Overview
DNR Parklink Phase 1
Part ofDNR Parklink2 phases, 784 flats
Overview
Part ofDNR Parklink2 phases, 784 flats
OverviewSample report
Part ofDNR Parklink2 phases, 784 flats
This is a free sample. A full report of your own is ₹99 for this report.Find a project

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 5 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | – |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | |
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: DNR CORPORATION PVT LTD
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Disposed 1 | |||||||
| 2015 | RA/BET-256/2015 | Revenue court | Chikkagubbi, Bengaluru East | VIMALA DEVI | Survey 103/1 | Land dispute, type not statedLandholders on record: ಆರ್.ನಾಗರಾಜ | Disposed, Low: Decided or closed.Decided |
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
| Forfeiture, agreement | Not verified yet | |
|---|---|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 58 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Review |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 3 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open DNR Parklink Phase 1 in the interactive atlas
Approval or registration
Land use converted
Special Deputy Commissioner, Bengaluru District · Survey 1/129/130
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 1/129/130
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Bengaluru District · Survey 103/1, 103/2, 103/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/s Krishnapriya Reality LLP · Survey 1/129/130
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/s Krishnapriya Reality LLP · Survey 103/1, 103/2, 103/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · KANNUR GRAMA PANCHAYATHI · Survey 103/1, 103/2, 103/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NAMA/ASA/AA-2/THA SA-3/U/23/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/040823/006113
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 99, 100 (J.I.Chikkagubbi) |
| East | EC schedule not read yet | Survey 102 (J.I.Chikkagubbi) |
| South | EC schedule not read yet | Survey 130, 131, 138 (Bairathi); Survey 104 (J.I.Chikkagubbi) |
| West | EC schedule not read yet | Survey 126, 127, 128, 129 (Bairathi) |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: Plot sketch, 1 page, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 22,183 sq m | |
| Land area filed with K-RERA | 16,022 sq m | |
| Filed area as a share of the KGIS plots' area | 72% | |
| Village, hobli and taluk on the KGIS map | J.I.Chikkagubbi, Bidarahalli-3 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 1/129/130, 103/1, 103/2, 103/3 | |
|---|---|---|
| Land extent, Sy 1/129/130 | 13,701 sq m | |
| Land extent, Sy 103/1, 103/2, 103/3 | 22,561 sq m | |
| Area on the KGIS map | 22,183 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 16,022 sq m | |
| Khata | A Khatha · BBMP · 2 Feb 2021; E Khatha · KANNUR GRAMA PANCHAYATHI · 23 Nov 2021 | |
| Sale deed | Dated 14 Jun 2021, 2 Nov 2021 | |
| Sale deed in favour of | M/s Krishnapriya Reality LLP | |
| Title deed | Sy 129; 130, Bidarahalli hobli |
| Joint development agreement number | 980 of Book 1, 2022-23 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 31 Mar 2023 · No. BDA/NAMA/ASA/AA-2/THA SA-3/U/23/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/348/2022 · issued 10 Nov 2022 · building height 71.05 m | Clear |
| Environmental clearance | SEIAA 132 CON 2022 · EC identification no. EC23B000KA110726 · issued 3 Jan 2023 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/060222/675393 · issued 24 Jun 2022 · valid until 23 Jun 2030 | Clear |
| Pollution board (CFE) | consent order CTE-337120 · issued 28 Mar 2023 · valid until 2 Jan 2033 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 1/129/130 | Converted 29 May 2019 · Special Deputy Commissioner, Bengaluru District | |
| Sy 103/1, 103/2, 103/3 | Converted 5 Mar 2021 · Deputy Commissioner Bengaluru District | |
| Survey numbers | 1/129/130 · 103/1, 103/2, 103/3 |
| Forfeiture, allotment letter | Deducted on cancelling the allotment, within 15 days: nothing; 16 to 30 days: 1% of the cost of the unit; 31 to 60 days: 1.5% of the cost of the unit; after 61 days: 2% of the cost of the unit |
|---|
On Executing Sale Agreement 10%Within 15 days from the date of agreement 10%completion of Tower Foundation 5%Completion of Tower Podium/ Ground Level… 5%Completion of first Floor Slab 5%Completion of 4th Floor Slab 5%Completion of 7th Floor Slab 5%Completion of 10th Floor Slab 5%Completion of 13th Floor Slab 5%Completion of 16th Floor Slab 5%Completion of 19th Floor Slab 5%Completion of 20nd Floor Slab 5%Completion of 21st Floor Slab 5%Completion of 22nd Floor Slab 5%Completion of final slab 5%completion of internal wall finishes of… 5%Completion of External finishes of tower 5%Possession 5%
| Due on signing | 10% | |
|---|---|---|
| Due within 15 days | 10% | |
| Each construction stage | 5% (15 stages) | |
| Floors in payment plan | Not verified yet | |
| Late-payment interest | Rate prescribed in the Rules | |
| Interest the builder pays on late possession | Rate prescribed in the Rules | |
| Transfer fee | ₹150 per sq ft | |
|---|---|---|
| Holding charge | ₹2 per sq ft per month | |
| Maintenance included | Not verified yet | |
| Defect liability | 5 years | |
3BHK(type2) · 106 m² 37.1%3BHK (type 1) · 115 m² 25.8%2BHK (type1) · 86 m² 12.9%2BHK (type2) · 84 m² 12.9%2.5BHK with study · 97 m² 11.2%
