Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | Not verified yet | |
|---|---|---|
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 29 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| 323–5,371 sqft carpet (as filed) |
| Dec 2024 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
| Artha Zen | Artha Group | Villa | 1,881–4,832 sqft | – |
8 of 190 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Pacific Legacy in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 30 Apr 2022 · No. GL/2030/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-125080 · issued 21 Oct 2023 · valid until 18 Oct 2028 | Clear |
| Water supply NOC | Filed with the registration | |
| Clearances pending | 1, in the latest update | Review |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2025 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 71/2 | Converted 1 Feb 1997 · DC Bangaluru | |
| Sy 71/5 | Converted 1 Feb 1997 · DC Bengaluru | |
| Sy 71/3 | Converted 13 Feb 2020 · DC Bengaluru | |
| Sy 71/7, 71/4, 71/6 | Converted 2 Dec 2019 · DC Bengaluru | |
| Survey numbers | 71/2 · 71/5 · 71/3 · 71/7 · 71/4 · 71/6 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
| Forfeiture, allotment letter | Deducted on cancelling the allotment, within 15 days: nothing; 16 to 30 days: 1% of the cost of the unit; 31 to 60 days: 1.5% of the cost of the unit; after 61 days: 2% of the cost of the unit |
|---|
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (mixed) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 360 m, Anugraha layout RSD phase 1 | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 30 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 250 m to the north-east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance | |
|---|---|---|
| Electricity, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 15.13 (605 covered spaces for 40 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |

| Main structure | 100% · planned by 31 Dec 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Dec 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | 103.6% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2025 | |
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 1 Oct 2023 | |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | All walls: solid concrete blocks | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor); Ceramic tiles (walls, up to 7 feet) | |
| Wiring | Fire-resistant copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | 100% power backup for common areas; Power backup in flats: 1 kVA | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026 | |
| Architect's certificate, registration | Site inspected 15 Apr 2024 | |
| Chartered accountant's certificate, registration | Dated 12 Apr 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹20.00 Cr 60.2%Development · ₹13.21 Cr 39.8%
| Estimated cost | ₹33.21 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹11.54 Cr | |
| Cost incurred | ₹34.42 Cr (103.6% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | ₹7.63 Cr | |
| Receivable, sold flats | ₹80.1 L | |
| Land cost revision | Not verified yet | |
Sold (8) 20%Unsold (32) 80%
| Sold, Q3 2025-26 | 8 / 40 · 32 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 32 |
| Escrow bank | CENTRAL BANK OF INDIA · Sarakki Layout Branch | |
|---|---|---|
| Designated account, collected | ₹1.12 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹1.36 Cr in Q3 2025-26 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 30 Apr 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | CENTRAL BANK OF INDIA · Sarakki Layout Branch | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 450 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 30 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 1.1 km, I.I.M.B | |
| Kempegowda Airport | 34.8 |
| MG Road (CBD) | 8.4 |
| Manyata Tech Park | 16.1 |
| ITPL, Whitefield | 16.8 |
| Ecospace, Bellandur ORR | 8.3 |
| Electronic City Ph 1 | 10.2 |
| Landfill or waste transfer station | 1.1 km to the south | |
|---|---|---|
| Sewage treatment plant | 480 m to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the south-east |