Fire NOCGBC(1)58/2014Filed as Fire Force Department, p. 1
Airport height NOCNOC ID BANG/SOUTH/B/010115/84616Filed as Airport Authority of India, p. 1
Environmental clearanceIssued 5 Feb 2016Filed as SEIAA, p. 1
5 pagesAvailable
8 pagesAvailable
Available
62 pages1 factAvailable
3 pages1 factAvailable
1 pageAvailable
6 pagesAvailable
10 pagesAvailable
10 pages2 factsAvailable
1 pageAvailable
Available
1 pageAvailable
Available
Available
1 pageAvailable
Available
2 pagesAvailable
6 pagesAvailable
6 pagesAvailable
22 pagesAvailable
4 pagesAvailable
6 pagesAvailable
5 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 7 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 16 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 16 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The outline is the whole property the filing names, not survey by survey.
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
2.4 km
!Review
Distances
Within 3 km
Connectivity
Straight-line distance from the site
Nuisances
Distance from the site
By component
Completed
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 29 Dec 2020
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
1 Oct 2021
RERA completion date
1 Jul 2022
Work began, as filed
15 Jul 2017
Specified structure
What the promoter specified · not an inspection
Structure
RCC structure, pre-cast technology
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹12.65 Cr 18.8%Development · ₹54.67 Cr 81.2%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹67.32 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold, at completion
Sold (117) 100%
Flats sold per quarter
Completed
K-RERA inventory
Flats sold, at completion
117
Flats unsold, at completion
0
Flats in the phase
117
Compliance
Escrow
Completed
Escrow and filings
Escrow bank
Axis Bank · MG Road
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
0
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
118
Marked completed
61
Past promised date, not completed
7
Revoked or withdrawn
7
Complaints filed against the promoter
226
Other phases under this promoter name
114
With a filed extension or completion
64 (57 completed, 7 extended)
Average schedule slip
12 months
Developer's project loan
Not verified yet
Records searched to
Not verified yet
Building plan
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
Axis Bank · MG Road
Stage
Certified progress
Completed
Basemap: Esri, OpenStreetMap contributors
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; SOBHA Ayana, price locked; SOBHA Neopolis, price locked; Adarsh Parkland, price locked; Poetry Of Earth, price locked; Adarsh Rosewood, price locked.
This project
Padlock: that project's price is part of its own report