| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Amigo AlfrescoActive · 15% built | AMIGO SHELTERS PVT LTD | Apartment | 975–1,348 sqft carpet (as filed) | Dec 2028 |
| Balaji Lake View Phase 1Completed (regulator flag) | RAGHURAMI REDDY BONDALA & B RAMA MOHAN REDDY | Plot | ~890–2,050 sqft (estimate: filed carpet plus 25%) | Completed |
| Balaji Lake View Phase 2Completed (regulator flag) | RAGHURAMI REDDY BONDALA & B RAMA MOHAN REDDY | Plot | ~750–1,480 sqft (estimate: filed carpet plus 25%) | Completed |
| Concorde AntaresActive · 70% built | Concorde Group | Apartment | 755–1,417 sqft | Dec 2028 |
| Construction Of 592 Du'sLapsed · completion date passed | Karnataka Slum Development Work | Apartment | 292 sqft carpet (as filed) | Jan 2026 |
| Dhanush EnclaveLapsed · completion date passed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 34 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 6 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 6 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 3 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| DHANUSH BUILDERS |
| Apartment |
| – |
| May 2018 |
| Durga NandanaLapsed · completion date passed | SREE DURGA BUILDERS AND DEVELOPERS | Apartment | 853 sqft carpet (as filed) | Sep 2023 |
| Hrs Sai Guru Bliss AvenueActive · 100% built | HRS Sai Guru Developers LLP | Apartment | 858–1,239 sqft carpet (as filed) | Feb 2027 |
8 of 20 other projects in Vidyaranyapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Manidvipa in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BDA) | Sanctioned 29 Mar 2025 · No. BDA/TPM/PRL-57/23-24/3577/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2027 |
| Land conversion | 10 of 10 parcels converted | |
|---|---|---|
| Sy 50/1, 55/1, 56/1, 56/2, 58, 59/2,… | Converted 12 Apr 2024 · DC Office, Bangalore | |
| Sy 53/1, 53/4 | Converted 29 May 2024 · DC Office, Bangalore | |
| Sy 53/3 | Converted 29 May 2025 · DC Office, Bangalore | |
| Survey numbers | 50/1 · 53/1 · 53/3 · 53/4 · 55/1 · 56/1 · 56/2 · 58 · 59/2 · 59/1 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Shriram Solitaire | about 4 km | Locked | |
|---|---|---|---|
| Century Kindle Phase 1 | 4.5 km | Locked | |
| Assetz Miru & Miyo | about 5 km | Locked | |
| Rubby Castle 1 | about 5 km | Locked | |
| Vruksha Greens | 6.8 km | Locked |
| Manidvipa This project | This project is the point the others are measured from | 31 Mar 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Shriram Solitaire | about 4 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Century Kindle Phase 1 | 4.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | A 66 kV line passes 50 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 4.9 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 500 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 40 m to the south-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
As the promoter reported it

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 85% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2027 | |
| Work began, as filed | 1 Apr 2025 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 17 Dec 2025 | |
| Chartered accountant, Form 4 | Dated 4 Apr 2026 | |
Land · ₹30.48 Cr 53.7%Development · ₹26.25 Cr 46.3%
| Estimated cost | ₹56.73 Cr | |
|---|---|---|
| Estimated cost, chartered accountant's certificate | ₹56.73 Cr, same as the filing | |
| Estimated cost, Form 4 Q4 2025-26 | ₹26.25 Cr | |
| Cost incurred | ₹18.56 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · Mathikere Branch | |
|---|---|---|
| Designated account, collected | ₹7.36 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹3.93 Cr in Q1 2026-27 (53% of that quarter's deposits) | |
| Escrow account to date, Q4 2025-26 | ₹1.04 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Private lender (individual) · ₹8.97 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 29 Mar 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Mathikere Branch | |

| Sri Rama Enclave | about 7.5 km | Locked |
|---|
| Legacy Salvador | about 8.5 km | Locked |
|---|
| 4square Park Sierra | 8.7 km | Locked |
|---|
| Godrej Aveline | 8.8 km | Locked |
|---|
| Riviera Glade | about 9 km | Locked |
|---|
| Royal Enclave | about 10 km | Locked |
|---|
| Assetz Soho & Sky | 10.1 km | Locked |
|---|
| Assetz Miru & Miyo |
|---|
| about 5 km |
| 31 Mar 2031 |
| 6% (20 of 350) |
| Locked |
| Rubby Castle 1 | about 5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
|---|
| Vruksha Greens | 6.8 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
|---|
| Sri Rama Enclave | about 7.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Projects within 4 km, counted | 5 (4 with an approximate location) | |
|---|---|---|
| Flats in them | 1,376 | |
| Booked | 829 of 1,376 (60%) | |
| Unsold | 547 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 91 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Shivakote Grama Panchayath) | |
| Nearest city water main | 4.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 500 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 8.3 km, Yelahanka | |
| Kempegowda Airport | 21.1 |
| MG Road (CBD) | 18.3 |
| Manyata Tech Park | 13.3 |
| ITPL, Whitefield | 27.4 |
| Ecospace, Bellandur ORR | 27.6 |
| Electronic City Ph 1 | 35.6 |
| Landfill or waste transfer station | 960 m to the east, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | 2.2 km to the south, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 1.9 km to the south, named Bylakere 66kV Substation on OpenStreetMap |