Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 40 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amidst NatureExtended to 20-07-2027 |
| CLIMATE CONNECTIONS |
| Plot |
| ~1,500–2,800 sqft (estimate: filed carpet plus 25%) |
| Jul 2025 |
| Amitha Wisdom HomesLapsed · completion date passed | CADABAMS SENIOR DWELLING LLP | Apartment | 464 sqft carpet (as filed) | Dec 2024 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aiekya in the interactive atlas
Transfer of the land
Title deed executed
Sy 37; 38; 608, Yelachenahalli village, Uttarahalli hobli, Bengaluru South taluk · 9600 square feet
Title deed filed with K-RERA, pp. 1, 14 · See it in Documents
Transfer of the land
Sale deed
in favour of Avaneesh Ventures · Survey 625/1/608/18/121
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 625/1/608/18/121
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/5802/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/030924/006984
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 3 Jun 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 625/1/608/18/121 | |
|---|---|---|
| Land extent, Sy 625/1/608/18/121 | 892 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 892 sq m | |
| Khata | A Khatha · BBMP · 5 Jul 2023 | |
| Sale deed | Dated 6 Jun 2023 | |
| Sale deed in favour of | Avaneesh Ventures | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 16 Dec 2023 · No. PRJ/5802/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-124213 · issued 21 Jul 2023 · valid until 20 Jul 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 625/1/608/18/121 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 105 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 18 | 1,129 |
| Sold, Q4 2025-26 | 17 / 18 | |
|---|---|---|
| Unsold, Q4 2025-26 | 1 |
| Song Of Wind | about 2 km | Locked | |
|---|---|---|---|
| Adarsh Premia | about 3 km | Locked | |
| Garden Square | about 3 km | Locked | |
| Srivara Vasudha | about 3.5 km | Locked | |
| Iris Courtyard | about 3.5 km | Locked |
| Aiekya This project | This project is the point the others are measured from | 31 Dec 2027 | 94% (17 of 18) | Not verified yet |
|---|---|---|---|---|
| Song Of Wind | about 2 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Adarsh Premia | about 3 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Garden Square | about 3 km | 30 Jun 2026 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, silkboardjunction | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.89 (16 covered spaces for 18 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 31 May 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Jul 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Completion date, agreement | 31 Dec 2027 | |
| Work began, as filed | 15 Dec 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 5 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jun 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Jun 2026 (2 filed) | |
| Chartered accountant's certificate, registration | Dated 27 Mar 2024 | |
| Chartered accountant, Form 4 | Dated 13 Feb 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.12 Cr 21.2%Development · ₹15.30 Cr 78.8%
| Estimated cost | ₹19.42 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹3.41 Cr | |
| Land cost revision | Not verified yet | |
Sold (17) 94.4%Unsold (1) 5.6%
| Sold, Q3 2025-26 | 17 / 18 · 1 available | |
|---|---|---|
| Sold, Q4 2025-26 | 17 / 18 · 1 available | |
| Unsold, Q4 2025-26 | 1 | |
| Sold in Q4 2025-26 | 0 | |
| 3 BHK, sold | 17 / 18 |
| Escrow bank | Axis Bank · KSRTC Layout, J.P. Nagar, Bengaluru | |
|---|---|---|
| Designated account, collected | ₹1.99 Cr in Q4 2025-26 | |
| Designated account, withdrawn | ₹6.67 Cr in Q4 2025-26 | |
| Escrow account, Q3 2025-26 | Opened at ₹71.3 L, ₹2.29 Cr other deposits, ₹2.22 Cr withdrawn | |
| Escrow account to date, Q3 2025-26 | ₹15.81 Cr deposited from sales, ₹8.58 Cr other deposits, ₹13.33 Cr withdrawn, ₹6.26 Cr other withdrawals, balance ₹4.79 Cr | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 3 Jun 2024 | Review |
| Building plan (BBMP) | Sanctioned 16 Dec 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · KSRTC Layout, J.P. Nagar, Bengaluru | |

| Sattva Forest Ridge | about 4 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 4 km | Locked |
|---|
| Platinum Landmark | about 4 km | Locked |
|---|
| Aqua Vista | about 4.5 km | Locked |
|---|
| Lodha Azur | about 4.5 km | Locked |
|---|
| Pacific Legacy | about 4.5 km | Locked |
|---|
| Sobha Royal Crest | about 5 km | Locked |
|---|
| 84% (193 of 230) |
| Locked |
| Srivara Vasudha | about 3.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Iris Courtyard | about 3.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Sattva Forest Ridge | about 4 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Projects within 4 km, counted | 29 (29 with an approximate location) | |
|---|---|---|
| Flats in them | 4,717 | |
| Booked | 2,952 of 4,717 (63%) | |
| Unsold | 1,765 | |
| Booked a month, pooled | 78 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Yelachenahalli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 37 |
| MG Road (CBD) | 9.5 |
| Manyata Tech Park | 17.5 |
| ITPL, Whitefield | 21 |
| Ecospace, Bellandur ORR | 12.5 |
| Electronic City Ph 1 | 13.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Sarakki 5MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named ISRO Layout Substation on OpenStreetMap |