Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: M/S. JAGATI INFRA
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 60 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shubha Nivas in the interactive atlas
Transfer of the land
Sale deed
Survey 154/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 154/5
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Rural · Survey 154/1, 154/5
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Rural · Survey 154/1, 154/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayat · Survey 154/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayat · Survey 154/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan STRRPA/TP/CC/186/2022-2033
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/060423/005839
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: need akarband and survey sketch.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 154/1, 154/5 | |
|---|---|---|
| Land extent, Sy 154/1 | 1 Acre 3.08 Guntas | |
| Land extent, Sy 154/5 | 6.08 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,856 sq m | |
| Khata | E Khatha · Panchayat · 23 Aug 2022; E Khatha · Panchayat · 8 Aug 2022 | |
| Sale deed | Dated 1 Sep 2004, 18 Jun 2020 | |
| Building plan (Local Planning Authority) | Sanctioned 19 Sep 2022 · No. STRRPA/TP/CC/186/2022-2033 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 23 Feb 2022 · DC Bangalore Rural | |
|---|---|---|
| Survey numbers | 154/1 · 154/5 |
2BHK · avg 67 m² 90%3BHK 10%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 72 | 52,205 |
| 3BHK | 8 | 7,535 |
| Sold, Q2 2026-27 | 54 / 80 | |
|---|---|---|
| Unsold, Q2 2026-27 | 26 | |
| Months to sell, derived from filed bookings | 16 months |
| Kumari Nautilus | about 1.5 km | Locked | |
|---|---|---|---|
| Nirmaanika Aria | about 2 km | Locked | |
| Vintage Valley | about 2.5 km | Locked | |
| Sowparnika Euphoria in the East | about 2.5 km | Locked | |
| Sowparnika Rhythm of Rain |
| Shubha Nivas This project | This project is the point the others are measured from | 31 Dec 2026 | 68% (54 of 80) | Not verified yet |
|---|---|---|---|---|
| Kumari Nautilus | about 1.5 km | 12 Jan 2028 | 69% (114 of 165) | Locked |
| Nirmaanika Aria | about 2 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
| Vintage Valley | about 2.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 95% | |
| Community Hall, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (88 covered spaces for 80 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station |
|---|
As the promoter reported it

| Main structure | 100% · planned by 20 Aug 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 90% · planned by 20 Sep 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 15 Nov 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Jan 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 2 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.36 Cr 5.6%Development · ₹22.86 Cr 94.4%
| Estimated cost | ₹24.23 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (54) 67.5%Unsold (26) 32.5%
| Sold, Q3 2025-26 | 39 / 80 · 41 available | |
|---|---|---|
| Sold, Q4 2025-26 | 44 / 80 · 36 available | |
| Sold, Q1 2026-27 | 39 / 72 · 33 available | |
| Sold, Q2 2026-27 | 54 / 80 · 26 available | |
| Unsold, Q2 2026-27 | 26 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 5 bookings cancelled or corrected (44 → 39 sold) | |
| Sold in Q2 2026-27 | 15 |
| Escrow bank | STATE BANK OF INDIA · Whitefield | |
|---|---|---|
| Designated account, collected | ₹1.94 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.63 Cr in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹25,02,33,744 | |
| Net amount withdrawable, Form 4 | ₹37,467 | |
| Withdrawn from the escrow account to date | ₹25,01,96,276 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 19 Sep 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Whitefield | |

| about 2.5 km |
| Locked |
| Sowparnika Ashiyana Phase II | about 3 km | Locked |
|---|
| Godrej Splendour | about 3.5 km | Locked |
|---|
| Godrej Splendour Phase II | about 3.5 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 4 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 4 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 4 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 4.5 km | Locked |
|---|
| 31 Jan 2030 |
| 56% (27 of 48) |
| Locked |
| Sowparnika Euphoria in the East | about 2.5 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Sowparnika Rhythm of Rain | about 2.5 km | 15 Jan 2032 | 97% (703 of 725) | Locked |
|---|
| Sowparnika Ashiyana Phase II | about 3 km | 31 Dec 2025 | 99% (419 of 422) | Locked |
|---|
| Projects within 4 km, counted | 43 (43 with an approximate location) | |
|---|---|---|
| Flats in them | 18,626 | |
| Booked | 12,456 of 18,626 (67%) | |
| Unsold | 6,170 | |
| Booked a month, pooled | 117 flats | |
| Months to sell, pooled | 49 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 39.5 | 23 |
| MG Road (CBD) | 33 | 19.5 |
| Manyata Tech Park | 32.5 | 18 |
| ITPL, Whitefield | 8 | 5 |
| Ecospace, Bellandur ORR | 18.5 | 14 |
| Electronic City Ph 1 | 32.5 | 21.5 |
| None within 3 km |
| Sewage treatment plant | about 1 km, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|