| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 3 | – | Review |
|---|
| Construction & progress | – | 2 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vistar White Pearl in the interactive atlas
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jan 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
Page 1
Page 1 of 7 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 7 pages.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched part of the survey number | 17,280 sq m | |
| The whole survey number on the KGIS map | 32,351 sq m | |
| Land area filed with K-RERA | 2,654 sq m | |
| Village, hobli and taluk on the KGIS map | Muttanalluru, Sarjapura-2 hobli, Anekal taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 2,654 sq m | |
| RERA extensions | Granted · Approved 23 May 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2026 |
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 92% Residential (main), 6% Parks & open space | Review |
|---|---|---|
| Nearest high-tension line | A 66 kV line's corridor covers about 21% of the site (about 3,400 m²) | Review |
| Nearest government-flagged flood location | 7.0 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 380 m to the east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Electricity, built | 65% | |
|---|---|---|
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |

| Main structure | 100% · planned by 31 Mar 2017 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Jan 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 54% | |
| Completion, accountant | 54.2% of the estimated cost spent | |
Builder's schedule runs about 123 months past the promised possession date.
| Possession, agreement | 1 Apr 2015 | |
|---|---|---|
| Schedule end | 30 Jun 2025 | |
| RERA completion date | 31 Mar 2026 | Review |
| Work began, as filed | 20 May 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Concealed copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not verified yet | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026 | |
Land · ₹2.31 Cr 14.2%Development · ₹14.00 Cr 85.8%
| Estimated cost | ₹16.31 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q3 2025-26 | ₹34.62 Cr | |
| Cost incurred | ₹18.75 Cr (54.2% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | ₹6.55 Cr | |
| Receivable, sold flats | ₹11.80 Cr | |
| Land cost revision | Not verified yet | |
Sold (18) 39.1%Unsold (28) 60.9%
| Sold, Q3 2025-26 | 18 / 46 · 28 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 28 |
| Escrow bank | HDFC · J p Nagar | |
|---|---|---|
| Designated account, collected | ₹6.55 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹6.55 Cr in Q3 2025-26 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jan 2025 |
|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | HDFC · J p Nagar |
|---|

Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Self development | |
| Nearest city water main | 5.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 5.4 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 39.2 |
| MG Road (CBD) | 20.0 |
| Manyata Tech Park | 25.1 |
| ITPL, Whitefield | 15.5 |
| Ecospace, Bellandur ORR | 10.3 |
| Electronic City Ph 1 | 5.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.9 km to the north, named Chokkasandra on OpenStreetMap |