Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 54 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Navakruthi Garden Bay in the interactive atlas
Transfer of the land
Sale deed
Survey 5/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER · Survey 5/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · PURASABHE, CHANDAPURA · Survey 5/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan APA/CC/602/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/211024/007159
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 31 Aug 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5/2 | |
|---|---|---|
| Land extent, Sy 5/2 | 1 ACRE 19 GUNTAS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,868 sq m | |
| Khata | A Khatha · PURASABHE, CHANDAPURA · 16 Feb 2023 | |
| Sale deed | Dated 10 May 1995 | |
| Building plan (Local Planning Authority) | Sanctioned 27 Feb 2023 · No. APA/CC/602/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 16 Dec 2004 · DEPUTY COMMISSIONER | |
|---|---|---|
| Survey numbers | 5/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 88 m² 16.7%3BHK · avg 94 m² 16.7%3BHK · avg 98 m² 16.7%2BHK 8.3%5 other types 41.7%
| 2BHK | 8 | 5,694 |
| 2BHK | 8 | 5,759 |
| 2BHK | 8 | 6,092 |
| 3BHK | 16 | 15,166 |
| 3BHK | 16 | 16,210 |
| 3BHK | 16 | 16,835 |
| 3BHK | 8 | 7,911 |
| 3BHK | 8 | 8,094 |
| 3BHK | 8 | 8,633 |
| Sold, Q2 2026-27 | 29 / 96 | |
|---|---|---|
| Unsold, Q2 2026-27 | 67 | |
| Months to sell, derived from filed bookings | Too few bookings to project (4 flats booked in 9 months) |
| Sowmya Skyla | about 1 km | Locked | |
|---|---|---|---|
| Shriram Sapphire (Codename Ultimate) | about 1 km | Locked | |
| Vasuki Vallabha | about 2 km | Locked | |
| Vistar White Pearl | about 3.5 km | Locked | |
| Mahidhara Harmony | about 3.5 km |
| Navakruthi Garden Bay This project | This project is the point the others are measured from | 31 Dec 2028 | 30% (29 of 96) | Not verified yet |
|---|---|---|---|---|
| Sowmya Skyla | about 1 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
| Shriram Sapphire (Codename Ultimate) | about 1 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6.5 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Water and Sanitation | |
|---|---|---|
| Electricity, built | 35% | |
| Community Hall, built | 78% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.21 (116 covered spaces for 96 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (PANCHAYATH) | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 85% · planned by 30 Oct 2025 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 23 Oct 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 75% | |
| Completion, accountant | Not verified yet | |
Builder's schedule runs about 7 months past the promised possession date.
| Possession, agreement | 31 May 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 12 Aug 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: BLOCK A 14.95 m, BLOCK B 14.9 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 22 Jul 2024 | |
| Chartered accountant's certificate, registration | Dated 19 Jul 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹8.60 Cr 15.6%Development · ₹46.50 Cr 84.4%
| Estimated cost | ₹55.11 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹36.76 Cr | |
| Cost incurred | ₹31.00 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹2.58 Cr | |
| Land cost revision | Not verified yet | |
Sold (29) 30.2%Unsold (67) 69.8%
| Sold, Q3 2025-26 | 25 / 96 · 71 available | |
|---|---|---|
| Sold, Q4 2025-26 | 25 / 96 · 71 available | |
| Sold, Q1 2026-27 | 26 / 96 · 70 available | |
| Sold, Q2 2026-27 | 29 / 96 · 67 available | |
| Unsold, Q2 2026-27 | 67 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 1 | |
| Sold in Q2 2026-27 | 3 |
| Escrow bank | STATE BANK OF INDIA · HEALTH CITY BRANCH | |
|---|---|---|
| Designated account, collected | ₹1.51 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.51 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 31 Aug 2024 | Review |
| Building plan | Sanctioned 27 Feb 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · HEALTH CITY BRANCH | |

| Locked |
| Abhee Serenity Springs | about 4 km | Locked |
|---|
| Assetz Ren & Rei | about 4 km | Locked |
|---|
| Acorn Hive | about 4 km | Locked |
|---|
| Assetz Muse & Maison | about 4 km | Locked |
|---|
| Ramky One Karnival | about 4.5 km | Locked |
|---|
| Signature Heights | about 4.5 km | Locked |
|---|
| Birla Evara | about 5.5 km | Locked |
|---|
| Vasuki Vallabha |
|---|
| about 2 km |
| 31 Dec 2027 |
| 31% (10 of 32) |
| Locked |
| Vistar White Pearl | about 3.5 km | 31 Mar 2026 | 39% (18 of 46) | Locked |
|---|
| Mahidhara Harmony | about 3.5 km | 10 Sep 2026 | 62% (91 of 146) | Locked |
|---|
| Abhee Serenity Springs | about 4 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
|---|
| Projects within 4 km, counted | 29 (29 with an approximate location) | |
|---|---|---|
| Flats in them | 13,750 | |
| Booked | 3,936 of 13,750 (29%) | |
| Unsold | 9,814 | |
| Booked a month, pooled | 88 flats | |
| Months to sell, pooled | 112 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 2 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 41 |
| MG Road (CBD) | 19.5 |
| Manyata Tech Park | 25.5 |
| ITPL, Whitefield | 17.5 |
| Ecospace, Bellandur ORR | 11 |
| Electronic City Ph 1 | 3 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the west |