Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 2 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 46 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Satori Residence By Genurise in the interactive atlas
Transfer of the land
Sale deed
Survey 35/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 35/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore · Survey 35/1, 35/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore · Survey 35/1, 35/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 35/1, 35/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 35/1, 35/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0121/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/020226/008444
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 35/1, 35/2 | |
|---|---|---|
| Land extent, Sy 35/1 | 1 Acre 32 Guntas | |
| Land extent, Sy 35/2 | 1 Acre | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 11,837 sq m | |
| Khata | E Khatha · BBMP · 9 May 2025 | |
| Sale deed | Dated 26 Jun 1997, 25 Sep 2006 | |
| Building plan (BBMP) | Sanctioned 18 Oct 2025 · No. BBMP/Addl.Dir/JDNORTH/0121/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2030 |
| Land conversion | Converted 20 May 2008 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 35/1 · 35/2 |
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 880 m, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 140 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 350 m to the south, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Power Backup · Water and Sanitation · COMMUNICATION ROOM · OHT · DRIVER TOILET · LANDSCAPED TERRACE | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Water and Sanitation, built | 0% | |
| TRANSFORMER & DG YARD, built | 0% | |
| SECURITY +Toilet, built | 0% | |
| REFUGEE AREA (19TH FLOOR), built | 0% | |
| LANDSCAPED TERRACE, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.29 (207 covered spaces for 161 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 11 Nov 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 26 Dec 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 17% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Jun 2030 | |
| RERA completion date | 30 Jun 2030 | |
| Work began, as filed | 15 Feb 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 73.6 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 193.43 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Chartered accountant, Form 4 | Dated 15 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹27.72 Cr 15.2%Development · ₹154.21 Cr 84.8%
| Estimated cost | ₹181.93 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (16) 9.9%Unsold (145) 90.1%
| Sold, Q4 2025-26 | 2 / 161 · 159 available | |
|---|---|---|
| Sold, Q2 2026-27 | 16 / 161 · 145 available | |
| Unsold, Q2 2026-27 | 145 | |
| Flats booked, Form 4 Q1 2026-27 | 11 |
| Escrow bank | ICICI Bank · HSR Layout | |
|---|---|---|
| Designated account, collected | ₹2.49 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.89 Cr in Q2 2026-27 (76% of that quarter's deposits) | |
| Share of collections deposited in escrow | 73.5% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 18 Oct 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · HSR Layout | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 200 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 140 m to the west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 2.9 km, Bellandur | |
| Kempegowda Airport | 32.6 |
| MG Road (CBD) | 12.7 |
| Manyata Tech Park | 17.4 |
| ITPL, Whitefield | 10.0 |
| Ecospace, Bellandur ORR | 2.7 |
| Electronic City Ph 1 | 7.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.6 km to the north-west |