| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: ISHA CORP
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 66 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| – |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Isha Hilife in the interactive atlas
Transfer of the land
Sale deed
Survey 21
K-RERA filing, land schedule
Approval or registration
Land use converted
Disctrict Commissioner, Bangalore Rural · Survey 21
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Samethanahalli Gram Panchayath · Survey 21
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan STRRPA/TP/CC/383/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/030524/006836
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 22, 24 (Thirumaleshettyhalli) |
| East | EC schedule not read yet | Survey 17 (Thirumaleshettyhalli) |
| South | EC schedule not read yet | Survey 20 (Thirumaleshettyhalli) |
| West | EC schedule not read yet | Nothing mapped touching it |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 10,061 sq m | |
| Land area filed with K-RERA | 9,712 sq m | |
| Filed area as a share of the KGIS plots' area | 97% | |
| Village, hobli and taluk on the KGIS map | Thirumaleshettyhalli, Anugondanahalli hobli, Hoskote taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 21 | |
|---|---|---|
| Land extent, Sy 21 | 10,926 sq m | |
| Area on the KGIS map | 10,061 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 9,712 sq m | |
| Khata | E Khatha · Samethanahalli Gram Panchayath · 11 Oct 2022 | |
| Sale deed | Dated 29 Mar 2019 |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 21 | 1 | 2 acres 16 guntas | Yes | 0 |
| Building plan (BMRDA) | Sanctioned 18 Dec 2023 · No. STRRPA/TP/CC/383/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 8 Jan 2021 · Disctrict Commissioner, Bangalore Rural | |
|---|---|---|
| Survey numbers | 21 |
2BHK+studio · avg 82 m² 53.3%3BHK · avg 89 m² 26.7%1BHK+studio · avg 51 m² 13.3%2BHK 6.7%
| 1BHK+studio | 26 | 14,176 |
| 2BHK | 13 | 9,483 |
| 2BHK+studio | 104 | 91,526 |
| 3BHK | 52 | 50,074 |
| Sold, Q2 2026-27 | 195 / 199 | |
|---|---|---|
| Unsold, Q2 2026-27 | 4 | |
| Months to sell, derived from filed bookings | 1 months |
| Sowparnika Rhythm of Rain | about 1.5 km | Locked | |
|---|---|---|---|
| Sowparnika Ashiyana Phase II | about 1.5 km | Locked | |
| Vintage Valley | about 1.5 km | Locked | |
| Kumari Nautilus | about 1.5 km | Locked | |
| Isha Hilife This project | This project is the point the others are measured from | 31 Dec 2026 | 98% (195 of 199) | Not verified yet |
|---|---|---|---|---|
| Sowparnika Rhythm of Rain | about 1.5 km | 15 Jan 2032 | 97% (703 of 725) | Locked |
| Sowparnika Ashiyana Phase II | about 1.5 km | 31 Dec 2025 | 99% (419 of 422) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2.5 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 90% | |
| Water and Sanitation, built | 90% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.09 (212 covered spaces for 195 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Samethana Halli Village Panchayath) | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 31 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Oct 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 95% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 12 Mar 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Residential Apartment Building 42.8 m, Recreational Club Building 24 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 15 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Jul 2026, Aug 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jul 2026, Jul 2026, Aug 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.95 Cr 7%Development · ₹39.36 Cr 93%
| Estimated cost | ₹42.31 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (195) 98%Unsold (4) 2%
| Sold, Q3 2025-26 | 115 / 199 · 84 available | |
|---|---|---|
| Sold, Q4 2025-26 | 142 / 199 · 57 available | |
| Sold, Q1 2026-27 | 131 / 199 · 68 available | |
| Sold, Q2 2026-27 | 195 / 199 · 4 available | |
| Unsold, Q2 2026-27 | 4 | |
| Sold in Q4 2025-26 | 27 | |
| Sold in Q1 2026-27 | 11 bookings cancelled or corrected (142 → 131 sold) | |
| Sold in Q2 2026-27 | 64 | |
| Flats booked, Form 4 Q1 2026-27 | 131 |
| Escrow bank | Axis Bank · Channasandra Main Road | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 18 Dec 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Channasandra Main Road | |

| about 2 km |
| Locked |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 2 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2 km | Locked |
|---|
| Nirmaanika Aria | about 3.5 km | Locked |
|---|
| Assetz 66 & Shibui | about 3.5 km | Locked |
|---|
| Reflections 66 | about 4.5 km | Locked |
|---|
| Axis Ekatva | about 4.5 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 5 km | Locked |
|---|
| Vintage Valley | about 1.5 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Kumari Nautilus | about 1.5 km | 12 Jan 2028 | 69% (114 of 165) | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 2 km | 31 Mar 2028 | 100% (210 of 210) | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 2 km | 30 Apr 2026 | 100% (197 of 197) | Locked |
|---|
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 13,229 | |
| Booked | 7,948 of 13,229 (60%) | |
| Unsold | 5,281 | |
| Booked a month, pooled | 99 flats | |
| Months to sell, pooled | 49 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 3 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 42 | 25.5 |
| MG Road (CBD) | 24 | 20 |
| Manyata Tech Park | 23.5 | 19 |
| ITPL, Whitefield | 5.5 | 5 |
| Ecospace, Bellandur ORR | 16.5 | 13 |
| Electronic City Ph 1 | 30 | 19.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-west, named Whitefield on OpenStreetMap |