Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 1 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 93 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Gr Sitara in the interactive atlas
Approval or registration
Land use converted
DC · Survey 9/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DC · Survey 10/4
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹6.51 Cr · Sy 9/3, Rayasandra village, Sarjapura hobli
Title deed filed with K-RERA, pp. 1, 9, 14 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹6.51 Cr · Sy 9/3, Rayasandra village, Sarjapura hobli
Title deed filed with K-RERA, pp. 1, 9, 14 · See it in Documents
Transfer of the land
Title deed registered
No. BSG-1-03762-2020-21 · Book 1 · executed 2 Nov 2020 · Sy 10/4; 10/2, Rayasandra village, Sarjapura hobli, Anekal taluk · 06 Guntas
Title deed filed with K-RERA, pp. 1, 7, 8 · See it in Documents
Transfer of the land
Title deed registered
No. BSG-1-03762-2020-21 · Book 1 · executed 2 Nov 2020 · Sy 10/4; 10/2, Rayasandra village, Sarjapura hobli, Anekal taluk · 06 Guntas
Title deed filed with K-RERA, pp. 1, 7, 8 · See it in Documents
Transfer of the land
Sale deed
in favour of G R Constructions · Survey 9/3, 10/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of G R Constructions · Survey 9/3, 10/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Shanthipura Gram Panchayath · Survey 9/3, 10/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Shanthipura Gram Panchayath · Survey 9/3, 10/4
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/110422/004824
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 19 Nov 2021 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 9-3, 10-4 | |
|---|---|---|
| Land extent, Sy 9-3 | 2 acres 35 guntas/11634.61 | |
| Land extent, Sy 10-4 | 0,6/607.23 | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 12,241 sq m | |
| Khata | E Khatha · Shanthipura Gram Panchayath · 16 Nov 2021 | |
| Sale deed | Dated 2 Nov 2020 | |
| Sale deed in favour of | G R Constructions | |
| Building plan (BDA) | Sanctioned 11 Oct 2021 · No. BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 22 CON 2020 · issued 27 Jul 2020 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 9-3 | Converted 30 Oct 2010 · DC | |
| Sy 10-4 | Converted 30 Oct 2015 · DC | |
| Survey numbers | 9-3 · 10-4 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
Apartment · avg 88 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartment | 250 | 943 |
| Sold, Q2 2026-27 | 250 / 250 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
| Haven Phase 2 | about 1.5 km | Locked | |
|---|---|---|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 1.5 km | Locked | |
| Assetz Muse & Maison | about 2.5 km | Locked | |
| Abhee Riviera Royale | about 2.5 km | Locked | |
| Gr Sitara This project | This project is the point the others are measured from | 31 Dec 2026 | 100% (250 of 250) | Not verified yet |
|---|---|---|---|---|
| Haven Phase 2 | about 1.5 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 1.5 km | 30 Dec 2030 | 69% (302 of 440) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, PARAPPAN AGRAHARA | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.14 (285 covered spaces for 250 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (SHANTHIPURA GRAMA PANCHAYATH) | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 30 Jun 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Dec 2026 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 100% | |
| Completion, accountant | 100% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 20 Jan 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed, 11 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 22 CON 2020 · issued 27 Jul 2020 | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹14.64 Cr 10.7%Development · ₹122.61 Cr 89.3%
| Estimated cost | ₹137.25 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹86.50 Cr | |
| Estimated cost, Form 4 Q4 2025-26 | ₹197.99 Cr | |
| Cost incurred | ₹197.99 Cr (100% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.40 Cr | |
| Land cost revision | Not verified yet | |
Sold (250) 100%
| Sold, Q3 2025-26 | 246 / 250 · 4 available | |
|---|---|---|
| Sold, Q4 2025-26 | 246 / 250 · 4 available | |
| Sold, Q1 2026-27 | 249 / 250 · 1 available | |
| Sold, Q2 2026-27 | 250 / 250 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | STATE BANK OF INDIA · MYSORE BANK CIRCLE | |
|---|---|---|
| Designated account, collected | ₹5.42 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.83 Cr in Q2 2026-27 (89% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹3,60,67,921 | |
| Withdrawn from the escrow account to date | ₹1,94,37,92,964 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 19 Nov 2021 | Review |
| Building plan (BDA) | Sanctioned 11 Oct 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · MYSORE BANK CIRCLE | |

| about 2.5 km |
| Locked |
| Birla Evara | about 3 km | Locked |
|---|
| 63 Degree East - Tower E | about 3 km | Locked |
|---|
| Satori Residence By Genurise | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 3.5 km | Locked |
|---|
| Mahindra Zen | about 3.5 km | Locked |
|---|
| Assetz Muse & Maison |
|---|
| about 2.5 km |
| 31 Mar 2030 |
| 9% (12 of 128) |
| Locked |
| Abhee Riviera Royale | about 2.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
|---|
| Assetz Ren & Rei | about 2.5 km | 31 Jan 2029 | 73% (159 of 218) | Locked |
|---|
| Birla Evara | about 3 km | 25 Dec 2031 | 66% (1,060 of 1,594) | Locked |
|---|
| Projects within 4 km, counted | 78 (78 with an approximate location) | |
|---|---|---|
| Flats in them | 20,929 | |
| Booked | 11,960 of 20,929 (57%) | |
| Unsold | 8,969 | |
| Booked a month, pooled | 268 flats | |
| Months to sell, pooled | 33 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2.5 km, Beratena Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35.5 |
| MG Road (CBD) | 13.5 |
| Manyata Tech Park | 19 |
| ITPL, Whitefield | 13.5 |
| Ecospace, Bellandur ORR | 5 |
| Electronic City Ph 1 | 4.5 |
| Landfill or waste transfer station | about 0.5 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | about 1 km, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | about 2 km to the west, named Naganathapura Substation on OpenStreetMap |