Overview
Folium by Sumadhura
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Part ofFolium by Sumadhura4 phases, 2,240 flats
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 25 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Folium by Sumadhura in the interactive atlas
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/1, 47/2A, 47/2B, 47/3, 48/3, 48
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/1, 47/2A, 47/2B, 47/3, 48/3, 48
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ARO Whitefiled BBMP · Survey 47/1, 47/2A, 47/2B, 47/3, 48/3, 48
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Add Dir/JD North/36/2021-22 & PRJ3863/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/280222/004738
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | TATA Capital Housing Finance Ltd · ₹30.00 Cr disbursed | |
| Mortgage on the project land | Declared by the promoter | Review |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 47/1 47/2A 47/2B 47/3 48/3 48/ | |
|---|---|---|
| Land extent, Sy 47/1 47/2A 47/2B 47/3 48/3 48/ | 11 Acre, 15.03 Gunta / 46036 Sq.M | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 19,862 sq m | |
| Khata | A Khatha · ARO Whitefiled BBMP · 26 Apr 2021 | |
| Sale deed | 7 Mar 2005 | |
| Sale deed in favour of | Sumadhura Infracon Private Limited | |
| Title deed | Sy 47/2A | |
| Building plan (BBMP) | Sanctioned 25 Jan 2022 · No. BBMP/Add Dir/JD North/36/2021-22 & PRJ3863/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/311/2020 · issued 23 Apr 2021 | Clear |
| Environmental clearance | SEIAA 116 CON 2020 · issued 4 Sep 2020 | Clear |
| Airport height NOC | permissible top elevation 953.35 m above mean sea level | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 30 Jun 2025 |
| Land conversion | Converted 30 Jan 2019 · DC Office Bangalore Urban | |
|---|---|---|
| Survey numbers | 47/1 47/2A 47/2B 47/3 48/3 48/ |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
Flats · avg 89 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 480 | 963 |
| Reflections 66 | 450 m | Locked | |
|---|---|---|---|
| Assetz 66 & Shibui | about 1 km | Locked | |
| Coevolve Misty Shores | about 1.5 km | Locked | |
| Axis Ekatva | about 1.5 km | Locked |
| Folium by Sumadhura This project | This project is the point the others are measured from | 30 Jun 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | 450 m | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Coevolve Misty Shores |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 810 m, Varthur Columbia Asia hospital | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 70 m to the south-west, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 40 m to the south, Sheelavantana Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
| Amenities declared | Electricity | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.05 (506 covered spaces for 480 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 570 m | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 4 Jun 2025 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 19 Mar 2025 | |
| RERA completion date | 30 Jun 2025 | |
| Work began, as filed | 1 Jan 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 59.95 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/311/2020 · issued 23 Apr 2021 | |
| Environmental clearance | SEIAA 116 CON 2020 · issued 4 Sep 2020 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹89.91 Cr 24.1%Development · ₹283.73 Cr 75.9%
| Estimated cost | ₹373.63 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹192.48 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (375) 78.1%Unsold (105) 21.9%
| Flats sold, at completion | 375 | |
|---|---|---|
| Flats unsold, at completion | 105 | |
| Flats in the phase | 480 |
| Escrow bank | INDUSIND BANK · M G ROAD BENGALURU | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 24 | |
|---|---|---|
| Marked completed | 10 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 4 | |
| Other phases under this promoter name | 17 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 13 months |
| Developer's project loan | TATA Capital Housing Finance Ltd · ₹30.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 25 Jan 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | INDUSIND BANK · M G ROAD BENGALURU | |
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Reflections 66, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Poetry Of Earth, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked.
| Vaswani Starlight | about 1.5 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 2.6 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 2.9 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 2.9 km | Locked |
|---|
| Inspira Infinity | about 3 km | Locked |
|---|
| Poetry Of Earth | 3.3 km | Locked |
|---|
| Vintage Valley | about 4 km | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 4 km | Locked |
|---|
| about 1.5 km |
| 31 Dec 2029 |
| 2% (3 of 153) |
| Locked |
| Axis Ekatva | about 1.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Vaswani Starlight | about 1.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 2.6 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,05,000 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹56,500 /mo · 83 listings | |
| Rent, 2BHK, 3 km | ₹35,325 /mo · 118 listings | |
| Rent, 1BHK, 3 km | ₹19,000 /mo · 113 listings | |
| Rent per sq ft, 3 km | ₹35.7 /mo, as listed · 152 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 74 (38 with an approximate location) | |
|---|---|---|
| Flats in them | 20,905 | |
| Booked | 13,482 of 20,905 (64%) | |
| Unsold | 7,423 | |
| Booked a month, pooled | 314 flats | |
| Months to sell, pooled | 22 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 70 m to the south-west, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 2.2 km, Kadugodi | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 38.2 | 39 | 26.2 |
| MG Road (CBD) | 17.8 | 22 | 15.5 |
| Manyata Tech Park | 19.9 | 27 | 16.0 |
| ITPL, Whitefield | 4.9 | 7 | 2.3 |
| Ecospace, Bellandur ORR | 10.3 | 15 | 8.2 |
| Electronic City Ph 1 | 24.8 | 31 | 15.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.6 km to the south, named Prestige Tech Forest Substation on OpenStreetMap |