| 2.5BHK with study | 40 | 1,044 |
| 2BHK (type1) | 46 | 926 |
| 2BHK (type2) | 46 | 904 |
| 3BHK (type 1) | 92 | 1,238 |
| 3BHK(type2) | 132 | 1,141 |
| Sold, Q2 2026-27 | 315 / 356 | |
|---|---|---|
| Unsold, Q2 2026-27 | 41 | |
| Months to sell, derived from filed bookings | Too few bookings to project (1 flat booked in 9 months) |
| Radiance Floresta | about 1 km | Locked | |
|---|---|---|---|
| Adarsh Pinecourt | 820 m | Locked | |
| Sattva La Vita | 1.3 km | Locked | |
| The Pearl Paradise | 1.4 km | Locked |
| DNR Parklink Phase 1 This project | This project is the point the others are measured from | 31 Dec 2027 | 88% (315 of 356) | Not verified yet |
|---|---|---|---|---|
| Radiance Floresta | about 1 km | 31 May 2028 | 100% (65 of 65) | Locked |
| Adarsh Pinecourt | 820 m | 6 Mar 2026 | 71% (142 of 201) | Locked |
| Sattva La Vita |
Map of the ground within about 1.1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 3.6 km, Telecom layout, Ashwathnagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 740 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 400 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.26 (450 covered spaces for 356 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 40% · planned by 30 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 2% · planned by 30 Sep 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 76% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 24 Oct 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Aug 2023 | |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 71.05 m on the fire NOC · 73 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium or UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Concealed copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 145 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/348/2022 · issued 10 Nov 2022 · building height 71.05 m | |
| Environmental clearance | SEIAA 132 CON 2022 · EC identification no. EC23B000KA110726 · issued 3 Jan 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Engineer's certificate, registration | Dated 14 Apr 2023 | |
| Chartered accountant's certificate, registration | Dated 12 May 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
3D walkthrough · this project only
20 plates of DNR Parklink Phase 1, redrawn in 3D from the filed brochure. Walk through the plan, not just look at it.
Walls, doors and windows follow the filed plan; furniture is indicative.
Opens in a new tab, signed in as you. The link itself opens nothing for anyone else.
Land · ₹66.53 Cr 21%Development · ₹250.00 Cr 79%
| Estimated cost | ₹316.53 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹197.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (315) 88.5%Unsold (41) 11.5%
| Sold, Q3 2025-26 | 314 / 356 · 42 available | |
|---|---|---|
| Sold, Q4 2025-26 | 315 / 356 · 41 available | |
| Sold, Q1 2026-27 | 315 / 356 · 41 available | |
| Sold, Q2 2026-27 | 315 / 356 · 41 available | |
| Unsold, Q2 2026-27 | 41 | |
| Sold in Q4 2025-26 | 1 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | ICICI Bank · MG Road | |
|---|---|---|
| Designated account, collected | ₹9.22 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.89 Cr in Q2 2026-27 (86% of that quarter's deposits) | |
| Escrow account to date, Q3 2025-26 | ₹161.24 Cr deposited from sales | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 31 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · MG Road | |

Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Pinecourt, price locked; Sattva La Vita, price locked; The Pearl Paradise, price locked; Sumadhura Solea, price locked; Sumadhura Epitome, price locked.
| Nava Skanda Bellavita | about 2 km | Locked |
|---|
| Sobha City Athena | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 3 km | Locked |
|---|
| Brr North Excellency Phase I | about 3.5 km | Locked |
|---|
| Sumadhura Solea | 3.6 km | Locked |
|---|
| 1.3 km |
| 12 Jul 2026 |
| 32% (20 of 63) |
| Locked |
| The Pearl Paradise | 1.4 km | 31 Dec 2026 | 72% (23 of 32) | Locked |
|---|
| Nava Skanda Bellavita | about 2 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Sobha City Athena | about 2.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹48,000 /mo · 24 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹32,250 /mo · 42 listings | |
| Rent, 1BHK, 3 km | ₹13,000 /mo · 11 listings | |
| Rent per sq ft, 3 km | ₹31.7 /mo, as listed · 46 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 57 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 14,283 | |
| Booked | 8,402 of 14,283 (59%) | |
| Unsold | 5,881 | |
| Booked a month, pooled | 245 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 1.1 km of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (KANNUR GRAMA PANCHAYATHI) | |
| Nearest city water main | 2.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 740 m to the south-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 5.6 km, Nagawara | |
| Kempegowda Airport | 14.1 |
| MG Road (CBD) | 13.2 |
| Manyata Tech Park | 5.6 |
| ITPL, Whitefield | 13.9 |
| Ecospace, Bellandur ORR | 17.6 |
| Electronic City Ph 1 | 27.1 |
| Landfill or waste transfer station | 2.3 km to the north | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 520 m to the south | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.2 km to the south |