| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 27 SummitLapsed · completion date passed | Nestled Haven Developers LLP | Apartment | 3,697–3,799 sqft carpet (as filed) | Nov 2025 |
| 32 RichmondCompleted (regulator flag) | EDGAR BRITTO | Apartment | 574–1,378 sqft carpet (as filed) | Completed |
| Blar 21Active · 4% built | BLIAR SURYA LLP | Apartment | 1,787–2,791 sqft carpet (as filed) | Feb 2032 |
| Cascadia By Tvs EmeraldActive · 27% built | M/s. Emerald Haven Realty Limited | Apartment | 1,473–3,584 sqft carpet (as filed) | Aug 2030 |
| Century RenataCompleted (regulator flag) | Century Real Estate | Apartment | 2,760–5,335 sqft | Completed |
| Chowriappa InfinityLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 7 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| EllenLapsed · completion date passed | Ubernest Developers LLP | Apartment | – | Sep 2022 |
| Grandus Quiet WoodsCompleted · OC 23-05-2023 | Grandus Infra Projects Pvt Ltd | Apartment | 1,507 sqft carpet (as filed) | Completed |
8 of 20 other projects in Richmond Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Gm Palazzo in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹36.00 Cr
Title deed filed with K-RERA, pp. 1, 13 · See it in Documents
Transfer of the land
Sale deed
Survey 3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.com/EST/1277/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/160623/005991
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 3 Mar 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | New Municipal NO.3, PID NO.76- | |
|---|---|---|
| Land extent, Sy New Municipal NO.3, PID NO.76- | 1,589 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,543 sq m | |
| Khata | E Khatha · BBMP · 20 Jan 2023 | |
| Sale deed | Dated 13 Aug 2018 | |
| Building plan (BBMP) | Sanctioned 9 Feb 2023 · No. BBMP/Ad.com/EST/1277/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 12 Mar 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | New Municipal NO.3, PID NO.76- |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 153 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 14 | 1,648 |
| Vista Svara | about 2 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 3.5 km | Locked | |
| Century Regalia (Project 2) | about 4.5 km | Locked | |
| Aydin Infra Signature 3 | about 6 km | Locked | |
| Vista Padmalaya | about 6 km | Locked |
| Gm Palazzo This project | This project is the point the others are measured from | 12 Mar 2028 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vista Svara | about 2 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Ranka Iris | about 3.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Century Regalia (Project 2) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Ashok Nagar , museum road | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.57 (22 covered spaces for 14 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | 12 Mar 2028 | |
|---|---|---|
| Schedule end | 26 Dec 2027 | |
| RERA completion date | 12 Mar 2028 | |
| Work began, as filed | 13 Feb 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 13.2 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 2 Mar 2023 · site inspected 1 Mar 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹30.84 Cr 63.6%Development · ₹17.66 Cr 36.4%
| Estimated cost | ₹48.50 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹48.50 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Bank of Maharashtra · Shivaji Nagar | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 3 Mar 2023 | Review |
| Building plan (BBMP) | Sanctioned 9 Feb 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Bank of Maharashtra · Shivaji Nagar | |
| Magnolia Delight | about 6 km | Locked |
|---|
| Renaissance Srichakra | about 6 km | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 6.5 km | Locked |
|---|
| Adarsh Premia | about 7 km | Locked |
|---|
| Pacific Legacy | about 7.5 km | Locked |
|---|
| Birla Tisya | about 7.5 km | Locked |
|---|
| Song Of Wind | about 9 km | Locked |
|---|
| about 4.5 km |
| 28 Feb 2030 |
| 63% (80 of 128) |
| Locked |
| Aydin Infra Signature 3 | about 6 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
|---|
| Vista Padmalaya | about 6 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Magnolia Delight | about 6 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 486 | |
| Booked | 229 of 486 (47%) | |
| Unsold | 257 | |
| Booked a month, pooled | 4 flats | |
| Months to sell, pooled | 66 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 0.5 km, Rashtriya Military School | |
| Kempegowda Airport | 34.5 | 28 |
| MG Road (CBD) | 1.5 | 1 |
| Manyata Tech Park | 10.5 | 9 |
| ITPL, Whitefield | 17.5 | 14.5 |
| Ecospace, Bellandur ORR | 13.5 | 9.5 |
| Electronic City Ph 1 | 18 | 16.5 |
| Landfill or waste transfer station | about 1 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Cubbon Park 4MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named East Division Compound on OpenStreetMap |