| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 55 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sobha Windsor Phase 3 Wing 6, 7 And 8 in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/084/2019 | Clear |
| Environmental clearance | SEIAA 31 CON 2019 · issued 12 Aug 2020 | Clear |
| Airport height NOC | permissible top elevation 1006 m above mean sea level | |
| Pollution board (CFE) (1 of 2) | consent order W-349083 · issued 19 Jun 2025 · valid until 30 Jun 2028 | Clear |
| Pollution board (CFE) (2 of 2) | consent order W-350028 · issued 6 Aug 2025 | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2027 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.1 km, GANDHIPURAM NEAR WHITE FIELD | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 30 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 210 m to the south-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Electricity, built | 100% | |
|---|---|---|
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Water and Sanitation, built | 100% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 20 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 3 Apr 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 3 Apr 2027 | |
| RERA completion date | 30 Sep 2027 | |
| Work began, as filed | 14 Nov 2020 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/084/2019 | |
| Environmental clearance | SEIAA 31 CON 2019 · issued 12 Aug 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹50.76 Cr 25.7%Development · ₹146.80 Cr 74.3%
| Estimated cost | ₹197.56 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹66.9 L | |
| Land cost revision | Not verified yet | |
Sold (192) 100%
| Sold, Q3 2025-26 | 192 / 192 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 192 / 192 · 0 available | |
| Sold, Q1 2026-27 | 192 / 192 · 0 available | |
| Sold, Q2 2026-27 | 192 / 192 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | STATE BANK OF INDIA · OVERSEAS BRANCH, BANGALORE | |
|---|---|---|
| Designated account, collected | ₹6.3 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.5 L in Q2 2026-27 | |
| Escrow account, Q1 2026-27 | ₹17.5 L withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Complaints filed against the promoter | 226 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | STATE BANK OF INDIA · OVERSEAS BRANCH, BANGALORE |
|---|

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 1.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 30 m to the north-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.2 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 26.1 |
| MG Road (CBD) | 17.9 |
| Manyata Tech Park | 17.8 |
| ITPL, Whitefield | 3.6 |
| Ecospace, Bellandur ORR | 10.7 |
| Electronic City Ph 1 | 17.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.9 km to the north, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 500 m to the west, named Whitefield on OpenStreetMap |