Fire NOCGBC(1)280/2011Filed as Fire Force Department, p. 1
Airport height NOCValidity ended 6 Nov 2021Issued 7 Nov 2016
4 pagesAvailable
22 pages1 factAvailable
2 pages3 factsAvailable
2 pagesAvailable
7 pagesAvailable
2 pagesAvailable
1 pageAvailable
Filed 21 Dec 20192 pagesAvailable
Filed 21 Dec 201922 pagesAvailable
Filed 21 Dec 20197 pagesAvailable
Filed 21 Dec 201910 pagesAvailable
Filed 21 Dec 20193 pagesAvailable
Filed 24 Dec 20194 pagesAvailable
2 pagesAvailable
1 pageAvailable
12 pagesAvailable
10 pagesAvailable
3 pagesAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
Source: K-RERA project page and the documents filed there, as read by us. 11 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open New Haven Bengaluru Phase IV in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
GBC(1)280/2011
✓Clear
Environmental clearance
Filed with the registration
Airport height NOC
issued 7 Nov 2016 · permissible top elevation 961.8 m above mean sea level · validity ended 6 Nov 2021
Pollution board (CFE)
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
28 Feb 2022
Registration certificates
PRM/KA/RERA/1251/309/PR/200103/003103
Land use
Conversion order
Not verified yet
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
Water at a glance
Groundwater
Bengaluru North taluk average, July 2023: 22.7 m below ground
What it means
Not verified yet
Water below ground
22.7 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Straight-line distance from the site
Nuisances
Distance from the filed pin
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 29 Sep 2020
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
31 Mar 2021
RERA completion date
28 Feb 2022
Work began, as filed
3 Jul 2019
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹10.37 Cr 9.4%Development · ₹99.70 Cr 90.6%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹110.07 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold, at completion
Sold (90) 36%Unsold (160) 64%
Flats sold per quarter
Completed
K-RERA inventory
Flats sold, at completion
90
Flats unsold, at completion
160
Flats in the phase
250
Compliance
Escrow
Completed
Escrow and filings
Escrow bank
STATE BANK OF INDIA · CAG Mumbai
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
0
Track record
Average schedule slip
Not verified yet
DOSL builder track
Not verified yet
Developer's project loan
Not verified yet
Records searched to
Not verified yet
Building plan
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
STATE BANK OF INDIA · CAG Mumbai
Stage
Certified progress
Completed
Flats in them
217
Booked
115 of 217 (53%)
Unsold
102
Booked a month, pooled
0 flats
Months to sell, pooled
230 months
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot