| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Adithya Homes GrandCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditi TropicaLapsed · completion date passed | ADITI TROPICA | Apartment | – | Dec 2020 |
| Akshaya Temple TreeLapsed · completion date passed | Akshaya Builders Developers Promoters | Apartment | – | Jan 2023 |
| AlayaCompleted (regulator flag) | Essem18 Developers Private Limited | Apartment | 1,762 sqft carpet (as filed) | Completed |
| Alta MonteCompleted (regulator flag) | B S Nesara | Apartment | 1,133 sqft carpet (as filed) | Completed |
| Century MiraiActive · 11% built | Century Real Estate | Apartment | 742–4,111 sqft | Oct 2030 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 51 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Innovative PalaciaActive · 90% built | SHUBANKARA DEVELOPERS | Apartment | 789–959 sqft carpet (as filed) | Sep 2027 |
| Jeevan PristineCompleted (regulator flag) | M/s. Jeevan Developers | Apartment | – | Completed |
8 of 30 other projects in Marathahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vaishnavi Harmony in the interactive atlas
Transfer of the land
Title deed executed
Sy 22/2, K.R.Puram hobli
Title deed filed with K-RERA, pp. 1, 30 · See it in Documents
Approval or registration
Land use converted
BBMP · Survey 22/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 22/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0014/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/270325/007631
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 13 Mar 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 9 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch, 9 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 22/2 | |
|---|---|---|
| Land extent, Sy 22/2 | 21 (unit not stated) | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,124 sq m | |
| Khata | A Khatha · BBMP · 1 May 2024 | |
| Building plan (BBMP) | Sanctioned 1 May 2024 · No. BBMP/Addl.Dir/JDNORTH/0014/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 22 Sep 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 1 Dec 2027 |
| Land conversion | Converted 1 May 2024 · BBMP | |
|---|---|---|
| Survey numbers | 22/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3 96.6%2 · avg 85 m² 3.4%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2 | 38 | 34,563 |
| 3 | 1,090 | 11 |
| Sold, Q2 2026-27 | 22 / 48 | |
|---|---|---|
| Unsold, Q2 2026-27 | 26 | |
| Months to sell, derived from filed bookings | 29 months |
| Adarsh Parkland | about 3 km | Locked | |
|---|---|---|---|
| SOBHA Neopolis | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | Locked | |
| Vaishnavi Harmony This project | This project is the point the others are measured from | 1 Dec 2027 | 46% (22 of 48) | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | about 3 km | Not on the filing | Not filed | Locked |
| SOBHA Neopolis | about 3.5 km | 31 Dec 2028 | 95% (570 of 600) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Munnekolalu | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Monnekolala | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity | |
|---|---|---|
| Electricity, built | 70% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (53 covered spaces for 48 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 31 May 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 65% · planned by 31 May 2024 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 95% | |
| Completion, accountant | 94.3% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 29 Jul 2024 | |
| RERA completion date | 1 Dec 2027 | |
| Work began, as filed | 1 Feb 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.99 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 5 Feb 2025 | |
| Engineer's certificate, registration | Dated 5 Feb 2025 | |
| Chartered accountant's certificate, registration | Dated 5 Feb 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.50 Cr 26.6%Development · ₹17.95 Cr 73.4%
| Estimated cost | ₹24.44 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹24.44 Cr | |
| Estimated cost, engineer's certificate | ₹16.54 Cr | |
| Cost incurred | ₹23.04 Cr (94.3% of the estimate) | |
| Cost left | ₹1.41 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹9.85 Cr | |
| Land cost revision | Not verified yet | |
Sold (22) 45.8%Unsold (26) 54.2%
| Sold, Q3 2025-26 | 14 / 48 · 34 available | |
|---|---|---|
| Sold, Q4 2025-26 | 19 / 48 · 29 available | |
| Sold, Q1 2026-27 | 22 / 48 · 26 available | |
| Sold, Q2 2026-27 | 22 / 48 · 26 available | |
| Unsold, Q2 2026-27 | 26 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · Old Madras Road | |
|---|---|---|
| Designated account, collected | ₹1.91 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.34 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 2 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 13 Mar 2025 | |
| Building plan (BBMP) | Sanctioned 1 May 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Old Madras Road | |

| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 |
|---|
| about 3.5 km |
| Locked |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 3.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 3.5 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 3.5 km | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3.5 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 |
|---|
| about 3.5 km |
| 31 Dec 2030 |
| 98% (220 of 225) |
| Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3.5 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3.5 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
|---|
| Projects within 4 km, counted | 55 (55 with an approximate location) | |
|---|---|---|
| Flats in them | 14,083 | |
| Booked | 8,182 of 14,083 (58%) | |
| Unsold | 5,901 | |
| Booked a month, pooled | 201 flats | |
| Months to sell, pooled | 29 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 0.5 km, Marathahalli | |
| Kempegowda Airport | 26.5 |
| MG Road (CBD) | 11.5 |
| Manyata Tech Park | 13 |
| ITPL, Whitefield | 4.5 |
| Ecospace, Bellandur ORR | 5 |
| Electronic City Ph 1 | 14 |
| Landfill or waste transfer station | about 1 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Kadabeesanahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |