Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 5 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open New Warrior Tower in the interactive atlas
Approval or registration
Land use converted
DC · Survey 122/8
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bruhat Bangalore mahanagar Palike · Survey 122/8
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/5958/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/160523/005937
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 2 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 122/8 | |
|---|---|---|
| Land extent, Sy 122/8 | 2,018 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,018 sq m | |
| Khata | A Khatha · Bruhat Bangalore mahanagar Palike · 18 Jun 2022 | |
| Building plan (BBMP) | Sanctioned 21 Dec 2022 · No. PRJ/5958/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 10 Apr 2023 |
| RERA extensions | Applied for · Applied 24 Oct 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 20 Oct 2025 |
| Land conversion | Converted 7 May 2022 · DC | |
|---|---|---|
| Survey numbers | 122/8 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 71 m² 69.2%3BHK · avg 78 m² 30.8%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 36 | 759 |
| 3BHK | 16 | 838 |
| Godrej Aveline | about 1 km | Locked | |
|---|---|---|---|
| Tnm Lakeview | about 1 km | Locked | |
| Legacy Salvador | about 2 km | Locked | |
| Assetz Zen & Sato | about 2.5 km | Locked | |
| 4square Park Sierra | about 2.5 km | Locked |
| New Warrior Tower This project | This project is the point the others are measured from | 20 Oct 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Godrej Aveline | about 1 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
| Tnm Lakeview | about 1 km | 31 Oct 2026 | 100% (36 of 36) | Locked |
| Legacy Salvador |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kathegenhalli Talanahalli | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.12 (58 covered spaces for 52 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 20 Oct 2025 | |
| RERA completion date | 20 Oct 2025 | Red flag |
| Work began, as filed | 1 Mar 2023 | |
| Structure | RCC structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 12 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium or UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Concealed copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Power backup for common areas | |
| Sewage plant | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.04 Cr 27%Development · ₹13.62 Cr 73%
| Estimated cost | ₹18.67 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹12.39 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Yelahanka | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 21 Dec 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Yelahanka | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 3.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 3.5 km | Locked |
|---|
| Sobha City Athena | about 4.5 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 4.5 km | Locked |
|---|
| Riviera Glade | about 5 km | Locked |
|---|
| Cumins Sanctum | about 5 km | Locked |
|---|
| about 2 km |
| 31 Dec 2026 |
| 71% (119 of 167) |
| Locked |
| Assetz Zen & Sato | about 2.5 km | 31 May 2030 | 44% (202 of 456) | Locked |
|---|
| 4square Park Sierra | about 2.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
|---|
| Projects within 4 km, counted | 48 (48 with an approximate location) | |
|---|---|---|
| Flats in them | 16,392 | |
| Booked | 10,021 of 16,392 (61%) | |
| Unsold | 6,371 | |
| Booked a month, pooled | 398 flats | |
| Months to sell, pooled | 16 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Bagalur Cross | |
| Kempegowda Airport | 13.5 |
| MG Road (CBD) | 15.5 |
| Manyata Tech Park | 7.5 |
| ITPL, Whitefield | 19.5 |
| Ecospace, Bellandur ORR | 22 |
| Electronic City Ph 1 | 31 |
| Landfill or waste transfer station | about 3 km to the north-east | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Hinduja Ecopolis Substation on OpenStreetMap |