| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 68 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vaswani Starlight in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 2 Apr 2024 · No. BBMP/Addl.Dir/JDNORTH/0082/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/274/2023 · issued 21 Sep 2023 | Clear |
| Environmental clearance | SEIAA 131 CON 2023 · EC identification no. EC23B038KA197940 · issued 25 Sep 2023 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/080923/775299 | |
| Pollution board (CFE) | consent order CTE-344169 · issued 9 Jul 2024 · valid until 24 Sep 2033 | Clear |
| Water and sewerage NOC (BWSSB) | issued 13 Sep 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2029 |
| Land conversion | 8 of 8 parcels converted | |
|---|---|---|
| Sy 81, 82/1(P), 82/3 | Converted 17 Oct 2008 · Special Deputy Commissioner, Bangalore District | |
| Sy 83/1, 83/2 | Converted 27 Dec 2014 · Special Deputy Commissioner, Bangalore District | |
| Sy 83/3, 84/1, 82/2 | Converted 18 Oct 2008 · Special Deputy Commissioner, Bangalore District | |
| Survey numbers | 81 · 82/1(P) · 82/3 · 83/1 · 83/2 · 83/3 · 84/1 · 82/2 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Pattandur agrahara | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Tattandhur Agrahara | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.14 (306 covered spaces for 269 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB, Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 30% · planned by 1 Feb 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Sep 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 39% | |
| Completion, accountant | 53.5% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2029 | |
| RERA completion date | 31 Dec 2029 | |
| Completion date, agreement | 31 Dec 2029 | |
| Work began, as filed | 15 May 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 78 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 113 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/274/2023 · issued 21 Sep 2023 | |
| Environmental clearance | SEIAA 131 CON 2023 · EC identification no. EC23B038KA197940 · issued 25 Sep 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 2 Apr 2024 | |
| Engineer's certificate, registration | Dated 2 Apr 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹55.30 Cr 14.7%Development · ₹320.30 Cr 85.3%
| Estimated cost | ₹375.60 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹270.00 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹431.60 Cr | |
| Cost incurred | ₹230.79 Cr (53.5% of the estimate) | |
| Cost left | ₹200.81 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹114.63 Cr | |
| Land cost revision | Not verified yet | |
Sold (115) 42.8%Unsold (154) 57.2%
| Sold, Q3 2025-26 | 101 / 269 · 168 available | |
|---|---|---|
| Sold, Q4 2025-26 | 105 / 269 · 164 available | |
| Sold, Q1 2026-27 | 108 / 269 · 161 available | |
| Sold, Q2 2026-27 | 115 / 269 · 154 available | |
| Unsold, Q2 2026-27 | 154 | |
| Sold in Q4 2025-26 | 4 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | ICICI Bank · MG Road | |
|---|---|---|
| Designated account, collected | ₹104.82 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹104.82 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 2 Apr 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · MG Road | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1 km, Pattandur Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 24.5 |
| MG Road (CBD) | 15 |
| Manyata Tech Park | 14.5 |
| ITPL, Whitefield | 0.5 |
| Ecospace, Bellandur ORR | 8.5 |
| Electronic City Ph 1 | 17 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named ITPL on OpenStreetMap |