Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Balaji Lake View Phase 1Completed (regulator flag) | RAGHURAMI REDDY BONDALA & B RAMA MOHAN REDDY | Plot | ~890–2,050 sqft (estimate: filed carpet plus 25%) | Completed |
| Balaji Lake View Phase 2Completed (regulator flag) | RAGHURAMI REDDY BONDALA & B RAMA MOHAN REDDY | Plot | ~750–1,480 sqft (estimate: filed carpet plus 25%) | Completed |
| Concorde AntaresActive · 70% built | Concorde Group | Apartment | 755–1,417 sqft | Dec 2028 |
| Construction Of 592 Du'sLapsed · completion date passed | Karnataka Slum Development Work | Apartment | 292 sqft carpet (as filed) | Jan 2026 |
| Dhanush EnclaveLapsed · completion date passed | DHANUSH BUILDERS | Apartment | – | May 2018 |
| Durga NandanaLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 57 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SREE DURGA BUILDERS AND DEVELOPERS |
| Apartment |
| 853 sqft carpet (as filed) |
| Sep 2023 |
| Hrs Sai Guru Bliss AvenueActive · 100% built | HRS Sai Guru Developers LLP | Apartment | 858–1,239 sqft carpet (as filed) | Feb 2027 |
| ManidvipaActive · 85% built | D R DEVELOPERS | Plot | ~880–34,850 sqft (estimate: filed carpet plus 25%) | Mar 2027 |
8 of 20 other projects in Vidyaranyapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Amigo Alfresco in the interactive atlas
Transfer of the land
Sale deed
Survey 39/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 38/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER · Survey 38/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER · Survey 39/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 38/3, 39/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 38/3, 39/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0010/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/170326/008531
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 6 Dec 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 38/3, 39/2 | |
|---|---|---|
| Land extent, Sy 38/3 | 1 ACRE 7 GUNTA | |
| Land extent, Sy 39/2 | 0.39 GUNTA | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,753 sq m | |
| Khata | E Khatha · BBMP · 31 May 2025 | |
| Sale deed | Dated 28 Mar 1981, 30 Mar 1984 | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 16 Oct 2025 · No. BBMP/Addl.Dir/JDNORTH/0010/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 144 CON 2024 · EC identification no. EC24C3801KA5967313N · issued 1 Jan 2025 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-346043 · issued 16 Nov 2024 · valid until 12 Nov 2029 | Clear |
| Water and sewerage NOC (BWSSB) | issued 7 Mar 2026 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 38/3 | Converted 15 Dec 2021 · DEPUTY COMMISSIONER | |
| Sy 39/2 | Converted 27 Sep 2024 · DEPUTY COMMISSIONER | |
| Survey numbers | 38/3 · 39/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 125 m² 72.7%2BHK · avg 91 m² 27.3%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 30 | 976 |
| 3BHK | 80 | 1,348 |
| Sold, Q2 2026-27 | 1 / 110 | |
|---|---|---|
| Unsold, Q2 2026-27 | 109 | |
| Months to sell, derived from filed bookings | Too few bookings to project (1 flat booked in 6 months) |
| Rubby Castle 1 | about 2 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 2 km | Locked | |
| Century Kindle Phase 1 | about 3.5 km | Locked | |
| Sri Rama Enclave | about 4.5 km | Locked | |
| Vruksha Greens | about 4.5 km | Locked |
| Amigo Alfresco This project | This project is the point the others are measured from | 31 Dec 2028 | 1% (1 of 110) | Not verified yet |
|---|---|---|---|---|
| Rubby Castle 1 | about 2 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Shriram Solitaire | about 2 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Century Kindle Phase 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3.5 km, Kammagondanahalli near MNTI Polytechnic | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (110 covered spaces for 110 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Groundwater | Not verified yet | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | Not verified yet | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 6.5 km, Dasarahalli | |
| Metro, under construction | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 1 Nov 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Aug 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 15% | |
| Completion, accountant | 7.6% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 25 Jan 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 41 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 144 CON 2024 · EC identification no. EC24C3801KA5967313N · issued 1 Jan 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 24 Jan 2026 · site inspected 23 Jan 2026 | |
| Chartered accountant's certificate, registration | Dated 4 Mar 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹90.27 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹62.84 Cr | |
| Estimated cost, chartered accountant's certificate | ₹90.27 Cr, same as the filing | |
| Estimated cost, Form 4 Q4 2025-26 | ₹62.84 Cr | |
| Cost incurred | ₹4.80 Cr (7.6% of the estimate) | |
| Cost left | ₹58.05 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹0 | |
| Land cost revision | Not verified yet | |
Sold (1) 0.9%Unsold (109) 99.1%
| Sold, Q4 2025-26 | 0 / 110 · 110 available | |
|---|---|---|
| Sold, Q1 2026-27 | 1 / 110 · 109 available | |
| Sold, Q2 2026-27 | 1 / 110 · 109 available | |
| Unsold, Q2 2026-27 | 109 | |
| Sold in Q1 2026-27 | 1 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · HALASURU | |
|---|---|---|
| Designated account, collected | ₹27.4 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Escrow account, Q1 2026-27 | Opened at ₹9,736, ₹99.4 L other deposits | |
| Share of collections deposited in escrow | 5% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Dec 2025 | |
| Building plan (BBMP) | Sanctioned 16 Oct 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · HALASURU | |

| Royal Enclave | about 7 km | Locked |
|---|
| Legacy Salvador | about 7 km | Locked |
|---|
| 4square Park Sierra | about 7 km | Locked |
|---|
| Assetz Miru & Miyo | about 7 km | Locked |
|---|
| Assetz Soho & Sky | about 7.5 km | Locked |
|---|
| Godrej Aveline | about 8 km | Locked |
|---|
| Cumins Sanctum | about 8 km | Locked |
|---|
| about 3.5 km |
| 14 Mar 2031 |
| 73% (336 of 458) |
| Locked |
| Sri Rama Enclave | about 4.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Vruksha Greens | about 4.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
|---|
| Royal Enclave | about 7 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
|---|
| Projects within 4 km, counted | 18 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 4,217 | |
| Booked | 2,777 of 4,217 (66%) | |
| Unsold | 1,440 | |
| Booked a month, pooled | 63 flats | |
| Months to sell, pooled | 23 months |
| Kempegowda Airport | 21.5 |
| MG Road (CBD) | 15 |
| Manyata Tech Park | 10.5 |
| ITPL, Whitefield | 25 |
| Ecospace, Bellandur ORR | 24.5 |
| Electronic City Ph 1 | 32.5 |
| Landfill or waste transfer station | about 2 km, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 3 km to the south-west, named Chikkabanavara 5MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1 km, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Doddabettahalli 66kV Substation on OpenStreetMap |