
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 8 May 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 4,260 sq m | |
| The whole survey number on the KGIS map | 17,339 sq m | |
| Land area filed with K-RERA | 4,047 sq m | |
| Village, hobli and taluk on the KGIS map | Koothaganahalli, Sarjapura-1 hobli, Anekal taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 141/4 | |
|---|---|---|
| Land extent, Sy 141/4 | 1 Acre | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,047 sq m | |
| Khata | E Khatha · PDO Mugaluru Gram Panchayat · 8 Jan 2026 | |
| Building plan (Anekal Planning Authority) | Sanctioned 10 Mar 2026 · No. APA/ CC/1109 2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 3 May 2025 · Deputy Commissioner Bangalore District | |
|---|---|---|
| Survey numbers | 141/4 |
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Public & semi-public | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 7.1 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.8 km to the east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 200 m to the north-east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (78 covered spaces for 71 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 31 Dec 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Sep 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 10% | |
| Completion, accountant | 3.6% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Jun 2026 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles (600x1200 mm) | |
| Toilet tiles | Anti-skid vitrified tiles (floor) | |
| Wiring | Fire-resistant copper wiring | |
| Sanctioned load per flat | 2BHK: 4 kW; 3BHK: 5 kW | |
| Power backup | 100% power backup for common areas; Power backup in 2BHK flats: 2 kVA | |
| Sewage plant | Sewage treatment plant |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 11 Apr 2026 | |
| Engineer's certificate, registration | Dated 11 Apr 2026 | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.67 Cr 15.3%Development · ₹31.32 Cr 84.7%
| Estimated cost | ₹36.99 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹20.99 Cr | |
| Cost incurred | ₹1.33 Cr (3.6% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | ₹18.7 L | |
| Receivable, sold flats | ₹2.07 Cr | |
| Land cost revision | Not verified yet | |
Sold (8) 11.3%Unsold (63) 88.7%
| Sold, Q1 2026-27 | 3 / 71 · 68 available | |
|---|---|---|
| Sold, Q2 2026-27 | 8 / 71 · 63 available | |
| Unsold, Q2 2026-27 | 63 | |
| Sold in Q2 2026-27 | 5 |
| Escrow bank | HDFC · Koramangala 1st Block | |
|---|---|---|
| Designated account, collected | ₹53.3 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹53.3 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹1,32,69,665 | |
| Sale proceeds realised, Q1 2026-27 | ₹18,66,996 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 8 May 2026 | |
| Building plan | Sanctioned 10 Mar 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Koramangala 1st Block | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Local Water Body) | |
| Nearest city water main | 8.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.8 km to the east, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 11.1 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35.0 |
| MG Road (CBD) | 22.9 |
| Manyata Tech Park | 25.3 |
| ITPL, Whitefield | 11.9 |
| Ecospace, Bellandur ORR | 13.1 |
| Electronic City Ph 1 | 14.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |