Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Agm BuildersApplied for completion 16/07/2026 | AGM BUILDERS | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| Aikam Golf Estates Phase IRegistered · no quarterly update yet | BCD EMPRASA LIMITED LIABILITY PARTNERSHIP | Plot | ~1,160–1,810 sqft (estimate: filed carpet plus 25%) | Dec 2026 |
| Asn Sai EnclaveLapsed · completion date passed | ANKURAA SAI NITYA ESTATES | Plot | – | Mar 2021 |
| Back To LifeApplied for completion 05/04/2019 | Azven Realty Ventures Private Limited | Plot | – | Dec 2019 |
| Emprasa Startup City - ResidentialLapsed · completion date passed | HOSKOTE NEO HOMES LIMITED | Apartment | 409 sqft carpet (as filed) | Dec 2023 |
| Grovin Green CityApplied for completion 07/05/2024 | M/S GROVIN DEVELOPERS |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 19 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Plot |
| – |
| Feb 2022 |
| Sj Green WoodsLapsed · completion date passed | SJ Developers | Plot | – | Dec 2021 |
| Sowparnika Indradhanush Phase IActive · 100% built | SOWPARNIKA HOMES PRIVATE LIMITED | Apartment | 307–673 sqft carpet (as filed) | May 2027 |
8 of 9 other projects in Hoskote, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open House Of Sapiens in the interactive atlas
Approval or registration
Land use converted
Bengaluru DC office · Survey 76/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan HPA/LAO/32/2024-2025/627
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Rural Development & Panchayat Raj Depart · Survey 76/1
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/310126/008441
K-RERA registration
Title checkApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 31 Aug 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Private lender (individual) · ₹25.0 L disbursed | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch House of Sapiens.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 76/1 | |
|---|---|---|
| Land extent, Sy 76/1 | 4 Acre 20 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 17,907 sq m | |
| Khata | E Khatha · Rural Development & Panchayat Raj Depart · 15 Sep 2025 | |
| Title deed | Sy 76/1, Kasaba hobli, Hoskote taluk | |
Valid as of this reportValidity ended
| Building plan (Hoskote Planning Authority) | Sanctioned 19 Jun 2025 · No. HPA/LAO/32/2024-2025/627 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-349762 · issued 24 Jul 2025 · valid until 23 Jul 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 28 Jan 2031 |
| Land conversion | Converted 22 Feb 2024 · Bengaluru DC office | |
|---|---|---|
| Survey numbers | 76/1 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 100 m² 61.8%2BHK · avg 69 m² 32.5%Penthouse 4 BHK · avg 167 m² 2.5%Penthouse 3 BHK 1.9%Penthouse 5 BHK 1.3%
| 2BHK | 102 | 75,272 |
| 3BHK | 194 | 2,09,616 |
| Penthouse 3 BHK | 6 | 7,868 |
| Penthouse 4 BHK | 8 | 14,391 |
| Penthouse 5 BHK | 4 | 8,590 |
| Sowparnika Indradhanush Phase I | about 0.5 km | Locked | |
|---|---|---|---|
| Sowparnika Shivadhanush | about 0.5 km | Locked | |
| Triaxis Splendour + | about 2.5 km | Locked | |
| Riqueza Siri | about 4 km | Locked | |
| House Of Sapiens This project | This project is the point the others are measured from | 28 Jan 2031 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sowparnika Indradhanush Phase I | about 0.5 km | 31 May 2027 | 99% (567 of 570) | Locked |
| Sowparnika Shivadhanush | about 0.5 km | 30 Nov 2027 | 99% (357 of 360) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 12.5 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.61 (506 covered spaces for 314 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Doddahulluru Grama Panchyat) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 28 Jan 2031 | |
| RERA completion date | 28 Jan 2031 | |
| Work began, as filed | 28 Jan 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Tower A 53.4 m, Tower B (Wing 1) 59.3 m, Tower B (Wing 2) 59.3 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 74.6 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹9.86 Cr 5.2%Development · ₹177.92 Cr 94.8%
| Estimated cost | ₹187.78 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | UCO Bank · HSR Layout Branch(1958) | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Private lender (individual) · ₹25.0 L disbursed | |
|---|---|---|
| Records searched to | 31 Aug 2023 | Review |
| Building plan | Sanctioned 19 Jun 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | UCO Bank · HSR Layout Branch(1958) | |
| One Residences At Sobha One World Ph4 W7 And 8 |
|---|
| about 6 km |
| Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 6 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 6 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 6.5 km | Locked |
|---|
| Neighbourhood Tree Park | about 7.5 km | Locked |
|---|
| Definer Upper Deck | about 8 km | Locked |
|---|
| Godrej Woodscapes | about 9 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 9 km | Locked |
|---|
| Triaxis Splendour + | about 2.5 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| Riqueza Siri | about 4 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 6 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 6 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| Projects within 4 km, counted | 14 (14 with an approximate location) | |
|---|---|---|
| Flats in them | 3,212 | |
| Booked | 2,275 of 3,212 (71%) | |
| Unsold | 937 | |
| Booked a month, pooled | 92 flats | |
| Months to sell, pooled | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 13 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 16 |
| MG Road (CBD) | 27 |
| Manyata Tech Park | 22 |
| ITPL, Whitefield | 15 |
| Ecospace, Bellandur ORR | 24 |
| Electronic City Ph 1 | 32.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2 km to the north-east |
|---|