Price paid per sq ft, super built-up Approvals
Is it approved for its use? Red flag1 red flag · 1 to review · 3 clear SourcesReport an error Building plan (BDA) Not verified yet
RERA extensions Granted ! Review Review
RERA complaints 8 × Red flag Red flag
Land conversion Not verified yet
Permits RERA Land use Disputes & cases
Are there court cases or buyer complaints on this project? Cases on the landNot checked Cases on the builder45 cases RERA complaints5 cases Builder's other projects120 cases Filed on Case no. Filed at What it's about Status
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Contract & costs
What does a buyer commit to? Report an error
We haven't verified this for this project yet.
Notify me when it's verifiedSign in first, then it is one click.
Adjust maadbeda.Brochure nodbeda. Read the record.
× A free account
✓ Search every registered project by name, survey or RERA number ✓ Save projects to My list and your own lists ✓ The map and every layer, free with your account ✓ No card needed It costs nothing. Your email only signs you in.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Forfeiture, agreement Not verified yet
Forfeiture, allotment letter Not verified yet
Transfer fee Not verified yet
Maintenance included Not verified yet
Cancellation Payments Fees Cancellation Agreement and allotment letter Valuation
What is it worth? We haven't verified the rest of this yet.
Notify me when it's verifiedSign in first, then it is one click.
Adjust maadbeda.Brochure nodbeda. Read the record.
× A free account
✓ Search every registered project by name, survey or RERA number ✓ Save projects to My list and your own lists ✓ The map and every layer, free with your account ✓ No card needed It costs nothing. Your email only signs you in.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Recent price, super built-up Not verified yet
Recent price, carpet Not verified yet
Phase 1 → Phase 2 Not verified yet
Gross yield, per sq ft Not verified yet
This project Price Unit sizes Unsold stock Registered deeds The area Price trend Registered sales around Comparable projects Nearest projects Rent & yield Unsold stock nearby Location & risks
What is the location like? Review1 to review · 1 clear SourcesReport an error Height above nearest drain Not verified yet
Groundwater, taluk average 22.7 m below ground Bengaluru North taluk, July 2023
Water supply, as filed Local authority Declared by the promoter
Metro, operational 3.0 km Dasarahalli
The site Zoning & hazards Flooding Amenities Around it Water Distances Connectivity Nuisances Construction & progress
How is it being built, and when will it be ready? Clear1 clear SourcesReport an error Completion 50% As of Q2 2026-27, promoter's return
Possession, agreement Not verified yet
Structure Not verified yet
Structural safety certificate Not verified yet
Progress Work left Dates Specified structure Specified finishes Certificates Progress Completion, as the promoter reported it Developer
Can the developer deliver? Clear2 clear SourcesReport an error Receivable, sold flats Not verified yet
Cost left Not verified yet
Sold 660 / 660 ✓ Clear Clear
Sold in Q2 2026-27 0 ✓ Clear Clear
Funding Sales Compliance Track record Loan & collateral
Can it be financed? Value, 3BHK A Not verified yet
Max loan, 3BHK A Not verified yet
Borrower margin Not verified yet
Developer's project loan Not verified yet
Value & LTV Conditions Stage Data room
Documents filed for this project
Documents filed 132 On K-RERA
Available 132 100% of filed
K-RERA only 0
Approvals with a validity date None read
Land & title Who owns the land? 14 files · 14 available Plans & drawings What was approved to be built? 11 files · 11 available Approvals & NOCs Which offices cleared it? 24 files · 24 available Quarterly certificates Is the work on track? 49 files · 49 available Financial statements Is the builder's money in order? 19 files · 19 available Declarations What did the builder promise? 6 files · 6 available Registration Who is the builder? 1 file · 1 available Other Everything else 8 files · 8 available
