Overview
DNR Parklink Phase 2
Part ofDNR Parklink2 phases, 784 flats
Overview
Part ofDNR Parklink2 phases, 784 flats
Overview
Part ofDNR Parklink2 phases, 784 flats

Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 2 filed survey numbers matched, 1 could not be read. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | – | – | – |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 172 projects in Hennur Road → · Dnr Corporation PVT LTD's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open DNR Parklink Phase 2 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 31 Mar 2023 · No. BDA/NAMA/ASA/AA-2/THA SA-3/U/23/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/348/2022 · issued 10 Nov 2022 · building height 71.05 m (Tower C, Tower D), 31.4 m (Tower E) | Clear |
| Environmental clearance | SEIAA 132 CON 2022 · EC identification no. EC23B000KA110726 · issued 3 Jan 2023 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/060222/675393 | |
| Pollution board (CFE) | consent order CTE-337120 · issued 28 Mar 2023 · valid until 2 Jan 2033 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 May 2029 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 1/129/130 | Converted 29 May 2019 · Special Deputy Commissioner | |
| Sy 103/1, 103/2, 103/3 | Converted 5 Mar 2021 · DEPUTY COMMISSIONER BENGALURU | |
| Survey numbers | 1/129/130 · 103/1, 103/2, 103/3 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
3BHK(type2) · 106 m² 30.8%3BHK(type1) · 115 m² 21.5%1BHK · 40 m² 16.8%2BHK(type1) · 86 m² 10.7%2 other types 20.1%
| 1BHK | 72 | 431 |
| 2.5BHK with study | 40 | 1,044 |
| 2BHK (type2) | 46 | 904 |
| 2BHK(type1) | 46 | 926 |
| 3BHK(type1) | 92 | 1,238 |
| 3BHK(type2) | 132 | 1,141 |
| Sold, Q2 2026-27 | 296 / 428 | |
|---|---|---|
| Unsold, Q2 2026-27 | 132 | |
| Months to sell, derived from filed bookings | 21 months |
| Radiance Floresta | about 1 km | Locked | |
|---|---|---|---|
| Adarsh Pinecourt | about 1 km | Locked | |
| Sattva La Vita | about 1 km | Locked | |
| The Pearl Paradise | about 1.5 km | Locked | |
| Nava Skanda Bellavita | about 2 km | Locked |
| DNR Parklink Phase 2 This project | This project is the point the others are measured from | 31 May 2029 | 69% (296 of 428) | Not verified yet |
|---|---|---|---|---|
| Radiance Floresta | about 1 km | 31 May 2028 | 100% (65 of 65) | Locked |
| Adarsh Pinecourt | about 1 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
| Sattva La Vita |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3.5 km, Telecom layout, Ashwathnagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.07 (460 covered spaces for 428 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
As the promoter reported it

| Main structure | 1% · planned by 15 Jul 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Dec 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 58% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 May 2029 | |
| RERA completion date | 31 May 2029 | |
| Work began, as filed | 6 Sep 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 71.05 m (Tower C, Tower D), 31.4 m (Tower E) on the fire NOC · filed: C 73 m, D 73 m, E 37 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/348/2022 · issued 10 Nov 2022 · building height 71.05 m (Tower C, Tower D), 31.4 m (Tower E) | |
| Environmental clearance | SEIAA 132 CON 2022 · EC identification no. EC23B000KA110726 · issued 3 Jan 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 12 Sep 2023 · site inspected 12 Sep 2023 | |
| Engineer's certificate, registration | Dated 18 May 2023 | |
| Chartered accountant's certificate, registration | Dated 3 Nov 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹37.26 Cr 15.7%Development · ₹200.75 Cr 84.3%
| Estimated cost | ₹238.01 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹156.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | ₹128.21 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (296) 69.2%Unsold (132) 30.8%
| Sold, Q3 2025-26 | 239 / 428 · 189 available | |
|---|---|---|
| Sold, Q4 2025-26 | 263 / 428 · 165 available | |
| Sold, Q1 2026-27 | 273 / 428 · 155 available | |
| Sold, Q2 2026-27 | 296 / 428 · 132 available | |
| Unsold, Q2 2026-27 | 132 | |
| Sold in Q4 2025-26 | 24 | |
| Sold in Q1 2026-27 | 10 | |
| Sold in Q2 2026-27 | 23 |
| Escrow bank | ICICI Bank · MG ROAD | |
|---|---|---|
| Designated account, collected | ₹76.09 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹45.19 Cr in Q2 2026-27 (59% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹90,15,000 | |
| Escrow account, Q4 2025-26 | Opened at ₹3.64 Cr, ₹11.98 Cr deposited from sales, ₹15.62 Cr withdrawn | |
| Escrow account to date, Q3 2025-26 | ₹113.18 Cr deposited from sales, ₹109.53 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 31 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · MG ROAD | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha City Athena | about 2 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 2.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 3 km | Locked |
|---|
| Sumadhura Solea | about 3.5 km | Locked |
|---|
| about 1 km |
| 12 Jul 2026 |
| 32% (20 of 63) |
| Locked |
| The Pearl Paradise | about 1.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Nava Skanda Bellavita | about 2 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Sobha City Athena | about 2 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
|---|
| Projects within 4 km, counted | 59 (59 with an approximate location) | |
|---|---|---|
| Flats in them | 14,303 | |
| Booked | 8,467 of 14,303 (59%) | |
| Unsold | 5,836 | |
| Booked a month, pooled | 240 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (KANNUR GRAMA PANCHAYATHI) | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5.5 km, Nagawara | |
| Kempegowda Airport | 14.5 |
| MG Road (CBD) | 13 |
| Manyata Tech Park | 5.5 |
| ITPL, Whitefield | 14 |
| Ecospace, Bellandur ORR | 17.5 |
| Electronic City Ph 1 | 27 |
| Landfill or waste transfer station | about 2.5 km to the north | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km to the south-east |