Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Macasa Emerald in the interactive atlas
Approval or registration
Land use converted
DC - Revenue · Survey 33/2, 33/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PANCHYAT · Survey 33/2, 33/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DC - REVENUE · Survey 33/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PANCHAYAT · Survey 33/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/COM/03/29/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/101122/005450
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 33/2 & 33/3, 33/1 | |
|---|---|---|
| Land extent, Sy 33/2 & 33/3 | 1 Acre, 39 Gunta | |
| Land extent, Sy 33/1 | 4 GUNTA | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,812 sq m | |
| Khata | E Khatha · PANCHYAT · 21 Oct 2021; E Khatha · PANCHAYAT · 5 Oct 2022 | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 17 Oct 2022 · No. BDA/COM/03/29/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/249/2021 · issued 30 Dec 2021 · building height 39.15 m | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | NOC ID HOSU/SOUTH/B/120321/638565 · issued 27 Dec 2021 · valid until 26 Dec 2029 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 33/2 & 33/3 | Converted 16 Sep 2021 · DC - Revenue | |
| Sy 33/1 | Converted 27 Jul 2022 · DC - REVENUE | |
| Survey numbers | 33/2 & 33/3 · 33/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2.5BHK · avg 66 m² 55.9%2BHK · avg 65 m² 44.1%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 89 | 703 |
| 2.5BHK | 113 | 710 |
| Sold, Q2 2026-27 | 123 / 202 | |
|---|---|---|
| Unsold, Q2 2026-27 | 79 |
| Haven Phase 2 | about 1 km | Locked | |
|---|---|---|---|
| 63 Degree East - Tower E | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | Locked |
| Macasa Emerald This project | This project is the point the others are measured from | 31 Dec 2026 | 61% (123 of 202) | Not verified yet |
|---|---|---|---|---|
| Haven Phase 2 | about 1 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
| 63 Degree East - Tower E | about 1 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 95% | |
| Electricity, built | 99% | |
| Parks, built | 99% | |
| Water and Sanitation, built | 95% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.08 (218 covered spaces for 202 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (HALANAYAKANHALLI PANCHYAT) | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 24 Jun 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 97% · planned by 30 Apr 2026 | |
| Internal roads | Not verified yet | |
| Club house | 95% | |
| Completion | 99% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 1 Nov 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 24 Oct 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 39.15 m on the fire NOC · filed: Tower - 1 39.15 m, Tower - 2 42.15 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 18.5 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jun 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/249/2021 · issued 30 Dec 2021 · building height 39.15 m | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Jun 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 20 Oct 2022 · site inspected 10 Oct 2022 | |
| Engineer's certificate, registration | Dated 20 Oct 2022 | |
| Chartered accountant, Form 4 | Dated 10 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.50 Cr 3.8%Development · ₹63.62 Cr 96.2%
| Estimated cost | ₹66.12 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹50.00 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹71.13 Cr | |
| Cost incurred | ₹70.51 Cr | |
| Cost left | ₹62.1 L | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹2.09 Cr | |
| Land cost revision | Not verified yet | |
Sold (123) 60.9%Unsold (79) 39.1%
| Sold, Q3 2025-26 | 123 / 202 · 79 available | |
|---|---|---|
| Sold, Q4 2025-26 | 123 / 202 · 79 available | |
| Sold, Q1 2026-27 | 123 / 202 · 79 available | |
| Sold, Q2 2026-27 | 123 / 202 · 79 available | |
| Unsold, Q2 2026-27 | 79 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 123 |
| Escrow bank | KOTAK MAHINDRA BANK · Bellanduru | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹70,51,11,690 | |
| Net amount withdrawable, Form 4 | ₹2,30,02,949 | |
| Withdrawn from the escrow account to date | ₹68,21,08,741 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q1 2026-27 | ₹47,62,994 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 8 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 17 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Bellanduru | |

| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | Locked |
|---|
| Birla Evara | about 1.5 km | Locked |
|---|
| Mana Jardin Neo | about 1.5 km | Locked |
|---|
| Satori Residence By Genurise | about 2 km | Locked |
|---|
| Assetz Muse & Maison | about 2.5 km | Locked |
|---|
| Orion Heights | about 2.5 km | Locked |
|---|
| Assetz Ren & Rei | about 2.5 km | Locked |
|---|
| Adarsh Rosewood | about 3 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 |
|---|
| about 1 km |
| 30 Jun 2026 |
| 100% (113 of 113) |
| Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Birla Evara | about 1.5 km | 25 Dec 2031 | 66% (1,060 of 1,594) | Locked |
|---|
| Projects within 4 km, counted | 75 (75 with an approximate location) | |
|---|---|---|
| Flats in them | 21,022 | |
| Booked | 11,813 of 21,022 (56%) | |
| Unsold | 9,209 | |
| Booked a month, pooled | 274 flats | |
| Months to sell, pooled | 32 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 4.5 km, Bellandur | |
| Kempegowda Airport | 34.5 |
| MG Road (CBD) | 14 |
| Manyata Tech Park | 19 |
| ITPL, Whitefield | 11.5 |
| Ecospace, Bellandur ORR | 4.5 |
| Electronic City Ph 1 | 6 |
| Landfill or waste transfer station | about 2 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |