| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 4 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 69 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva Forest Ridge in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 13 Dec 2024 · No. BBMP/Adl.Dir/JDSOUTH/0059/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC (1 of 2) | KSFES/NOC/257/2023 · issued 27 Nov 2023 · building height 76.6 m (Tower 2) | Clear |
| Fire NOC (2 of 2) | KSFES/NOC/324/2024 · issued 4 Dec 2024 | Clear |
| Environmental clearance | SEIAA 84 CON 2024 · EC identification no. EC23C3801KA5102236N · issued 12 Nov 2024 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-344187 · issued 9 Jul 2024 · valid until 8 Jul 2029 | Clear |
| Water and sewerage NOC (BWSSB) (1 of 2) | issued 19 Mar 2024 | |
| Water and sewerage NOC (BWSSB) (2 of 2) | issued 5 Jul 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 23 Apr 1997 · office of the Deputy Commissioner, Bangalore District | |
|---|---|---|
| Survey numbers | 43/3 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 1.3 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 2.3 km, Raghuvanahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 240 m to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 780 m to the east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.94 (382 covered spaces for 407 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 24 Aug 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 7 Jun 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 18% | |
| Completion, accountant | 18.2% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2029 | |
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 1 Jan 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 76.6 m (Tower 2) on the fire NOC · filed: 1 Wing 1 95.7 m, 1 Wing 2 95.7 m, 2 89.7 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 1 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety (1 of 2) | KSFES/NOC/257/2023 · issued 27 Nov 2023 · building height 76.6 m (Tower 2) | |
| Fire safety (2 of 2) | KSFES/NOC/324/2024 · issued 4 Dec 2024 | |
| Environmental clearance | SEIAA 84 CON 2024 · EC identification no. EC23C3801KA5102236N · issued 12 Nov 2024 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 16 Dec 2024 | |
| Engineer's certificate, registration | Dated 16 Dec 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹158.91 Cr 43.8%Development · ₹203.57 Cr 56.2%
| Estimated cost | ₹362.48 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹191.20 Cr | |
| Cost incurred | ₹65.82 Cr (18.2% of the estimate) | |
| Cost left | ₹296.66 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹303.13 Cr | |
| Land cost revision | Not verified yet | |
Sold (304) 74.7%Unsold (103) 25.3%
| Sold, Q3 2025-26 | 191 / 407 · 216 available | |
|---|---|---|
| Sold, Q4 2025-26 | 226 / 407 · 181 available | |
| Sold, Q1 2026-27 | 257 / 407 · 150 available | |
| Sold, Q2 2026-27 | 304 / 407 · 103 available | |
| Unsold, Q2 2026-27 | 103 | |
| Sold in Q4 2025-26 | 35 | |
| Sold in Q1 2026-27 | 31 | |
| Sold in Q2 2026-27 | 47 |
| Escrow bank | FEDERAL BANK OF INDIA · ST MARKS ROAD | |
|---|---|---|
| Designated account, collected | ₹24.62 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹17.05 Cr in Q2 2026-27 (69% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 26 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 10 | |
| Complaints filed against the promoter | 2 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 13 Dec 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · ST MARKS ROAD | |

Map of storm drains, lakes and government-flagged flood locations within about 1.3 km of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 50 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 240 m to the north, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.1 km, Vajarahalli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 40.7 |
| MG Road (CBD) | 13.4 |
| Manyata Tech Park | 21.4 |
| ITPL, Whitefield | 23.7 |
| Ecospace, Bellandur ORR | 15.0 |
| Electronic City Ph 1 | 13.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 840 m to the south-east, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 290 m to the south-west |