Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 3 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 47 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 3 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| – |
| Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aratt Alchemy One in the interactive atlas
Approval or registration
Khata issued
E Khatha · VILLAGE PANCHAYATI · Survey 36/1, 37/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER · Survey 36/1, 37/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of ARATT TRIDENT PROJECTS LLP · Survey 36/1, 37/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan U/09/2021-2022
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/130122/004638
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Feb 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 36/1 and 37/1 | |
|---|---|---|
| Land extent, Sy 36/1 and 37/1 | 5,564 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,564 sq m | |
| Khata | E Khatha · VILLAGE PANCHAYATI · 11 Dec 2014 | |
| Sale deed | Dated 17 Sep 2021 | |
| Sale deed in favour of | ARATT TRIDENT PROJECTS LLP | |
| Building plan (BDA) | Sanctioned 8 Oct 2021 · No. U/09/2021-2022 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/086/2021 · issued 9 Jun 2021 · building height 76.3 m | Clear |
| Environmental clearance | SEIAA 07 CON 2021 · issued 3 Aug 2021 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order AW-352588 · issued 31 Jan 2026 | |
| Water supply NOC | Filed with the registration |
| RERA extensions | Granted · Approved 20 Feb 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2026 |
| Land conversion | Converted 20 Nov 2020 · DEPUTY COMMISSIONER | |
|---|---|---|
| Survey numbers | 36/1 and 37/1 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 92 m² 49.4%2BHK · avg 61 m² 48.1%4BHK · avg 275 m² 2.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 78 | 653 |
| 3BHK | 80 | 986 |
| 4BHK | 4 | 2,963 |
| Sold, Q1 2026-27 | 168 / 174 | |
|---|---|---|
| Unsold, Q1 2026-27 | 6 | |
| Months to sell, derived from filed bookings | Too few bookings to project (4 flats booked in 6 months) |
| Legacy Saviero | about 3 km | Locked | |
|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked | |
| 2g Tula | about 4.5 km | Locked | |
| Garuda Grand | about 5 km | Locked | |
| Vkk Grand | about 5 km | Locked |
| Aratt Alchemy One This project | This project is the point the others are measured from | 30 Jun 2026 | 97% (168 of 174) | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 3 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, RR layout & Ambedkar Nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kaveri Water Tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 93% | |
| Electricity, built | 93% | |
| Outdoor Sports facility, built | 93% | |
| Swimming Pool, built | 93% | |
| Parks, built | 90% | |
| Water and Sanitation, built | 90% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.81 (131 covered spaces for 162 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (PANCHAYAT) | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 95% · planned by 30 Apr 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 93% · planned by 31 Aug 2025 | |
| Internal roads | Not verified yet | |
| Club house | 93% | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Oct 2025 | |
| RERA completion date | 30 Jun 2026 | |
| Work began, as filed | 1 Nov 2021 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 76.3 m on the fire NOC | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jun 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/086/2021 · issued 9 Jun 2021 · building height 76.3 m | |
| Environmental clearance | SEIAA 07 CON 2021 · issued 3 Aug 2021 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jun 2026 (3 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹11.75 Cr 13.7%Development · ₹73.81 Cr 86.3%
| Estimated cost | ₹85.56 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | ₹8.16 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (168) 96.6%Unsold (6) 3.4%
| Sold, Q3 2025-26 | 164 / 174 · 10 available | |
|---|---|---|
| Sold, Q4 2025-26 | 165 / 174 · 9 available | |
| Sold, Q1 2026-27 | 168 / 174 · 6 available | |
| Unsold, Q1 2026-27 | 6 | |
| Sold in Q4 2025-26 | 1 | |
| Sold in Q1 2026-27 | 3 | |
| Flats booked, Form 4 Q1 2026-27 | 168 |
| Escrow bank | KOTAK MAHINDRA BANK · MG ROAD | |
|---|---|---|
| Designated account, collected | ₹2.91 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹2.91 Cr in Q1 2026-27 (100% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹7,91,05,026 | |
| Amount withdrawable, Form 4 | ₹84,70,44,000 | |
| Share of collections deposited in escrow | 100% | |
| Sale proceeds realised, Q3 2025-26 | ₹7,91,05,026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 3 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Feb 2026 | |
| Building plan (BDA) | Sanctioned 8 Oct 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · MG ROAD | |

| Century Regalia (Project 2) | about 6 km | Locked |
|---|
| Ranka Iris | about 6 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 6.5 km | Locked |
|---|
| Vaswani Starlight | about 7 km | Locked |
|---|
| Coevolve Misty Shores | about 7 km | Locked |
|---|
| Nava Skanda Bellavita | about 7.5 km | Locked |
|---|
| Axis Ekatva | about 7.5 km | Locked |
|---|
| about 4.5 km |
| 27 Dec 2027 |
| 68% (173 of 256) |
| Locked |
| Garuda Grand | about 5 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
|---|
| Vkk Grand | about 5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Century Regalia (Project 2) | about 6 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Projects within 4 km, counted | 12 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 1,407 | |
| Booked | 721 of 1,407 (51%) | |
| Unsold | 686 | |
| Booked a month, pooled | 7 flats | |
| Months to sell, pooled | 92 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 0.5 km, KR Puram | |
| Kempegowda Airport | 39 | 22.5 |
| MG Road (CBD) | 10.5 | 8.5 |
| Manyata Tech Park | 10 | 8 |
| ITPL, Whitefield | 8.5 | 7 |
| Ecospace, Bellandur ORR | 11 | 8.5 |
| Electronic City Ph 1 | 25 | 18 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | about 1.5 km | |
| Crematorium | about 2.5 km to the south | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named ITI on OpenStreetMap |