| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: SDR CONSTRUCTIONS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 21 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| – |
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sri Gayathri Avenue in the interactive atlas
Approval or registration
Land use converted
Bangalore · Survey 575
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of SDR CONSTRUCTIONS · Survey 575
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 575
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./MDP/1002/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/141124/007228
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 574 (J.I.Kalkere) |
| East | EC schedule not read yet | Survey 3 (J.I.Kalkere) |
| South | EC schedule not read yet | Survey 576 (J.I.Kalkere) |
| West | EC schedule not read yet | Survey 538, 539, 540 (J.I.Kalkere) |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 13,682 sq m | |
| Land area filed with K-RERA | 2,192 sq m | |
| Filed area as a share of the KGIS plots' area | 16% | |
| Village, hobli and taluk on the KGIS map | J.I.Kalkere, K R Pura-2 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 575 | |
|---|---|---|
| Land extent, Sy 575 | 2,192 sq m | |
| Area on the KGIS map | 13,682 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 2,192 sq m | |
| Khata | A Khatha · BBMP · 3 Nov 2023 | |
| Sale deed | Dated 16 Oct 2023 | |
| Sale deed in favour of | SDR CONSTRUCTIONS |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 575 | 2 | 3 acres 10 guntas | Yes | 0 |
| Building plan (BBMP) | Sanctioned 25 Jan 2024 · No. BBMP/Ad.Com./MDP/1002/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2025 |
| Land conversion | Converted 6 Jun 2022 · Bangalore | |
|---|---|---|
| Survey numbers | 575 |
3BHK · avg 70 m² 60%2BHK · avg 58 m² 40%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 16 | 626 |
| 3BHK | 24 | 757 |
| Vkk Grand | about 2 km | Locked | |
|---|---|---|---|
| Legacy Saviero | about 2 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 2 km | Locked | |
| Nava Skanda Bellavita | about 3 km | Locked | |
| The Pearl Paradise | about 3.5 km |
| Sri Gayathri Avenue This project | This project is the point the others are measured from | 30 Sep 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Vkk Grand | about 2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| SOBHA Victoria Park Phase 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (44 covered spaces for 40 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 28 Feb 2025 | |
| RERA completion date | 30 Sep 2025 | Red flag |
| Work began, as filed | 1 Apr 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 25 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹22.18 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · RAMAMURTHY NAGAR | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 2 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 25 Jan 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · RAMAMURTHY NAGAR | |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked |
|---|
| Brr North Excellency Phase I | about 4.5 km | Locked |
|---|
| Radiance Floresta | about 4.5 km | Locked |
|---|
| Sattva La Vita | about 5 km | Locked |
|---|
| Lodha Mirabelle | about 5 km | Locked |
|---|
| Adarsh Pinecourt | about 5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5 km | Locked |
|---|
| about 2 km |
| 31 Dec 2027 |
| 93% (280 of 300) |
| Locked |
| Nava Skanda Bellavita | about 3 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| The Pearl Paradise | about 3.5 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
|---|
| Projects within 4 km, counted | 32 (32 with an approximate location) | |
|---|---|---|
| Flats in them | 6,682 | |
| Booked | 3,655 of 6,682 (55%) | |
| Unsold | 3,027 | |
| Booked a month, pooled | 101 flats | |
| Months to sell, pooled | 30 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3 km, Horamavu | |
| Kempegowda Airport | 18 |
| MG Road (CBD) | 10 |
| Manyata Tech Park | 5.5 |
| ITPL, Whitefield | 9.5 |
| Ecospace, Bellandur ORR | 12.5 |
| Electronic City Ph 1 | 22 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Horamavu Agara 20MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the west |