Approvals & NOCs All 24 Available 24 What we read
Environmental clearance Issued 28 Aug 2020 Filed as SEIAA, p. 1
Engineering License Filed 11 Mar 2026 AvailableBESCOM NOC Affidavit Filed 11 Mar 2026 AvailableBWSSB Noc Affidavit Filed 11 Mar 2026 AvailableLatest Fire NOC Filed 11 Mar 2026 AvailableLatest AAI NOC Filed 11 Mar 2026 AvailableLatest BSNL Noc Filed 11 Mar 2026 AvailableLatest KSBCB NOC Filed 11 Mar 2026 AvailableBESCOM NOC Filed 11 Mar 2026 AvailableBWSSB NOC Filed 11 Mar 2026 AvailableCommencement Certificate AvailableApproval/NOC under Sec 14 of the KTCP Act AvailableFire Force Department AvailableAirport Authority of India AvailableBESCOM AvailableBWSSB AvailableKSPCB AvailableSEIAA 2 facts AvailableBSNL AvailableNOC in case of building proposals abutting to neighbouring properties AvailableLift Authorities AvailableBMRCL AvailableBangalore Urban Arts Commission AvailableInspector of Factories Controller of explosives Railways AvailableCoastal Regulation Zone Authority AvailableSource: K-RERA project page and the documents filed there, as read by us. 69 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report ₹99 for this report · opens Title & ownership and Disputes & cases Unlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Survey plots, KGIS cadastral Road, stream, tank or settlement (not a plot) Filed site pinBoundaries Schedule in the EC vs KGIS neighbours Survey sketch Survey sketch filed with K-RERA Sketch, sanction and mutation vs KGIS map Land record Filing vs KGIS map •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey Ownership Joint development agreement Unlock this full report ₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what The Poem by Shriram (Poem by the Lake)'s developer filed before you say yes.
× The Poem by Shriram (Poem by the Lake)
Shriram Properties · Jalahalli
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/309/PR/210319/004033 Renewed certificate EX/PRM/KA/RERA/1251/309/PR/260422/004033 ₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what The Poem by Shriram (Poem by the Lake)'s developer filed before you say yes.
× The Poem by Shriram (Poem by the Lake)
Shriram Properties · Jalahalli
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Agreement for sale
Price per sq ft, super built-up Registered deeds Transactions in this project The area Price trend North Bengaluru, past year Not verified yet
Bengaluru, past year Not verified yet
North since 2022 Not verified yet
This project vs North Bengaluru Not verified yet
Price per sq ft, super built-up Registered sales around Registered sale price per sq ft, by year Transactions around this project Comparable projects Carpet price, projects within 4 km
Filed prices nearby 0% 50% 100% Q3 2025-26: 50% 50% Q3 2025-26 Q4 2025-26: 50% 50% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 50% 50% Q2 2026-27 0% 50% 100% Q3 2025-26: 50% 50% Q3 2025-26 Q4 2025-26: 50% 50% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 50% 50% Q2 2026-27
Work left By component, Q2 2026-27 Tower-1 Tower-1: 70% 70% Tower-2 Tower-2: 67% 67% Tower-3 Tower-3: 47% 47% Tower-4 Tower-4: 27% 27% Tower-5 Tower-5: 26% 26% Tower-6 Tower-6: 10% 10% Earth work and other leveling pr… Earth work and other leveling preparation work: 92% 92% Retaining wall (All types) Retaining wall (All types): 87% 87%
Dates Dates 2021 2023 2025 2027 Work began 1 Mar 2021 Builder's schedule ends 28 Feb 2026 As of 28 Oct 2026 RERA deadline 31 Mar 2027 Work began: 1 Mar 2021 Builder's schedule ends: 28 Feb 2026 As of 28 Oct 2026 RERA deadline: 31 Mar 2027
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Sales Sold vs unsold, Q2 2026-27 Sold (660): 100% 100% 660 flats Sold (660) 100%
Flats sold per quarter Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Compliance Escrow, Q2 2026-27 Paid in ₹0 Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹24.2 L
Paid in ₹0 Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹24.2 L
Paid in ₹0 Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹24.2 L
Paid in ₹0 Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹24.2 L
Escrow and filings Records searched to Not verified yet
Building plan Not verified yet
Unregistered agreements, over 10% paid Not verified yet
Sale deed in favour of Not verified yet
Escrow bank HDFC · SADASHIVNAGAR BANGALORE
Stage Progress as reported, by quarter Q3 2025-26 Q3 2025-26: 50% built, as the promoter reported it 50% Q4 2025-26 Q4 2025-26: 50% built, as the promoter reported it 50% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27 Q2 2026-27: 50% built, as the promoter reported it 50%
Q3 2025-26 Q3 2025-26: 50% built, as the promoter reported it 50% Q4 2025-26 Q4 2025-26: 50% built, as the promoter reported it 50% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27
9 21 60 21 34 59 71 12 15 80 19 16 58 69 70 54 14 31 57 16 66 13 73 17 33 63 38 61 76 21 32 20 23 62 22 56 28 24 20 29 25 19 17 55 30 100 m Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Storm drain, smaller Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The siteDs Max Sonata Nest Completed · OC 20-07-2021 DS Max Properties Private Limited Apartment 644 sqft carpet (as filed) Completed
Durga Samrudhi Active · 98% built SREE SHIVADURGA BUILDERS Apartment 889–1,115 sqft carpet (as filed) Dec 2026
Other projects in Jalahalli, A to Z
8 of 17 other projects in Jalahalli, A to Z. Status is taken from each project's own filing.
Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 5 listings 1BHK: median ₹7,500 /mo over 5 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹7,500 /mo 2BHK · 7 listings 2BHK: median ₹15,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo
1BHK · 5 listings 1BHK: median ₹7,500 /mo over 5 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹7,500 /mo 2BHK · 7 listings 2BHK: median ₹15,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo
1BHK · 5 listings 1BHK: median ₹7,500 /mo over 5 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹7,500 /mo 2BHK · 7 listings
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 951 unsold flats ÷ 48 booked a month across 11 projects 20 months Dhara Nakshthra Dhara Nakshthra, 2.2 km: 71 unsold ÷ 6 booked in 9 months 107 months The Pinnacle The Pinnacle, about 2.5 km: 78 unsold ÷ 16 booked in 9 months 44 months Durga Samrudhi Durga Samrudhi, about 3.5 km: 62 unsold ÷ 18 booked in 9 months 31 months Rubby Castle 1 Rubby Castle 1, about 3.5 km: 24 unsold ÷ 5 booked in 9 months 43 months Kumar Platina Kumar Platina, about 3.5 km: 130 unsold ÷ 22 booked in 3 months 18 months Natures Lap By 5 Elements
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Storm drain, primary Storm drain, smaller The siteAround it Water Groundwater, Bengaluru North taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru North: 26.8 m Bengaluru North taluk average, July 2023 22.7 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
0% 50% 100% Q3 2025-26: 50% 50% Q3 2025-26 Q4 2025-26: 50% 50% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 50% 50% Q2 2026-27 0% 50% 100% Q3 2025-26: 50% 50% Q3 2025-26 Q4 2025-26: 50% 50% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 50% 50% Q2 2026-27 As the promoter reported it
Sub-structure flooring (Parking… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 25% 25% Main structure Main structure: 43% 43% Dadoing, Skirting, Flooring, Tile… Dadoing, Skirting, Flooring, Tiles work (All types): 26% 26% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 17% 17% Community Hall Not started Electricity Not started Gym Not started Indoor Sports facility Not started Tower-1 Tower-1: 70% 70% Tower-2 Tower-2: 67% 67% Tower-3 Tower-3: 47% 47% Tower-4 Tower-4: 27% 27% Tower-5 Tower-5: 26% 26% Tower-6 Tower-6: 10% 10% Earth work and other leveling pre… Earth work and other leveling preparation work: 92% 92% Retaining wall (All types) Retaining wall (All types): 87% 87% Sub-structure flooring (Parking F… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 25% 25% Main structure Main structure: 43% 43% Dadoing, Skirting, Flooring, Tile… Dadoing, Skirting, Flooring, Tiles work (All types): 26% 26% Electrification, Water supply and…
Tower-1 Tower-1: 70% 70% Tower-2 Tower-2: 67% 67% Tower-3 Tower-3: 47% 47% Tower-4 Tower-4: 27% 27% Tower-5 Tower-5: 26% 26% Tower-6 Tower-6: 10% 10% Earth work and other leveling pre… Earth work and other leveling preparation work: 92% 92% Retaining wall (All types) Retaining wall (All types): 87% 87% Sub-structure flooring (Parking F… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 25% 25% Main structure Main structure: 43% 43% Dadoing, Skirting, Flooring, Tile… Dadoing, Skirting, Flooring, Tiles work (All types): 26% 26% Electrification, Water supply and…
Tower-1 Tower-1: 70% 70% Tower-2 Tower-2: 67% 67% Tower-3 Tower-3: 47% 47% Tower-4 Tower-4: 27% 27% Tower-5 Tower-5: 26% 26% Tower-6 Tower-6: 10% 10% Earth work and other leveling pre… Earth work and other leveling preparation work: 92% 92% Retaining wall (All types) Retaining wall (All types): 87% 87% Sub-structure flooring (Parking F… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 25% 25% Main structure Main structure: 43% 43% Dadoing, Skirting, Flooring, Tile… Dadoing, Skirting, Flooring, Tiles work (All types): 26% 26% Electrification, Water supply and…
Quarterly return, Q2 2026-27 2021 2022 2023 2024 2025 2026 2027 Work began 1 Mar 2021 Builder's schedule ends 28 Feb 2026 As of 28 Oct 2026 RERA deadline 31 Mar 2027 Work began: 1 Mar 2021 Builder's schedule ends: 28 Feb 2026 As of 28 Oct 2026 RERA deadline: 31 Mar 2027
2021 2022 2023 2024 2025 2026 2027 Work began 1 Mar 2021 Builder's schedule ends 28 Feb 2026 As of 28 Oct 2026 RERA deadline 31 Mar 2027 Work began: 1 Mar 2021 Builder's schedule ends: 28 Feb 2026 As of 28 Oct 2026 RERA deadline: 31 Mar 2027
2021 2022 2023 2024 2025 2026 2027 Work began 1 Mar 2021 Builder's schedule ends 28 Feb 2026 As of 28 Oct 2026 RERA deadline 31 Mar 2027 Work began: 1 Mar 2021 Builder's schedule ends: 28 Feb 2026 As of 28 Oct 2026 RERA deadline: 31 Mar 2027
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Q2 2026-27: 50% built, as the promoter reported it 50% Q3 2025-26 Q3 2025-26: 50% built, as the promoter reported it 50% Q4 2025-26 Q4 2025-26: 50% built, as the promoter reported it 50% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27 Q2 2026-27: 50% built, as the promoter reported it 50%
Q3 2025-26 Q3 2025-26: 50% built, as the promoter reported it 50% Q4 2025-26 Q4 2025-26: 50% built, as the promoter reported it 50% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27 Q2 2026-27: 50% built, as the promoter reported it 50%
Shambhavinagar Upstreams of Devinagar (junction of Ring road and railway track) of Hebbal Gundappa Layout & Belmar Layout TATA nagar 8th cross Aaimatha layout, Mallasandra MEI layout Kammagondanahalli near MNTI Polytechnic Shettihalli & Chikkasandra Village Siddeswara Layout Thindlu to Doddabommasandra tank Gurudarshan Layout, Near Doddabommasandra Devi Nagara JRD Tata Nagar Bhadrappa Layout, Nagashettihalli CHICKKABIDRIKAL RUKMINI NAGARA NEAR MAGADI ROAD (WARD NO 73) BHUVANESHWARI NAGARA WARD NO 15 BAGALKUNTE( L NARSIMHAYA LAYOUT) KEMPEGOWDANAGAR 1 km 3 km 2 km 1 km 3 km 2 km Vruksha Greens: the price is part of that project's own report Basemap: Esri, OpenStreetMap contributors
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vruksha Greens, price locked.
This project Padlock: that project's price is part of its own report2BHK: median ₹15,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo 1BHK · 5 listings 1BHK: median ₹7,500 /mo over 5 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹7,500 /mo 2BHK · 7 listings 2BHK: median ₹15,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo
Natures Lap By 5 Elements, 3.4 km: 212 unsold ÷ 147 booked in 9 months 13 months Within 4 km, pooled 951 unsold flats ÷ 48 booked a month across 11 projects 20 months Dhara Nakshthra Dhara Nakshthra, 2.2 km: 71 unsold ÷ 6 booked in 9 months 107 months The Pinnacle The Pinnacle, about 2.5 km: 78 unsold ÷ 16 booked in 9 months 44 months Durga Samrudhi Durga Samrudhi, about 3.5 km: 62 unsold ÷ 18 booked in 9 months 31 months Rubby Castle 1 Rubby Castle 1, about 3.5 km: 24 unsold ÷ 5 booked in 9 months 43 months Kumar Platina Kumar Platina, about 3.5 km: 130 unsold ÷ 22 booked in 3 months 18 months Natures Lap By 5 Elements Natures Lap By 5 Elements, 3.4 km: 212 unsold ÷ 147 booked in 9 months 13 months
Within 4 km, pooled 951 unsold flats ÷ 48 booked a month across 11 projects 20 months Dhara Nakshthra Dhara Nakshthra, 2.2 km: 71 unsold ÷ 6 booked in 9 months 107 months The Pinnacle The Pinnacle, about 2.5 km: 78 unsold ÷ 16 booked in 9 months 44 months Durga Samrudhi Durga Samrudhi, about 3.5 km: 62 unsold ÷ 18 booked in 9 months 31 months Rubby Castle 1 Rubby Castle 1, about 3.5 km: 24 unsold ÷ 5 booked in 9 months 43 months Kumar Platina Kumar Platina, about 3.5 km: 130 unsold ÷ 22 booked in 3 months 18 months Natures Lap By 5 Elements Natures Lap By 5 Elements, 3.4 km: 212 unsold ÷ 147 booked in 9 months 13 months
Within 4 km, pooled 951 unsold flats ÷ 48 booked a month across 11 projects 20 months Dhara Nakshthra Dhara Nakshthra, 2.2 km: 71 unsold ÷ 6 booked in 9 months 107 months The Pinnacle The Pinnacle, about 2.5 km: 78 unsold ÷ 16 booked in 9 months 44 months Durga Samrudhi Durga Samrudhi, about 3.5 km: 62 unsold ÷ 18 booked in 9 months 31 months Rubby Castle 1 Rubby Castle 1, about 3.5 km: 24 unsold ÷ 5 booked in 9 months 43 months Kumar Platina Kumar Platina, about 3.5 km: 130 unsold ÷ 22 booked in 3 months 18 months Natures Lap By 5 Elements Natures Lap By 5 Elements, 3.4 km: 212 unsold ÷ 147 booked in 9 months 13 months
250 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Lake or tank Storm drain, primary Storm drain, smaller The site20 to 40 Ten-year July mean for Bengaluru North: 26.8 m Bengaluru North taluk average, July 2023 22.7 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru North: 26.8 m Bengaluru North taluk average, July 2023 22.7 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru North: 26.8 m Bengaluru North taluk average, July 2023 22.7 m below ground Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
Connectivity Straight-line distance from the site Kempegowda Airport Kempegowda Airport: 24.7 km, straight line 24.7 km MG Road (CBD) MG Road (CBD): 13.6 km, straight line 13.6 km Manyata Tech Park Manyata Tech Park: 11.1 km, straight line 11.1 km ITPL, Whitefield ITPL, Whitefield: 25.2 km, straight line 25.2 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.5 km, straight line 23.5 km Electronic City Ph 1 Electronic City Ph 1: 30.7 km, straight line 30.7 km
Kempegowda Airport
Nuisances Distance from the site Electrical substation Electrical substation: 880 m, Abbigere 880 m Sewage treatment plant Sewage treatment plant: 1.6 km, Chikkabanavara 5MLD Sewage Treatment Plant 1.6 km
Electrical substation Electrical substation: 880 m, Abbigere 880 m Sewage treatment plant Sewage treatment plant: 1.6 km, Chikkabanavara 5MLD Sewage Treatment Plant 1.6 km
Electrical substation Electrical substation: 880 m, Abbigere 880 m Sewage treatment plant Sewage treatment plant: 1.6 km, Chikkabanavara 5MLD Sewage Treatment Plant 1.6 km
Electrical substation
Electrification, Water supply and Sanitary Finishing: 17% 17% Community Hall Not started Electricity Not started Gym Not started Indoor Sports facility Not started Electrification, Water supply and Sanitary Finishing: 17% 17% Community Hall Not started Electricity Not started Gym Not started Indoor Sports facility Not started Electrification, Water supply and Sanitary Finishing: 17% 17% Community Hall Not started Electricity Not started Gym Not started Indoor Sports facility Not started Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Storm drain, smaller Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The siteKempegowda Airport: 24.7 km, straight line 24.7 km MG Road (CBD) MG Road (CBD): 13.6 km, straight line 13.6 km Manyata Tech Park Manyata Tech Park: 11.1 km, straight line 11.1 km ITPL, Whitefield ITPL, Whitefield: 25.2 km, straight line 25.2 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.5 km, straight line 23.5 km Electronic City Ph 1 Electronic City Ph 1: 30.7 km, straight line 30.7 km Kempegowda Airport Kempegowda Airport: 24.7 km, straight line 24.7 km MG Road (CBD) MG Road (CBD): 13.6 km, straight line 13.6 km Manyata Tech Park Manyata Tech Park: 11.1 km, straight line 11.1 km ITPL, Whitefield ITPL, Whitefield: 25.2 km, straight line 25.2 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.5 km, straight line 23.5 km Electronic City Ph 1 Electronic City Ph 1: 30.7 km, straight line 30.7 km
Kempegowda Airport Kempegowda Airport: 24.7 km, straight line 24.7 km MG Road (CBD) MG Road (CBD): 13.6 km, straight line 13.6 km Manyata Tech Park Manyata Tech Park: 11.1 km, straight line 11.1 km ITPL, Whitefield ITPL, Whitefield: 25.2 km, straight line 25.2 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 23.5 km, straight line 23.5 km Electronic City Ph 1 Electronic City Ph 1: 30.7 km, straight line 30.7 km
Six city anchors · straight line Electrical substation: 880 m, Abbigere 880 m Sewage treatment plant Sewage treatment plant: 1.6 km, Chikkabanavara 5MLD Sewage Treatment Plant 1.6 km
Shambhavinagar Upstreams of Devinagar (junction of Ring road and railway track) of Hebbal Gundappa Layout & Belmar Layout TATA nagar 8th cross Aaimatha layout, Mallasandra MEI layout Kammagondanahalli near MNTI Polytechnic Shettihalli & Chikkasandra Village Siddeswara Layout Thindlu to Doddabommasandra tank Gurudarshan Layout, Near Doddabommasandra Devi Nagara JRD Tata Nagar Bhadrappa Layout, Nagashettihalli CHICKKABIDRIKAL RUKMINI NAGARA NEAR MAGADI ROAD (WARD NO 73) BHUVANESHWARI NAGARA WARD NO 15 BAGALKUNTE( L NARSIMHAYA LAYOUT) KEMPEGOWDANAGAR 1 km 3 km 2 km
The Poem by Shriram (Poem by the Lake) full report… | DOSL