Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 19 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Upavan in the interactive atlas
Transfer of the land
Sale deed
Survey 7/11, 7/12
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy commissioner, Bangalore Urban district · Survey 7/11, 7/12
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan LAO/75/2021-22
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Hennagara, Grama Panchayath · Survey 7/11, 7/12
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/141022/005324
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 7/11, 7/12 | |
|---|---|---|
| Land extent, Sy 7/11 | 0 acre 18 guntas | |
| Land extent, Sy 7/12 | 15 guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,086 sq m | |
| Khata | E Khatha · Hennagara, Grama Panchayath · 17 Aug 2022 | |
| Sale deed | Dated 30 Jun 2018 | |
| Building plan (Local Planning Authority) | Sanctioned 28 Jul 2022 · No. LAO/75/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 25 Apr 2025 |
| Land conversion | Converted 14 Mar 2022 · Deputy commissioner, Bangalore Urban district | |
|---|---|---|
| Survey numbers | 7/11 · 7/12 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2bhk · avg 56 m² 58.3%3bhk · avg 76 m² 33.3%1bhk 8.3%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1bhk | 4 | 1,550 |
| 2bhk | 28 | 16,867 |
| 3bhk | 16 | 13,003 |
| Abhee Serenity Springs | about 1 km | Locked | |
|---|---|---|---|
| Vasuki Vallabha | about 3 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 3 km | Locked | |
| Sowmya Skyla | about 3.5 km | Locked | |
| Ramky One Karnival |
| Upavan This project | This project is the point the others are measured from | 25 Apr 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Abhee Serenity Springs | about 1 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
| Vasuki Vallabha | about 3 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 8.5 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.83 (40 covered spaces for 48 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 10 Aug 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 25 Apr 2025 | |
|---|---|---|
| Schedule end | 12 Mar 2025 | |
| RERA completion date | 25 Apr 2025 | |
| Work began, as filed | 25 Aug 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 7 Sep 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.80 Cr 17.9%Development · ₹8.25 Cr 82.1%
| Estimated cost | ₹10.05 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (29) 60.4%Unsold (19) 39.6%
| Flats sold, at completion | 29 | |
|---|---|---|
| Flats unsold, at completion | 19 | |
| Flats in the phase | 48 |
| Escrow bank | UCO Bank · HSR Layout | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 28 Jul 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | UCO Bank · HSR Layout | |
| about 4 km |
| Locked |
| Signature Heights | about 5 km | Locked |
|---|
| Aiikya Forestscape | about 6.5 km | Locked |
|---|
| Columbia Aaltius | about 6.5 km, to a locality centre | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 6.5 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 6.5 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 6.5 km | Locked |
|---|
| SOBHA Townpark | about 7 km | Locked |
|---|
| Shriram Sapphire (Codename Ultimate) |
|---|
| about 3 km |
| 5 Nov 2028 |
| 100% (414 of 414) |
| Locked |
| Sowmya Skyla | about 3.5 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Ramky One Karnival | about 4 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
|---|
| Signature Heights | about 5 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
|---|
| Projects within 4 km, counted | 25 (25 with an approximate location) | |
|---|---|---|
| Flats in them | 12,054 | |
| Booked | 2,953 of 12,054 (24%) | |
| Unsold | 9,101 | |
| Booked a month, pooled | 42 flats | |
| Months to sell, pooled | 216 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 2.5 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 44.5 |
| MG Road (CBD) | 21.5 |
| Manyata Tech Park | 28.5 |
| ITPL, Whitefield | 21.5 |
| Ecospace, Bellandur ORR | 14 |
| Electronic City Ph 1 | 4.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Yerandanahalli Substation on OpenStreetMap |