Overview
Pioneer KRS Park Royal Wing 2
Part ofPioneer KRS Park Royal2 phases, 650 flats
Overview
Part ofPioneer KRS Park Royal2 phases, 650 flats
Overview
Part ofPioneer KRS Park Royal2 phases, 650 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 4 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Ambha Bhavani ResidencyActive · 100% built | SHREE JNANAKSHI BUILDERS AND DEVELOPERS | Apartment | 767 sqft carpet (as filed) | Dec 2027 |
| Ambhavilas ResidencyCompleted · OC 19-10-2023 | SHREE JNANAKSHI BUILDERS AND DEVELOPERS | Apartment | 957 sqft carpet (as filed) | Completed |
| Architha AarnaCompleted (regulator flag) | ARCHITHA VENTURES LLP | Apartment | 888–1,123 sqft carpet (as filed) | Completed |
| Architha Bg EnclaveLapsed · completion date passed | ARCHITHA BUILDERS | Plot | – | Nov 2023 |
| Ars Green Villae RaspberryLapsed · completion date passed | ARS Properties | Apartment | 390–743 sqft carpet (as filed) | Jul 2021 |
| Aryan OpulenceLapsed · completion date passed | Aryan Constructions | Apartment | 960–1,119 sqft carpet (as filed) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 46 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Jul 2021 |
| Balaji SheltersCompleted · OC 25-07-2019 | SRI BALAJI DEVELOPERS | Apartment | 844 sqft carpet (as filed) | Completed |
| Bavisha GreenwoodsLapsed · completion date passed | Bhavisha Properties | Apartment | 614–643 sqft carpet (as filed) | Mar 2022 |
8 of 56 other projects in RR Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Pioneer KRS Park Royal Wing 2 in the interactive atlas
Transfer of the land
Sale deed
Survey 54
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 54
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 54
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 54
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 54
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0009/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/180823/006185
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 8 May 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 21 (Kenchanahalli) |
| East | EC schedule not read yet | Nothing mapped touching it |
| South | EC schedule not read yet | Survey 35 (Pattanagere) |
| West | EC schedule not read yet | Survey 46 (Valagerahalli) |
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 4 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 28,020 sq m | |
| Extent the filed land schedule names for these survey numbers | 39,886 sq m | |
| Plot area against the filed extent | 0.7 times | |
| Land area filed with K-RERA | 8,250 sq m | |
| Filed area as a share of the KGIS plots' area | 29% | |
| Village, hobli and taluk on the KGIS map | Kenchanahalli, Kengeri-4 hobli, Bangalore-South taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 54 | |
|---|---|---|
| Land extent, Sy 54 | 4 Acres 37.12 Guntas | |
| Land extent, Sy 54 | 4 Acres 37.12 Guntas | |
| Area on the KGIS map | 28,020 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 8,250 sq m | |
| Khata | A Khatha · BBMP · 18 Jul 2018 | |
| Sale deed | Dated 20 Mar 2002, 22 Mar 2002 |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 54 | 2 | 5 acres | 9 acres 34 guntas | Differs: 4 acres 34 guntas apart | Not read yet |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 9 Mar 2023 · No. BBMP/Addl.Dir/JDSOUTH/0009/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/275/2019 · issued 17 Jan 2020 | Clear |
| Environmental clearance | SEIAA 61 CON 2026 · EC identification no. EC26C3801KA5572061N · issued 20 Mar 2026 | Clear |
| Airport height NOC | issued 11 Dec 2019 · permissible top elevation 881 m above mean sea level · valid until 10 Dec 2027 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 3 Mar 2022 |
| RERA extensions | Granted · Approved 28 Jul 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2027 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 54 | Converted 15 Mar 2014 · DC Bengaluru | |
| Sy 54 | Converted 2 Feb 2023 · DC Bengaluru | |
| Survey numbers | 54 · 54 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 100 m² 88.2%2BHK · avg 80 m² 11.8%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 20 | 861 |
| 3BHK | 150 | 1,074 |
| Sold, Q1 2026-27 | 149 / 170 | |
|---|---|---|
| Unsold, Q1 2026-27 | 21 | |
| Months to sell, derived from filed bookings | 7 months |
| Sumadhura Pramoda | about 0.5 km | Locked | |
|---|---|---|---|
| Samaya Sunshine | about 2.5 km | Locked | |
| Sobha Royal Crest | about 3.5 km | Locked | |
| Garden Square | about 5.5 km | Locked | |
| Good Earth Ochre | about 6 km | Locked |
| Pioneer KRS Park Royal Wing 2 This project | This project is the point the others are measured from | 30 Jun 2027 | 88% (149 of 170) | Not verified yet |
|---|---|---|---|---|
| Sumadhura Pramoda | about 0.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Samaya Sunshine | about 2.5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sobha Royal Crest |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Pattanagere main road beside RV college | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Valagerehalli Kere | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (170 covered spaces for 170 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 15 Oct 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 75% · planned by 15 Apr 2026 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 84% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Jun 2026 | |
|---|---|---|
| Schedule end | 30 Jun 2026 | |
| RERA completion date | 30 Jun 2027 | |
| Work began, as filed | 1 Jul 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 34.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 26 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jul 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/275/2019 · issued 17 Jan 2020 | |
| Environmental clearance | SEIAA 61 CON 2026 · EC identification no. EC26C3801KA5572061N · issued 20 Mar 2026 | |
| Architect, quarterly | Form 5 · Feb 2026, Jul 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 30 Jun 2023 · site inspected 30 Jun 2023 | |
| Chartered accountant's certificate, registration | Dated 10 Jul 2023 | |
| Chartered accountant, Form 4 | Dated 15 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹13.02 Cr 13.4%Development · ₹84.26 Cr 86.6%
| Estimated cost | ₹97.28 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹83.68 Cr | |
| Estimated cost, engineer's certificate | ₹84.26 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | ₹19.35 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹25.52 Cr | |
| Land cost revision | Not verified yet | |
Sold (149) 87.6%Unsold (21) 12.4%
| Sold, Q3 2025-26 | 130 / 170 · 40 available | |
|---|---|---|
| Sold, Q4 2025-26 | 142 / 170 · 28 available | |
| Sold, Q1 2026-27 | 149 / 170 · 21 available | |
| Unsold, Q1 2026-27 | 21 | |
| Sold in Q4 2025-26 | 12 | |
| Sold in Q1 2026-27 | 7 | |
| Flats booked, Form 4 Q3 2025-26 | 130 |
| Escrow bank | ICICI Bank · Rajarajeswari Nagara | |
|---|---|---|
| Designated account, collected | ₹12.90 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹11.59 Cr in Q1 2026-27 (90% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹4,82,96,345 | |
| Escrow account, Q1 2026-27 | ₹9.18 Cr deposited from sales, ₹11.59 Cr withdrawn | |
| Escrow account, Q4 2025-26 | Opened at ₹15.9 L | |
| Withdrawn from the escrow account to date | ₹1,07,25,11,896 | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 8 May 2026 | |
| Building plan (BBMP) | Sanctioned 9 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Rajarajeswari Nagara | |

| Song Of Wind | about 6 km | Locked |
|---|
| Good Earth Cadence | about 6.5 km | Locked |
|---|
| Adarsh Premia | about 7 km | Locked |
|---|
| Birla Tisya | about 7.5 km | Locked |
|---|
| Srivara Vasudha | about 7.5 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 8 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 8 km | Locked |
|---|
| about 3.5 km |
| 31 Dec 2028 |
| 100% (329 of 329) |
| Locked |
| Garden Square | about 5.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Good Earth Ochre | about 6 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
|---|
| Song Of Wind | about 6 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
|---|
| Projects within 4 km, counted | 14 (14 with an approximate location) | |
|---|---|---|
| Flats in them | 3,391 | |
| Booked | 2,358 of 3,391 (70%) | |
| Unsold | 1,033 | |
| Booked a month, pooled | 59 flats | |
| Months to sell, pooled | 17 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Pattanagere | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 37.5 |
| MG Road (CBD) | 12 |
| Manyata Tech Park | 18.5 |
| ITPL, Whitefield | 26.5 |
| Ecospace, Bellandur ORR | 19.5 |
| Electronic City Ph 1 | 21.5 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Mailasandra Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the south-west, named Hindu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |