Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amidst Nature |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 58 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| CLIMATE CONNECTIONS |
| Plot |
| ~1,500–2,800 sqft (estimate: filed carpet plus 25%) |
| Jul 2025 |
| Amitha Wisdom HomesLapsed · completion date passed | CADABAMS SENIOR DWELLING LLP | Apartment | 464 sqft carpet (as filed) | Dec 2024 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Amberstone Illumina in the interactive atlas
Approval or registration
Land use converted
District Commissioner, Bangalore District · Survey 35/1, 36/6, 36/7
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 35/1, 36/6, 36/7
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 35/1, 36/6, 36/7
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./BMH/0138/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/160925/008097
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 29 Aug 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 35/1, 36/6, 36/7 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,392 sq m | |
| Khata | E Khatha · BBMP · 11 Nov 2024 | |
| Sale deed | Dated 14 Oct 2024 | |
| Building plan (BBMP) | Sanctioned 1 Sep 2025 · No. BBMP/Ad.Com./BMH/0138/25-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 21 Aug 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 18 Jan 2017 · District Commissioner, Bangalore District | |
|---|---|---|
| Survey numbers | 35/1 · 36/6 · 36/7 · 35/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2.5BHK · avg 94 m² 56.3%3BHK · avg 100 m² 25%2BHK 18.8%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 12 | 9,515 |
| 2.5BHK | 36 | 36,511 |
| 3BHK | 16 | 17,136 |
| Sold, Q2 2026-27 | 64 / 64 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
| Platinum Landmark | about 1 km | Locked | |
|---|---|---|---|
| Sattva Forest Ridge | about 1.5 km | Locked | |
| Aqua Vista | about 3 km | Locked | |
| Mahindra Eden Phase-2 | about 3.5 km | Locked | |
| Srivara Vasudha | about 3.5 km | Locked |
| Amberstone Illumina This project | This project is the point the others are measured from | 31 Dec 2028 | 100% (64 of 64) | Not verified yet |
|---|---|---|---|---|
| Platinum Landmark | about 1 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Sattva Forest Ridge | about 1.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
| Aqua Vista |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3 km, BDA LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Subedarana Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.27 (81 covered spaces for 64 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 30 Jun 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 25 Feb 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 54% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 15 Sep 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 6.75 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 29 Aug 2025 · site inspected 28 Aug 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹10.45 Cr 19.1%Development · ₹44.12 Cr 80.9%
| Estimated cost | ₹54.57 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹37.40 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (64) 100%
| Sold, Q3 2025-26 | 32 / 64 · 32 available | |
|---|---|---|
| Sold, Q4 2025-26 | 62 / 64 · 2 available | |
| Sold, Q1 2026-27 | 64 / 64 · 0 available | |
| Sold, Q2 2026-27 | 64 / 64 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 30 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Indian Bank · JP NAGAR SARRAKI BRANCH | |
|---|---|---|
| Designated account, collected | ₹12.15 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹8.50 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 29 Aug 2025 | |
| Building plan (BBMP) | Sanctioned 1 Sep 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Indian Bank · JP NAGAR SARRAKI BRANCH | |

| Iris Courtyard | about 4 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 4 km | Locked |
|---|
| Lodha Azur | about 5 km | Locked |
|---|
| Azur Tower D | about 5 km | Locked |
|---|
| Garden Square | about 6 km | Locked |
|---|
| Axis Amarissa | about 6 km | Locked |
|---|
| Azur Phase 2 | about 6.5 km | Locked |
|---|
| about 3 km |
| 31 Dec 2024 |
| 96% (173 of 181) |
| Locked |
| Mahindra Eden Phase-2 | about 3.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Srivara Vasudha | about 3.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Iris Courtyard | about 4 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Projects within 4 km, counted | 31 (31 with an approximate location) | |
|---|---|---|
| Flats in them | 6,051 | |
| Booked | 3,502 of 6,051 (58%) | |
| Unsold | 2,549 | |
| Booked a month, pooled | 99 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Kalena Agrahara | |
| Kempegowda Airport | 41.5 |
| MG Road (CBD) | 14.5 |
| Manyata Tech Park | 22.5 |
| ITPL, Whitefield | 24 |
| Ecospace, Bellandur ORR | 15 |
| Electronic City Ph 1 | 12 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |