| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 384 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open SOBHA Altair in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore · Survey 56
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Grama Panchayath · Survey 56
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/AS/AA-5/TS-4/E/60/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/070126/008388
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 56 | |
|---|---|---|
| Land extent, Sy 56 | 3 Acre 15 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 13,658 sq m | |
| Khata | E Khatha · Grama Panchayath · 21 Oct 2015 | |
| Sale deed | 23 May 2012 | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 29 Dec 2025 · No. BDA/NM/AS/AA-5/TS-4/E/60/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/197/2024 · issued 1 Jul 2024 · building height 59.5 m | Clear |
| Environmental clearance | SEIAA 143 CON 2024 · EC identification no. EC24C3801KA5520604N · issued 7 Jan 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-349103 · issued 19 Jun 2025 · valid until 6 Jan 2035 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 May 2031 |
| Land conversion | Converted 20 Jun 2011 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 56 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 114 m² 36.7%3.5BHK · avg 137 m² 26.6%4BHK · avg 149 m² 24.2%4BHK + terrace · avg 149 m² 11.6%2BHK 1%
| 2BHK | 2 | 2,034 |
| 3BHK | 76 | 92,979 |
| 3.5BHK | 55 | 81,354 |
| 4BHK | 50 | 79,933 |
| 4BHK + terrace | 24 | 38,363 |
| Sold, Q2 2026-27 | 32 / 207 | |
|---|---|---|
| Unsold, Q2 2026-27 | 175 |
| SOBHA Altair This project | This project is the point the others are measured from | 31 May 2031 | 15% (32 of 207) | Not verified yet |
|---|---|---|---|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | 440 m | 30 Jun 2026 | 100% (113 of 113) | Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 440 m | 30 Jun 2026 | 100% (151 of 151) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.4 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 810 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 340 m to the east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.50 (310 covered spaces for 207 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 2 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 27 Mar 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 8% | |
| Completion, accountant | 17.9% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 May 2031 | |
| RERA completion date | 31 May 2031 | |
| Work began, as filed | 1 Jan 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 59.5 m on the fire NOC · 59.5 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/197/2024 · issued 1 Jul 2024 · building height 59.5 m | |
| Environmental clearance | SEIAA 143 CON 2024 · EC identification no. EC24C3801KA5520604N · issued 7 Jan 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 30 Dec 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹297.34 Cr 46.7%Development · ₹338.94 Cr 53.3%
| Estimated cost | ₹636.28 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹332.10 Cr | |
| Cost incurred | ₹113.94 Cr (17.9% of the estimate) | |
| Cost left | ₹522.34 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (32) 15.5%Unsold (175) 84.5%
| Sold, Q4 2025-26 | 41 / 207 · 166 available | |
|---|---|---|
| Sold, Q1 2026-27 | 35 / 207 · 172 available | |
| Sold, Q2 2026-27 | 32 / 207 · 175 available | |
| Unsold, Q2 2026-27 | 175 | |
| Sold in Q1 2026-27 | 6 bookings cancelled or corrected (41 → 35 sold) | |
| Sold in Q2 2026-27 | 3 bookings cancelled or corrected (35 → 32 sold) |
| Escrow bank | KOTAK MAHINDRA BANK · MG Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹16.2 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Escrow account, Q1 2026-27 | ₹18.04 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Complaints filed against the promoter | 226 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 29 Dec 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · MG Road, Bangalore | |

Map of 11 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked; Satori Residence By Genurise, price locked; 63 Degree East - Tower E, price locked; Adarsh Rosewood, price locked; Birla Evara, price locked; SOBHA Neopolis, price locked; Assetz Ren & Rei, price locked; Adarsh Parkland, price locked.
| Mana Jardin Neo | 560 m | Locked |
|---|
| Satori Residence By Genurise | 1.4 km | Locked |
|---|
| 63 Degree East - Tower E | 1.4 km | Locked |
|---|
| Orion Heights | about 1.5 km | Locked |
|---|
| Adarsh Rosewood | 2.2 km | Locked |
|---|
| Birla Evara | 2.3 km | Locked |
|---|
| Haven Phase 2 | about 2.5 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 440 m | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Mana Jardin Neo | 560 m | 30 Dec 2032 | 27% (22 of 82) | Locked |
|---|
| Satori Residence By Genurise | 1.4 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
|---|
| 63 Degree East - Tower E | 1.4 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹95,500 /mo · 10 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹65,000 /mo · 101 listings | |
| Rent, 2BHK, 3 km | ₹41,000 /mo · 153 listings | |
| Rent, 1BHK, 3 km | ₹21,000 /mo · 41 listings | |
| Rent per sq ft, 3 km | ₹40.0 /mo, as listed · 160 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 97 (41 with an approximate location) | |
|---|---|---|
| Flats in them | 31,384 | |
| Booked | 16,960 of 31,384 (54%) | |
| Unsold | 14,424 | |
| Booked a month, pooled | 468 flats | |
| Months to sell, pooled | 30 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Halanayakanahalli Gram Panchayath), Other | |
| Nearest city water main | 260 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 810 m to the north-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.1 km, Kadubeesanahalli | |
| Kempegowda Airport | 33.2 |
| MG Road (CBD) | 14.1 |
| Manyata Tech Park | 18.6 |
| ITPL, Whitefield | 10.1 |
| Ecospace, Bellandur ORR | 4.0 |
| Electronic City Ph 1 | 7.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.6 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 930 m to the south-east |