Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: Goyal & Co
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 79 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Review |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aarna RajpathLapsed · completion date passed | AARNA PROJECTS | Mixed development | – | Apr 2025 |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Aikya OrchidCompleted · OC 06-05-2024 | AIKYA PROMOTERS AND CONSTRUCTIONS | Apartment | 840–1,049 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm PristineLapsed · completion date passed | B M DEVELOPERS | Apartment | – | Jul 2016 |
| Candeur LandmarkCompleted · OC 15-12-2020 | M/s. Candeur Constructions | Apartment | – | Completed |
8 of 48 other projects in Varthur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Goyal Orchid Life in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹1.15 Cr · Sy 126/1, Gunjur village; Sy 126/5, Gunjur village; and 3 more items
Title deed filed with K-RERA, pp. 1, 11, 23, 25, 27 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹34.5 L · Sy 127/3, Gunjur village
Title deed filed with K-RERA, pp. 1, 5, 15 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹34.5 L
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Approval or registration
Land use converted
DC Bengaluru · Survey 20, 21, 125/4, 125/5 and 4 more
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Goyal Hariyana Associates · Survey 20, 21, 125/4, 125/5 and 4 more
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 20, 21, 125/4, 125/5 and 4 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0033/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/151223/006487
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 20, 21, 125/4, 125/5, 126/1, 126/5 and 2 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 29,238 sq m | |
| Khata | A Khatha · BBMP · 16 May 2023 | |
| Sale deed | Dated 16 Dec 2021 | |
| Sale deed in favour of | Goyal Hariyana Associates | |
| Joint development agreement number | 5834 of Book 1, 2008-09 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 7 Nov 2023 · No. BBMP/Addl.Dir/JDNORTH/0033/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/166/2023 · issued 27 Jun 2023 · building height 78.15 m (TOWER A), 75.15 m (TOWER B, TOWER C, TOWER D, TOWER E) | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | valid until 10 Jan 2031 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 8 Sep 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 28 Feb 2030 |
| Land conversion | Converted 2 Mar 2009 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 20 · 21 · 125/4 · 125/5 · 126/1 · 126/5 · 126/6 · 127/3 |
3BHK · avg 106 m² 39.2%3BHK + 2t · avg 91 m² 25.9%2BHK · avg 74 m² 25%2BHK compact · avg 55 m² 9.8%
| 2BHK | 193 | 792 |
| 2BHK compact | 76 | 590 |
| 3BHK | 303 | 1,144 |
| 3BHK + 2t | 200 | 980 |
| Sold, Q2 2026-27 | 641 / 772 | |
|---|---|---|
| Unsold, Q2 2026-27 | 131 | |
| Months to sell, derived from filed bookings | 6 months |
| Goyal Orchid Life This project | This project is the point the others are measured from | 28 Feb 2030 | 83% (641 of 772) | Not verified yet |
|---|---|---|---|---|
| SOBHA Ayana | 750 m | 31 Dec 2031 | 62% (426 of 683) | Locked |
| Adarsh Park Heights Phase-2 | about 1 km | 31 May 2027 | 95% (471 of 494) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | A 66 kV line crosses the site, its corridor taking about 5% (about 1,960 m²) | Review |
| Nearest government-flagged flood location | 800 m, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 120 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 40 m to the north-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (850 covered spaces for 772 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 90% · planned by 31 Jul 2029 | |
|---|---|---|
| Electrical and plumbing finishing | 45% · planned by 31 Dec 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 84% | |
| Completion, accountant | 58.2% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 28 Feb 2030 | |
| RERA completion date | 28 Feb 2030 | |
| Work began, as filed | 1 Mar 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 78.15 m (TOWER A), 75.15 m (TOWER B, TOWER C, TOWER D, TOWER E) on the fire NOC · filed: TOWER A 78.15 m, TOWER B 75.15 m, TOWER C 75.15 m, TOWER D 75.15 m, TOWER E 75.15 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/166/2023 · issued 27 Jun 2023 · building height 78.15 m (TOWER A), 75.15 m (TOWER B, TOWER C, TOWER D, TOWER E) | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 5 Dec 2023 · site inspected 2 Dec 2023 | |
| Engineer's certificate, registration | Dated 5 Dec 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹81.00 Cr 10.9%Development · ₹660.01 Cr 89.1%
| Estimated cost | ₹741.01 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹340.50 Cr | |
| Cost incurred | ₹431.00 Cr (58.2% of the estimate) | |
| Cost left | ₹310.01 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹334.20 Cr | |
| Land cost revision | Not verified yet | |
Sold (641) 83%Unsold (131) 17%
| Sold, Q3 2025-26 | 446 / 592 · 146 available | |
|---|---|---|
| Sold, Q4 2025-26 | 615 / 772 · 157 available | |
| Sold, Q1 2026-27 | 629 / 772 · 143 available | |
| Sold, Q2 2026-27 | 641 / 772 · 131 available | |
| Unsold, Q2 2026-27 | 131 | |
| Sold in Q4 2025-26 | 169 | |
| Sold in Q1 2026-27 | 14 | |
| Sold in Q2 2026-27 | 12 |
| Escrow bank | ICICI Bank · Commissariat Road Bengaluru | |
|---|---|---|
| Designated account, collected | ₹29.07 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹23.95 Cr in Q2 2026-27 (82% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹59,07,86,793 | |
| Escrow account, Q1 2026-27 | ₹26.43 Cr deposited from sales, ₹27.39 Cr withdrawn | |
| Escrow account, Q3 2025-26 | Opened at ₹2.08 Cr | |
| Escrow account to date, Q1 2026-27 | ₹374.41 Cr deposited from sales, ₹371.92 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹3,71,92,30,703 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 7 Nov 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Commissariat Road Bengaluru | |

Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: SOBHA Ayana, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; SOBHA Neopolis, price locked; Poetry Of Earth, price locked; Adarsh Parkland, price locked; Adarsh Rosewood, price locked.
| 990 m |
| Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 1 km | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 1 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 1.1 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 1.5 km | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 1.5 km | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 1.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 |
|---|
| about 1 km |
| 30 Mar 2026 |
| 100% (237 of 237) |
| Locked |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | 990 m | 30 Sep 2026 | 100% (356 of 356) | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 1 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,20,000 /mo · 5 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹55,000 /mo · 50 listings | |
| Rent, 2BHK, 3 km | ₹40,000 /mo · 131 listings | |
| Rent, 1BHK, 3 km | ₹18,750 /mo · 64 listings | |
| Rent per sq ft, 3 km | ₹36.4 /mo, as listed · 131 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 89 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 33,304 | |
| Booked | 19,159 of 33,304 (58%) | |
| Unsold | 14,145 | |
| Booked a month, pooled | 536 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Other | |
| Nearest city water main | 2.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 120 m to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 3.8 km, Kodibeesanahalli | |
| Kempegowda Airport | 30.4 |
| MG Road (CBD) | 14.7 |
| Manyata Tech Park | 17.6 |
| ITPL, Whitefield | 6.7 |
| Ecospace, Bellandur ORR | 5.1 |
| Electronic City Ph 1 | 11.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the north-west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 620 m to the north-west, named Sobha Dream Acres Substation on OpenStreetMap |