Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | |
| Airport CityLapsed · completion date passed | Srinivasa M | Plot | – | Dec 2021 |
| Arvind GreatlandsApplied for completion 16/12/2024 | Arvind SmartSpaces | Plot | 1,200–2,400 sqft | – |
| Assetz City Of PalmsActive · 86% built | ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED | Plot | ~1,200–2,020 sqft (estimate: filed carpet plus 25%) | Feb 2029 |
| Atmos SilverwoodsExtended to 31-05-2027 | ATMOS CONSTRUCTIONS PRIVATE LIMITED | Villa | 2,333 sqft carpet (as filed) | May 2027 |
| Canterburry MeadowsApplied for completion 10/05/2024 | ARUNAPANCHAMI ESTATES PRIVATE LIMITED | Plot | ~1,280 sqft (estimate: filed carpet plus 25%) | Mar 2020 |
| Canterbury HillviewApplied for completion 23/01/2023 | SLNS AVYUKTHA HOMES | Plot | – | Jul 2021 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: Svarna Properties
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 11 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Review |
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Century GreensApplied for completion 12/07/2022 | Century Star | Plot | – | Dec 2021 |
| Century Greens Phase 2Applied for completion 07/04/2022 | CENTURY STAR | Plot | ~1,160–2,400 sqft (estimate: filed carpet plus 25%) | Dec 2021 |
8 of 32 other projects in Doddaballapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Svarna Samruddhi Paradise in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹15.0 L · Sy 8, Thammashettihalli village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 9, 13 · See it in Documents
Covers 8/1, 8/3 only
Transfer of the land
Title deed registered
No. DBP-1-06088-2014-15 · Book 1 · executed 27 Aug 2014 · Consideration ₹40.0 L
Title deed filed with K-RERA, pp. 1, 10, 11 · See it in Documents
Transfer of the land
Title deed registered
No. DBP-1-06088-2014-15 · Book 1 · executed 27 Aug 2014 · Consideration ₹40.0 L
Title deed filed with K-RERA, pp. 1, 10, 11 · See it in Documents
Covers 8/1, 8/3 only
Transfer of the land
Title deed registered
No. DBP-1-06087-2014-15 · Book 1 · Consideration ₹40.0 L
Title deed filed with K-RERA, pp. 9, 10 · See it in Documents
Transfer of the land
Title deed registered
No. DBP-1-06087-2014-15 · Book 1 · Consideration ₹40.0 L
Title deed filed with K-RERA, pp. 9, 10 · See it in Documents
Covers 8/1, 8/3 only
Transfer of the land
Title deed registered
executed 27 Aug 2014 · Consideration ₹30.0 L · Sy 8, Thammashettihalli village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 10, 11, 14 · See it in Documents
Transfer of the land
Title deed registered
executed 27 Aug 2014 · Consideration ₹30.0 L · Sy 8, Thammashettihalli village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 10, 11, 14 · See it in Documents
Covers 8/1, 8/3 only
Transfer of the land
Sale deed
Survey 8/1, 8/3, 9/3, 9/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 8/1, 8/3, 9/3, 9/4
K-RERA filing, land schedule
Approval or registration
Land use converted
District Commissioner, Bengaluru Rural · Survey 8/1, 8/2, 8/3, 9/3 and 1 more
K-RERA filing, land schedule
Approval or registration
Land use converted
District Commissioner, Bengaluru Rural · Survey 8/1, 8/2, 8/3, 9/3 and 1 more
K-RERA filing, land schedule
Covers 8/2 only
Transfer of the land
Title deed registered
No. DBP-1-09181-2017-18 · Book 1 · executed 30 Nov 2017 · Consideration ₹1.24 Cr
Title deed filed with K-RERA, pp. 1, 12, 14 · See it in Documents
Covers 8/2 only
Transfer of the land
Sale deed
Survey 8/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan STRRPA/TP-4/LAO/10/2019-20
K-RERA filing, approvals
Covers 8/2 only
Approval or registration
Khata issued
A Khatha · 0 · Survey 8/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · NA · Survey 8/1, 8/3, 9/3, 9/4 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · NA · Survey 8/1, 8/3, 9/3, 9/4 and 1 more
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/301/PR/010422/004807
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 109 (Shivapura) |
| East | EC schedule not read yet | Survey 10 (Thammashettyhalli) |
| South | EC schedule not read yet | Survey 134, 138 (J.I.Raghunathapura) |
| West | EC schedule not read yet | Survey 7 (Thammashettyhalli) |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched plots on the KGIS map | 28,412 sq m | |
| Village, hobli and taluk on the KGIS map | Thammashettyhalli, Kasaba hobli, Doddaballapura taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 8/1, 8/2, 8/3, 9/3, 9/4 | |
|---|---|---|
| Area on the KGIS map | 28,412 sq m, 2 of 2 filed survey numbers | |
| Khata | A Khatha · NA · 3 Nov 2021; A Khatha · 0 · 3 Nov 2021 | |
| Sale deed | Dated 7 Oct 2014, 18 Dec 2017 | |
| Title deed | Sy 8/2; 8, Kasaba hobli; Sy 8/1; 8, Kasaba hobli; and 1 more item |
| Joint development agreement number | 2860 of Book 1, 2020-21 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BBMP) | Sanctioned 30 Jun 2020 · No. STRRPA/TP-4/LAO/10/2019-20 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2022 |
| Land conversion | Converted 29 Aug 2017 · District Commissioner, Bengaluru Rural | |
|---|---|---|
| Survey numbers | 8/1 · 8/2 · 8/3 · 9/3 · 9/4 · 8/2 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 20.9 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.3 km to the south-west, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 360 m to the north-east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2022 | Red flag |
| Work began, as filed | 1 Apr 2021 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 15 Nov 2021 · site inspected 11 Nov 2021 | |
| Engineer's certificate, registration | Dated 15 Nov 2021 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.00 Cr 58.8%Development · ₹3.50 Cr 41.2%
| Estimated cost | ₹8.50 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.50 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Yelahanka Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 30 Jun 2020 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Yelahanka Branch | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 31.2 m
Across Doddaballapura, the water table sat 20 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 31.2 m, and it recovered 4.7 m over the year.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 20 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (BASHETTIHALLI TOWN PLANNING PANCHAYAT) | |
| Nearest city water main | 18.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.3 km to the south-west, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 15.1 km, Doddajala | |
| Kempegowda Airport | 19.3 |
| MG Road (CBD) | 36.0 |
| Manyata Tech Park | 28.8 |
| ITPL, Whitefield | 39.6 |
| Ecospace, Bellandur ORR | 43.3 |
| Electronic City Ph 1 | 52.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.8 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 570 m to the north-west, named Doddabalapura on OpenStreetMap |